Third Notice BLD | 9/22/2008 | 9/22/2008 | 12/22/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Case Summary (BLD) | | | 12/19/2008 | | |
|
|
|
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/29/2008 | 8/11/2008 | | DONE |
|
|
|
|
BLD-Final | 4/28/2008 | 4/28/2008 | 4/29/2008 | P | PASS |
Dave Hannah
|
|
|
pls coordinate with fire final if possible. thank you. Phone #: ###-#### Internet Inspection Request from: John Lodman ok for perm occ
|
Permanent Occupancy | | | 4/29/2008 | | |
Cathy Weisshaupt
|
|
|
|
FIRE-Final Inspection | 4/28/2008 | 4/28/2008 | 4/28/2008 | P | PASS |
Troy Cobbley
|
|
|
Door hardware changed as per Forrest France notes. KR
|
BLD-Final | 4/21/2008 | 4/22/2008 | 4/23/2008 | P | FAIL |
Dave Hannah
|
|
|
please note that the mec08-00569 permit linked to this permit is not correct, should be on the bonefish grille permit. Phone #: ###-#### Internet Inspection Request from: John Lodman need to install door hardwear
|
BLD-Final | 4/21/2008 | 4/21/2008 | 4/22/2008 | P | CANC |
Dave Hannah
|
|
|
please note that the mec08-00569 permit linked to this permit is not correct, should be on the bonefish grille permit. Phone #: ###-#### Internet Inspection Request from: John Lodman
|
FIRE-Final Inspection | 4/21/2008 | 4/21/2008 | 4/21/2008 | P | FAIL |
Forrest France
|
|
|
Door hardware is not approved as installed.
|
Code Occupancy Approval | 4/21/2008 | 4/21/2008 | 4/21/2008 | P | PASS |
Joe R Venneman
|
|
|
Doors are finally in and meet the BLD plan requirements
|
Code Occupancy Approval | | | 4/21/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/13/2008 | | DONE |
|
|
|
Received a call from the contractor stating that he will not be ready for a CODE inspection for a few more days; waiting on a door to come for installation. He thinks it will be early next week and will call for an inspection time.
|
BLD-Framing/Rough-in | 2/28/2008 | 2/29/2008 | 2/29/2008 | P | PASS |
Dave Hannah
|
|
|
pending morning fire sprinkler cover approval. thank you. Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Framing/Rough-in | 2/22/2008 | 2/22/2008 | 2/22/2008 | P | DONE |
Dave Hannah
|
|
|
Requesting partial cover approval for column wraps only. Plumbing and elect inspections for two hose bibbs and a couple of outlets are this afternoon also. Soffit cover will be requested at a later date. Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Framing/Rough-in | 2/22/2008 | 2/22/2008 | 2/22/2008 | P | PASS |
Dave Hannah
|
|
|
Requesting partial cover approval for column wraps only. Plumbing and elect inspections for two hose bibbs and a couple of outlets are this afternoon also. Soffit cover will be requested at a later date. Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Foundation | 2/18/2008 | 2/19/2008 | 2/19/2008 | A | PASS |
Dave Hannah
|
|
|
arch wraps of struct columns. epoxy dowels were inspected by MTI as discussed previously. Pour is 9:00 am today! Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Other | 2/12/2008 | 2/12/2008 | 2/13/2008 | P | PART |
Dave Hannah
|
|
|
john - deck pour Phone #: ###-#### spec inspection oked steel and deck ok to pour deck
|
BLD-Footing | 2/5/2008 | 2/6/2008 | 2/6/2008 | A | PASS |
Dave Hannah
|
|
|
1st thing am please- approved to start pour by Mike Jordan. Thank you. Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Footing | 2/4/2008 | 2/5/2008 | 2/5/2008 | P | PART |
Mike Jordan
|
|
|
late afternoon if possible please Phone #: ###-#### Internet Inspection Request from: John Lodman.. colummn pad footings for exterior terrace. footings at exisiting planter not per plan.
|
FIRE-Conference | 2/4/2008 | 2/5/2008 | 2/5/2008 | A | DONE |
Forrest France
|
|
|
Site conference regarding hardware issues for relocated doors, also discussed project related fire alarm and sprinkler permits required.
|
BLD-Footing | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | CANC |
Dave Hannah
|
|
|
John late pm if possible Phone #: ###-####-Cancel per John Lodman on 2/4/08 @ 11:47am BAS
|
Issue PAID IN FULL permit | | | 2/4/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/1/2008 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/1/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/1/2008 | | |
|
|
|
Mr. Lodman called me this morning regarding the permit for the fees and if ready to be picked up
|
1st review completed | | | 1/31/2008 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/31/2008 | | 1/31/2008 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2008 | | DONE |
|
|
|
|
Routing - FIRE | 1/30/2008 | | 1/31/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan assigned to (CJW) | 12/12/2007 | | 1/31/2008 | | PASS |
Carl Westfall
|
|
|
1/31/2008 15:25:00 CJW - activity updated through activity BLDA022 from case BLD07-03090.
|
Routing - PLAN CHECK | 12/14/2007 | | 1/30/2008 | | PASS |
Carl Westfall
|
|
|
The IBC plan review was started and finished on January 30, 2008. The drawings were approved with "red lines". See the plan review report.
|
Routing - PLANNING | 12/13/2007 | | 12/14/2007 | | PASS |
Julie Archambeault
|
|
|
Julie Archambeault DRH07-00425
|
Routing - PLUMBING | 12/13/2007 | | 12/13/2007 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 12/12/2007 | | 12/13/2007 | | PASS |
Steven Webb
|
|
|
ESC waiver request approved with attached conditions.
|
Routing PW Sewer Rating | 12/12/2007 | | 12/12/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/12/2007 | | 12/12/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 12/4/2007 | | 12/12/2007 | | DONE |
|
|
|
12/12/2007 11:27:17 MYS - activity updated through activity BLDA172 from case BLD07-03090.
|
Plans ACCEPTED BY PLAN TECH | | | 12/5/2007 | | |
|
|
|
|
Application received | | | 12/4/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/4/2007 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/12/2007 | | | | |
|
|
|
|