Permit Information
Permit NumberBLD07-03071
StatusFinaled
Name PRIMARY CONSTRUCTION INC
Site Address 1803 S MAPLE GROVE RD
Project NameLife Church
Customer Number 
ePlanReviewNo
Description
Life Church (Youth Room Addition) -Permit to construct a 1640 square foot addition onto an existing 7,644 square foot A-3 (church) building. Existing building was built in Ada County and annexed Dec.27, 2004 into the City of Boise. Scope of work includes: new foundation, new exterior bearing walls, new interior non-bearing partition walls to separate, two offices, a coffee room, storage closet, and a youth room, new electrical on addition only, new mechanical unit serving only the addition, and interior finishes per Chapter 8 of the 2003 IBC. The existing portion of this building is not being modified. This building is not fire-sprinklered.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/29/20091/29/20092/5/2009 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD1/2/20091/2/20091/29/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 10/30/20081/2/2009 DONE
Permanent Occupancy  10/30/2008 PASS
DetailsBarbara Stitt
BLD-Final6/6/20086/6/20086/6/2008PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/6/2008 at 9:10:02 AM. Contact: ###-####. ok for perm occ. All issues previosly noted have been corrected.
Plan Reviewer's activity  5/12/2008 DONE
Recieved ramp detail that was requested by Field inspector (Michel Jordan) and approved them as submitted. Left detail in inspectors in-box.
BLD-Final4/29/20084/30/20084/30/2008PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/29/2008 at 3:24:14 PM. Contact: ###-####. Provide tempered glazing at window within 24in. of west exit door. Provide labeling on doors at 2hr firebarrier wall and approved hardware were needed. Architect to provide drawing of handrails, guards and ramps and asses asphalt extension of ramp and submit to plan review for approval. Asphalt portion not code compliant, hand rails, edge protection missing on opposite side.
FIRE-Final Inspection4/28/20084/29/20084/29/2008PPASS
DetailsTroy Cobbley
life safety passed
Code Occupancy Approval4/25/20084/25/20084/25/2008PPASS
DetailsScott M.Brown
all in as required, final signed off
BLD-Other3/31/20083/31/20083/31/2008APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/31/2008 at 5:58:29 AM. Contact: ###-####.
BLD-Other3/28/20083/28/20083/28/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/28/2008 at 9:22:43 AM. Contact: ###-####. 1st layer of 2hr wall on addition side.
BLD-Energy code compliance3/27/20083/28/20083/28/2008APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/27/2008 at 11:24:44 AM. Contact: ###-####. ok to cover.
BLD-Energy code compliance3/26/20083/26/20083/26/2008PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/26/2008 at 11:00:21 AM. Contact: ###-####. Nees to remove insul. and sheetrock for elec ri insp.
BLD-Framing/Rough-in3/25/20083/25/20083/25/2008PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/25/2008 at 5:56:52 AM. Contact: ###-####. ok to insul.
BLD-Other3/13/20083/14/20083/14/2008APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/13/2008 at 1:32:47 PM. Contact: ###-####.
BLD-Other3/7/20083/10/20083/10/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/7/2008 at 7:12:43 AM. Contact: ###-####. exterior shear nail on south half og bldg. 1st. layer of 2hr. wall on addition side.
BLD-Other3/7/20083/7/20083/7/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/7/2008 at 7:11:42 AM. Contact: ###-####.
BLD-Concrete2/28/20082/29/20082/29/2008PPASS
DetailsMike Jordan
mike \\pouring around 2:00 Phone #: ###-####
BLD-Footing2/26/20082/27/20082/27/2008APASS
DetailsMike Jordan
mike Phone #: ###-####. perimeter footings, and interior footings.
BLD-Framing/Rough-in2/21/20082/22/20082/22/2008APART
DetailsMike Jordan
Paul-inspection for drywall please Phone #: ###-####. 1st layer 2hr. fire barrier wall. ok.
Routing - FIRE2/20/2008 2/21/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK2/21/2008 2/21/2008 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  2/21/2008 DONE
Print Occupancy Form  2/21/2008 DONE
Permit Ready to Issue  2/21/2008 DONE
Telephone call  2/21/2008  
Called Russ Phillips told him permit is ready, fees due, that we need RP and GC information///2-21-08 @ 3:51pm BAS
Issue PAID IN FULL permit  2/21/2008 DONE
Plan assigned to (TLW)11/30/2007 2/21/2008 PASS
DetailsTim L. Woodard
2/21/2008 15:07:02 TLW - activity updated through activity BLDA022 from case BLD07-03071.
Routing - PLAN CHECK2/14/2008 2/20/2008 PASS
DetailsTim L. Woodard
Engineering corrected to match architectural details.
Routing - FIRE2/20/2008 2/20/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  2/20/2008 FAIL
Failed Plan Check, Fire
Routing - PLAN CHECK2/20/2008 2/20/2008 PEND
DetailsTim L. Woodard
Routed to fire.
Plan resubmittals received  2/20/2008  
received 1 transmittal, and 2 copies of vicinity map,,united water taken to Tim W.
Plan resubmittals received  2/19/2008  
received transmittal from insight arch & "2" copies of structural calcs.(4) pages each-- paperwork taken to Tim Woodard
Routing - PLAN CHECK2/13/2008 2/14/2008 FAIL
DetailsTim L. Woodard
Engineering doesn't match plans. Refer to plan review report.
Routing - PLUMBING2/8/2008 2/13/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Plan resubmittals received  2/11/2008  
received transmittal and two copies of sturctural calculations; inserted into plans by LEG and taken back to Plumbing
Routing - PLAN CHECK1/17/2008 2/8/2008 PEND
DetailsTim L. Woodard
Routed to Plumbing for re-review. I am waiting for the engineering calcs. to be resubmitted for new design. TLW
Plan resubmittals received  2/6/2008 DONE
received 1 transmittal,1 comments and 2 copies of sheets A0.1,A21.0,A1.0,A2.0,A3.0,A4.0,A5.0,A6.0,A7.0 inserted by Dana Kauffman from Insite Architects and plans taken back to Tim W.
Routing - PLAN CHECK1/17/2008 1/17/2008 FAIL
DetailsTim L. Woodard
Resubmittals required. Review required redesign of the building. Talked with fire will wait to rout plans to scott until resubmittals are recieved.
1st review completed  1/17/2008 FAIL
Resubmittals required. Review required redesign of the building. Talked with fire will wait to rout plans to scott until resubmittals are recieved.
Plan resubmittals received  1/16/2008 DONE
DetailsTim L. Woodard
Original building plans were submitted as I requested. 16 Sheets.
Routing - PLAN CHECK12/14/2007 1/14/2008 PEND
DetailsTim L. Woodard
No records on file property annexed in Dec. of 2004 need original plans or full building code analysis. TLW
Plan resubmittals received  12/27/2007  
Received two copies of page P1; inserted by LEG and put on Tim Woodard's desk
Routing - PLANNING12/12/2007 12/12/2007 PASS
Susan R.
Routing - PLUMBING12/11/2007 12/11/2007 FAIL
provide plumbing plans per 2003 upc
Routing - Erosion and Sediment12/7/2007 12/11/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS12/6/2007 12/7/2007 PASS
Routing PW Drainage12/6/2007 12/7/2007 PASS
Routing PW Sewer Rating12/7/2007 12/7/2007 PASS
Routing PW Solid Waste12/7/2007 12/7/2007 PASS
Routing - PLANNING Land Div11/30/2007 12/6/2007 PASS
Plan routing begun/NEW & ADDTN  11/30/2007  
Plans ACCEPTED BY PLAN TECH  11/30/2007  
per Barb S. from Steve W. ok to take in w/out signature on esc sheet.

per Barb S. from Cody R. ok to take in plans.

Application received  11/28/2007