(DATA PROJECTIONS - EMERALD TECH BLDG #12) To construct a 4,946 sq.ft. office / retail space with warehouse with in a 11,900 square foot shell building (constructed under BLD06-01810) per approved plans. Work to include, construction of interior nonbearing partitions to create reception area, office spaces, conference room, showroom, mens and womens accessible restrooms, and warehouse, installation of three new roof top HVAC units and related ducting, installation of suspended ceiling and related lighting, installation of accessible drinking fountain, janitors sink and breakroom sink, miscellaneous related interior finishes. This building is fully fire sprinkled any alterations to the sprinkler system shall be installed and maintained per NFPA #13 as regulated by the fire department. No storage racking over eight feet high shall be installed without a separate permit. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (FNL)  11/29/2011 DONE
collection fees were written off per RAD - changed status back to final
CHANGE STATUS TO (COL)  11/2/2009 DONE
Telephone call  3/10/2009 DONE
Details
left vm for keri at ###-#### asking for a call back re: past due fees
Third Notice BLD9/22/20089/22/200812/30/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 4/29/20088/11/2008 DONE
Permanent Occupancy  4/29/2008 DONE
BLD-Final4/24/20084/25/20084/25/2008PPASS
DetailsMike Jordan
Wayne Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection4/25/20084/25/20084/25/2008PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection4/24/20084/25/20084/25/2008AFAIL
DetailsTroy Cobbley
Provide the correct building address.
BLD-Framing/Rough-in3/28/20083/31/20083/31/2008APART
DetailsMike Jordan
phillip NOte: ceiling grid Phone #: ###-####. Still needs to wire can lights. Wiil check on final insp.
BLD-Wall cover3/26/20083/27/20083/27/2008PCANC
DetailsMike Jordan
Phillip, drop ceiling inspection, please; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt This was canceld
BLD-Framing/Rough-in3/26/20083/26/20083/26/2008PCANC
DetailsMike Jordan
phillip Phone #: ###-####
BLD-Energy code compliance2/6/20082/7/20082/7/2008APASS
DetailsMike Jordan
phillip Phone #: ###-####
BLD-Framing/Rough-in2/6/20082/7/20082/7/2008APASS
DetailsMike Jordan
phillip Phone #: ###-####. Walls and hardlid only. no grid.
BLD-Framing/Rough-in2/1/20082/4/20082/4/2008PPASS
DetailsMike Jordan
phillip Phone #: ###-#### ok to insul.
FIRE-Conference1/17/20081/18/20081/18/2008ADONE
DetailsTroy Cobbley
I went over fire extinguisher requirements with the superintendant
Print Occupancy Form  1/8/2008 DONE
Telephone call  1/8/2008 DONE
left vm for wes steele at ###-#### - permit ready and fees given
Permit Ready to Issue  1/8/2008 DONE
Issue PAID IN FULL permit  1/8/2008 DONE
(F) Reprint permit  1/8/2008 DONE
(F) Reprint permit  1/8/2008  
Routing - PLAN CHECK1/3/2008 1/7/2008 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  1/7/2008 DONE
Case Summary (BLD)  1/7/2008 DONE
Plan assigned to (TLW)12/11/2007 1/7/2008 PASS
DetailsTim L. Woodard
1/7/2008 15:38:39 TLW - activity updated through activity BLDA022 from case BLD07-03081.
Routing - PLANNING12/12/2007 1/7/2008 PASS
DetailsSarah Schafer
Sarah Schafer (verify that office usage allowed in M-1D zone)

Office use approved per CUP06-00101.

Sarah approved this permit on plans and in note above.I added approval in tidemark. TLW
Routing - FIRE1/2/2008 1/3/2008 PASS
DetailsKenneth R Roule
Passed IFC 2003
1st review completed  1/3/2008 PASS
Routing - PLAN CHECK12/12/2007 1/2/2008 PASS
DetailsTim L. Woodard
Per approved plans and plan review report.
Routing - PUBLIC WORKS12/11/2007 12/12/2007 PASS
Pending Assignment by MYS12/3/2007 12/11/2007 DONE
12/11/2007 10:46:17 MYS - activity updated through activity BLDA185 from case BLD07-03081.
Plans ACCEPTED BY PLAN TECH  12/3/2007  
Recd Pcfee & Taken To Pln CK  12/3/2007  
Application received  12/3/2007