BLD-Final | 9/29/2008 | 9/29/2008 | 9/29/2008 | P | PASS |
Jim Storey
|
|
|
steve Phone #: ###-####
|
DOC - Permit Finaled | 9/29/2008 | 9/29/2008 | 9/29/2008 | P | PASS |
Jim Storey
|
|
|
|
Code Occupancy Approval | | | 7/10/2008 | | DONE |
|
|
|
PASS landscaping and elevation requirements met. Nice looking unit
|
Extend Permit 180 days | 4/18/2008 | 4/18/2008 | 4/18/2008 | A | PASS |
Jim Storey
|
|
|
garge gable protected ok to cover
|
BLD-Conference | 4/10/2008 | 4/11/2008 | 4/11/2008 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/10/2008 at 4:56:32 PM. Contact: ###-####. garge gable must be 2 hr no eave per plan
|
BLD-Wall cover | 4/8/2008 | 4/8/2008 | 4/8/2008 | A | PASS |
Jim Storey
|
|
|
dewelling fire wall ok
|
BLD-Energy code compliance | 4/4/2008 | 4/4/2008 | 4/4/2008 | P | PASS |
Jim Storey
|
|
|
Steve; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Framing/Rough-in | 4/2/2008 | 4/3/2008 | 4/3/2008 | A | PART |
Jim Storey
|
|
|
steve Phone #: ###-#### repair fire walls at upper pick points to maintane ratting/ fire blk. stairs at unusable space. ok to insulate.
|
BLD-Conference | 2/20/2008 | 2/20/2008 | 2/20/2008 | P | PART |
Jim Storey
|
|
|
Steve Phone #: ###-#### 2 hr gyp ok on p/l walls
|
BLD-Conference | 2/14/2008 | 2/15/2008 | 2/15/2008 | A | PASS |
Jim Storey
|
|
|
Steve Phone #: ###-#### reviewed plan w/frammer
|
BLD-Footing | 2/6/2008 | 2/7/2008 | 2/7/2008 | P | PASS |
Jim Storey
|
|
|
terry Phone #: ###-####
|
BLD-Footing | 2/4/2008 | 2/5/2008 | 2/5/2008 | P | PASS |
Jim Storey
|
|
|
steve Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/29/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/28/2008 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/28/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/24/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 1/24/2008 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/24/2008 | | DONE |
|
|
|
|
Pending Assignment by SRZ | 12/7/2007 | | 1/24/2008 | | DONE |
Ben S. Pavelka
|
|
|
|
Routing - PLAN CHECK | 1/9/2007 | | 1/24/2008 | | PASS |
Ben S. Pavelka
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 1/16/2008 | | FAIL |
Ben S. Pavelka
|
|
|
Need resubmittal on eight items. I contacted Stephen Renberg on 1-16-08 to share these items and faxed a list of these items to ###-####. (BSP)
|
Routing - PLANNING | 1/9/2008 | | 1/9/2008 | | PASS |
Susan Riggs
|
|
|
|
Routing - PUBLIC WORKS | 12/11/2007 | | 12/12/2007 | | PASS |
|
|
|
|
Routing - PLANNING | 12/10/2007 | | 12/11/2007 | | FAIL |
|
|
|
Route to Susan Riggs per CUP07-00058
These plans are failed due to the lack of a Design Review Modification. I called Steve Renberg and told him he would need to speak to Sara Schafer about submitting staff level DR modification. Sara said she will waive the appeal period.
Susan Riggs / ###-#### 12/14/07
Plans are in the fail drawer behind the front planning counter.
|
Routing - Addressing | 12/10/2007 | | 12/10/2007 | | PASS |
|
|
|
|
Application received | | | 12/7/2007 | | |
|
|
|
|