Second Notice BLD | 3/6/2009 | 3/6/2009 | 3/17/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/23/2009 | 3/6/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/23/2009 | | DONE |
|
|
|
|
BLD-Final | 2/13/2009 | 2/13/2009 | 2/13/2009 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/13/2009 at 8:55:04 AM. Contact: ###-####. copy of si report recieved and aproved will archive. final ok card signed on site.
|
FIRE-Final Inspection | 2/11/2009 | 2/12/2009 | 2/12/2009 | P | PASS |
Troy Cobbley
|
|
|
Fire/Life Safety passed
|
FIRE-Final Inspection | 12/29/2008 | 12/30/2008 | 12/30/2008 | A | DONE |
Troy Cobbley
|
|
|
The new addition is passed the fire life safety inspection except the large pre-action computer room which still needs the hvac shut down and the alarm strobe repaired as noted on the project related fire alarm activities. Also the two rooms being remodeled in the existing portion of the facility need to be finished prior to a final on this project.
|
Zoning Approval | 11/5/2008 | 11/5/2008 | 11/5/2008 | | PASS |
Andrea Tuning
|
|
|
|
BLD-Other | 11/4/2008 | 11/4/2008 | 11/4/2008 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/4/2008 at 7:36:14 AM. Contact: ###-####. ceiling grid at meeting rooms ok.
|
BLD-Other | 10/28/2008 | 10/29/2008 | 10/29/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/28/2008 at 3:34:46 PM. Contact: ###-####. Ceiling grid in data room ok.
|
BLD-Final | 10/27/2008 | 10/28/2008 | 10/28/2008 | A | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/27/2008 at 1:28:27 PM. Contact: ###-####.
|
BLD-Other | 10/28/2008 | 10/28/2008 | 10/28/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/27/2008 at 1:28:27 PM. Contact: ###-####. Ceiling grid, pend. elec. ri. insp. Install not completed. waiting for additional info from architect on grid type. Also requested letter from unistrut stating system was installed per manufactures recomendations. Will call for reinspection in the am.
|
(F) Reprint permit | | | 9/9/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/9/2008 | | DONE |
Tisha Gallop
|
|
|
picked up and paid for plan mod
|
OVERRIDE | | | 9/8/2008 | | |
|
|
|
|
Plan assigned to (JCM) | 9/3/2008 | | 9/8/2008 | | PASS |
John Menard
|
|
|
9/8/2008 11:22:10 JCM - activity updated through activity BLDA022 from case BLD07-03132.
|
Routing - PLAN CHECK | 9/3/2008 | | 9/8/2008 | | PASS |
John Menard
|
|
|
Plan modification
|
Plan Reviewer's activity | | | 9/8/2008 | | PASS |
|
|
|
Review and approve plan modification to remodel portions of the southeast corner of the existing office building. To convert a 525 square foot storage area to a 420 sq. ft. office and 105 sq. ft. computer room. To remodel a 775 sq. ft. office area and add an interior partion at the east end of the existing break room to create a new 140 sq. ft. storage room accessed from th office area. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2008 | | DONE |
John Menard
|
|
|
|
Telephone call | | | 9/8/2008 | | DONE |
|
|
|
t/c w david blodgett at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 9/8/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 9/8/2008 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 9/2/2008 | | |
John Menard
|
|
|
Accepted plan modification for remodel of 1,700 sq ft at the southeast corner of existing building, to be used as office and support area. 3 copies of sheets A0.01, A0.03, A9.01, A9.02, M2.2, E2.1A
|
Received Certificate of Value | | | 9/2/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
Additional value added
|
BLD-Wall cover | 8/25/2008 | 8/26/2008 | 8/26/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/25/2008 at 4:09:15 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/21/2008 | 7/22/2008 | 7/22/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/21/2008 at 3:29:20 PM. Contact: ###-####. perimeter fur out walls against tilt up panels. pend. elec. ri insp.
|
BLD-Concrete | 6/4/2008 | 6/5/2008 | 6/5/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/4/2008 at 4:27:22 PM. Contact: ###-####. Reinforcement for concrete tilt panels #7-12 and#19-21. ok.
|
BLD-Aging Inspection | 5/13/2008 | 5/13/2008 | 5/14/2008 | | PART |
Mike Jordan
|
|
|
wip.
|
BLD-Concrete | 5/8/2008 | 5/9/2008 | 5/9/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/8/2008 at 4:03:31 PM. Contact: ###-####. Panels for East wall of addition appear OK pending special inspection, tests and approvals from MTI.
|
BLD-Footing | 4/22/2008 | 4/23/2008 | 4/23/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/22/2008 at 5:00:07 PM. Contact: ###-####. Footing for tilt panels at existing bldg. and at northside elevation change. Noted special insp. on site.
|
BLD-Footing | 4/3/2008 | 4/4/2008 | 4/4/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/3/2008 at 8:58:43 AM. Contact: ###-####. South and west perimeter footings for west addition, interior colun pad foorings for west addition. Noted that MTI is the special insp. agency and will be their for the conc. placement.
|
Issue PAID IN FULL permit | | | 2/7/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/5/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/5/2008 | | DONE |
|
|
|
left message w cinnamon for david blodgett at ###-#### - permit ready and fees given - also need rp name and ACHD receipt
|
Permit Ready to Issue | | | 2/5/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/4/2008 | | 2/4/2008 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2008 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 1/30/2008 | | 2/4/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 1/30/2008 | | 2/4/2008 | | PASS |
Brian McMahon
|
|
|
|
Plan assigned to (JCM) | 12/10/2007 | | 2/4/2008 | | PASS |
John Menard
|
|
|
2/4/2008 15:07:28 JCM - activity updated through activity BLDA022 from case BLD07-03132.
|
Plan resubmittals received | | | 2/1/2008 | | |
|
|
|
received five copies of sheets C2.0, C2.1; inserted by eng. rep. and taken back to Brian Murphy
|
Routing - PLAN CHECK | 1/28/2008 | | 1/30/2008 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 1/30/2008 | | |
|
|
|
received letter of transmittal from pinnacle eng & "5" sheets each of C2.O--plans taken back to John Menard
|
Routing - PLUMBING | 1/25/2008 | | 1/28/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 1/23/2008 | | 1/25/2008 | | |
John Menard
|
|
|
|
Routing - FIRE | 1/22/2008 | | 1/23/2008 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC review comments to plans.
|
Plan Reviewer's activity | | | 1/22/2008 | | PASS |
|
|
|
Reviewed and approved structural and nonstructural revisions. JCM
|
Routing - PLAN CHECK | 1/14/2008 | | 1/22/2008 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 1/18/2008 | | |
|
|
|
received letter of transmittal from rudeen & associates & letter with comments (5) pages, letter for fire review (12) pages, letter from pinnacle eng. (5) pages of structural review, letter from burr computer enviornments for plum review (2) pages, "3" review comment calcs from pinnacle, also "3" sets of plans with each sheet of SO.O1, S1.O2, S2.O1, S3.O1, S3.O1, S3.O2, S4.O1, S4.O2, & "2" sets of plans each sheet of AO.O3, AO.11, A2.O1, A2.O2, A2.12, A5.O1, A6.O1, FPO.1, FP1.1, P1.1, P3.1, & E2.2//plans taken to John Menard
|
Telephone call | | | 1/15/2008 | | DONE |
Scott Arellano
|
|
|
Telephoned David Blodgett and informed him that no additional fire hydrants will be requried; per the Boise City Assistant Fire Marshal, Mark Senteno.
|
1st review completed | | | 1/14/2008 | | FAIL |
|
|
|
Failed P.W., Plumbing, Drainage, Plan Check, Fire
|
Routing - FIRE | 1/9/2008 | | 1/14/2008 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
Routing - PLAN CHECK | 12/27/2007 | | 1/9/2008 | | FAIL |
John Menard
|
|
|
John M.
|
Plan resubmittals requested | | | 1/9/2008 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Plan resubmittals requested | | | 1/2/2008 | | DONE |
|
|
|
Faxed the architect a copy of the structural plan review requesting revisions. JCM
|
Routing - PLANNING | | | 12/27/2007 | | PASS |
|
|
|
Approved per DRH07-00464
|
Routing Off Site - STRUCTURAL | 12/10/2007 | | 12/27/2007 | | FAIL |
|
|
|
Called action Couriers for pick up - Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PLUMBING | 12/20/2007 | | 12/26/2007 | | FAIL |
|
|
|
Hose bibbs must be supplied with potable water sourse
|
Routing - Erosion and Sediment | 12/19/2007 | | 12/20/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 12/12/2007 | | 12/19/2007 | | FAIL |
|
|
|
|
Routing PW Solid Waste | 12/17/2007 | | 12/19/2007 | | PASS |
|
|
|
Existing trash enclosure is acceptable. Any relocation or modification must be reviewed by the Public Works Environmental Division, ###-####.
|
Routing PW Drainage | | | 12/17/2007 | | FAIL |
Brian Murphy
|
|
|
CALC QUESTION ON SEEPAGE BED DESIGN. BRIAN MURPHY ###-####
|
Routing PW Sewer Design | 12/12/2007 | | 12/14/2007 | | PASS |
|
|
|
|
Routing PW Street Lights | 12/14/2007 | | 12/14/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 12/12/2007 | | 12/12/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 12/11/2007 | | 12/12/2007 | | PASS |
|
|
|
Site is Parcel "A" on Record of Survey #5571. Recorded on 10/16/01. Property Line Adjustment for Stillwell Trust Agreement and signed by Boise City Engineer on October 11, 2001.
|
Application received | | | 12/10/2007 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/10/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/10/2007 | | |
|
|
|
|
PubWorks Occupancy Approval | 11/7/2008 | 11/7/2008 | | | |
|
|
|
|