Permit Information
Permit NumberBLD07-03134
StatusFinaled
Name INTERMOUNTAIN PROPERTY DEVELOPMENT
Site Address 3858 N GARDEN CENTER WAY
Project NameGarden Center
Customer Number 
ePlanReviewNo
Description
Garden Plaza - Office/Retail (shell & core) - To construct a new 21,000 square foot, three story steel frame and masonry retail and office building shell and core and related site improvements. The finished core areas include first floor: entry lobby, restrooms, elevator and elevator machine room, janitor closet, fire riser room and two enclosed stairways; second floor: two restrooms, janitor closet and hallway; third floor: two restrooms and janitor closet. This is a shell and core permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. 1st Fl. 6,890 sq. ft., 2nd Fl. 6,970 sq. ft., 3rd Fl. 7,140 sq. ft.. This lot is within the floodplain area. An elevation certificate is required to be submitted to and approved by Jim Wyllie, Public Works Dept., prior to calling for a framing inspection. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice5/14/20095/14/20097/24/2009 DONE
DetailsTony Young
BLD-Final5/14/20095/14/20095/14/2009PPASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
final ok
DOC - Permit Finaled5/14/20095/14/20095/14/2009PPASS
DetailsTony Young
Zoning Approval5/14/20095/14/20095/14/2009 DONE
DetailsSarah Schafer
Complies with all drawings.
PubWorks Occupancy Approval5/14/20095/14/20095/14/2009 DONE
DetailsDarla L Downs
per Dan Erskin was approved by Mark Strasser on March 28 2007.
BLD-Final5/13/20095/13/20095/13/2009PNR
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Jessica Noland pending zoning
BLD-Conference2/16/20092/17/20092/17/2009APART
DetailsTony Young
hand rail consult Phone #: ###-#### Internet Inspection Request from: Jessica Noland
fire riser access hand rails can turn at bottom to stay out of public way
BLD-Final1/28/20091/29/20091/29/2009PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
temp ok,, need to finish out side access,, ok for temp occ on 3rd floor
FIRE-Final Inspection1/28/20091/29/20091/29/2009APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection1/27/20091/28/20091/28/2009PCANC
DetailsTroy Cobbley
fire life safety Phone #: ###-#### Internet Inspection Request from: Jessica Noland Inspection cancelled from web by: Jessica Noland
BLD-Final1/27/20091/28/20091/28/2009PCANC
DetailsTony Young
LATE PM PLEASE Phone #: ###-#### Internet Inspection Request from: Jessica Noland Inspection cancelled from web by: Jessica Noland
FIRE-Final Inspection1/26/20091/27/20091/27/2009PCANC
DetailsTroy Cobbley
The life safety can be finaled when the project related fire sprinkler permit is finaled.
FIRE-Final Inspection1/23/20091/26/20091/26/2009PCANC
DetailsTroy Cobbley
Need the project related fire alarm and fire sprinkler permits finaled first. I also ran out of time for the inspection today.
BLD-Conference1/22/20091/23/20091/23/2009PPASS
DetailsTony Young
above ceiling inspection 1st and 2nd floor Phone #: ###-#### Internet Inspection Request from: Jessica Noland
Elevation Cert Rec'd-Final  1/14/2009 DONE
Received post construction Elevation Certificate. Elevation Certificate documents compliance with City's Floodplain Ordinance. Okay to schedule a framing inspection. Jim Wyllie (###-####).
Elevation Cert Rec'd-Final  1/14/2009 DONE
Received post construction Elevation Certificate. Elevation Certiicate documents compliance with City's Floodplain Ordinance. Okay to schedule framing inspection. Jim Wyllie (###-####)
Elevation Cert Rec'd-Final  1/14/2009 DONE
Received post construction Elevation Certificate. Certificate documents compliance with City's Floodplain Ordinance. Okay to schedule framing inspection. Jim Wyllie (###-####)
BLD-Framing/Rough-in12/29/200812/30/200812/30/2008ANR
DetailsTony Young
ceiling inspection to cover Phone #: ###-#### Internet Inspection Request from: Jessica Noland
they were wanting a grid inspection on bld08=00594 for T.I.
BLD-Framing/Rough-in12/26/200812/29/200812/29/2008PCANC
DetailsTony Young
ceiling inspection to cover. Phone #: ###-#### Internet Inspection Request from: Jessica Noland Inspection cancelled from web by: Jessica Noland
BLD-Framing/Rough-in12/24/200812/26/200812/26/2008APART
DetailsTony Young
above ceiling inspection for cover Phone #: ###-#### Internet Inspection Request from: Jessica Noland
need mech r/in,, ok to drop perimeter tiles
BLD-Framing/Rough-in12/17/200812/18/200812/18/2008APART
DetailsMike Jordan
shaft wall inspection Phone #: ###-#### Internet Inspection Request from: Jessica Noland. shaft wall, 2nd. floor. ok
BLD-Wall cover12/10/200812/11/200812/11/2008APART
DetailsTony Young
shaft wall Phone #: ###-#### Internet Inspection Request from: Jessica Noland
wip on 2nd and 3rd floor
BLD-Other12/10/200812/10/200812/10/2008PPART
DetailsTony Young
shaft wall Phone #: ###-#### Internet Inspection Request from: Jessica Noland
wip,, 2nd and 3rd floor
BLD-Conference12/9/200812/10/200812/10/2008APART
DetailsTony Young
shaft wall Phone #: ###-#### Internet Inspection Request from: Jessica Noland
wip on 3rd floor shaft
CHANGE STATUS TO (ISS)  11/20/2008  
per tony young change status back to issued--job not yet
BLD-Conference11/14/200811/17/200811/18/2008PPART
DetailsTony Young
Hour Separation Wall
Phone #: ###-#### ,, with 415
425 and 415 ,, will need fix from architect
DOC - Permit Finaled11/17/200811/17/200811/17/2008PCANC
DetailsTony Young
(This activity was added in error so we have changed the case status back to Issued.)
BLD-Conference11/14/200811/17/200811/17/2008PPART
DetailsDave Hannah
Hour Separation Wall
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
BLD-Conference11/14/200811/14/200811/14/2008PFAIL
DetailsTony Young
Hour Separation Wall
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
need to research and conf again,,
Plan Reviewer's activity  11/10/2008 DONE
DetailsSam Zahorka
Recieved a letter from Mr. Dave Mckinnon requesting no drinking fountain on the third floor and no accessible drinking fountain on the second floor. I requested the approved set of plans to review for what has been approved per the 2003 IBC. He is bringing the plans in Wednesday, Nov. 9th.
BLD-Framing/Rough-in11/6/200811/7/200811/7/2008PPASS
DetailsTony Young
inspection to cover Phone #: ###-#### Internet Inspection Request from: Jessica Noland
all walls ok to cover pending trades
FIRE-Conference10/31/200811/3/200811/3/2008ADONE
DetailsTroy Cobbley
Conference was for the placement of the electric alarm bell which I defered to the city approved sprinkler plans. I defered the knox box placement to Fire Station 9
BLD-Framing/Rough-in10/17/200810/17/200810/17/2008PPASS
DetailsTony Young
SHEETROCK SCREW INSPECTION NORTH AND WEST SIDES Phone #: ###-#### Internet Inspection Request from: Jessica Noland
BLD-Framing/Rough-in10/15/200810/16/200810/16/2008PFAIL
DetailsTony Young
drywall / screw inspection west side only Phone #: ###-#### Internet Inspection Request from: Jessica Noland
need screwed off per schedule on plans
BLD-Framing/Rough-in10/15/200810/16/200810/15/2008ACANC
DetailsTony Young
sheetrock/screw inspection west side only Phone #: ###-#### Internet Inspection Request from: Jessica Noland Inspection cancelled from web by: Jessica Noland
BLD-Framing/Rough-in10/10/200810/13/200810/13/2008APART
DetailsTony Young
soffit Phone #: ###-#### Internet Inspection Request from: Jessica Noland
south soffits ok to cover
BLD-Framing/Rough-in9/25/20089/26/20089/26/2008PPASS
DetailsTony Young
exterior framing inspection for cover
north, south and east walls Phone #: ###-#### Internet Inspection Request from: Jessica Noland
BLD-Wall cover9/22/20089/23/20089/23/2008APART
DetailsMike Jordan
partial inspection of steel stud framing for west and north walls Phone #: ###-#### Internet Inspection Request from: Jessica Noland.
ok to cover west wall exterior sise only. Additional screws added at headers.
BLD-Conference9/18/20089/22/20089/22/2008APART
DetailsTony Young
partial inspection of steel stud framing for west and north walls Phone #: ###-#### Internet Inspection Request from: Jessica Noland
most ok on exterior,, need more screws on some areas
BLD-Other9/3/20089/4/20089/4/2008APART
DetailsTony Young
roof pan deck inspection; special inspector from MTI will be on site. Phone #: ###-#### Internet Inspection Request from: Jessica Noland
ok pend special inspection report
BLD-Framing/Rough-in8/27/20089/2/20089/2/2008APART
DetailsDave Hannah
Roof Framing Phone #: ###-#### Internet Inspection Request from: Jessica Noland metal trusses on roof ok to cover
BLD-Concrete8/8/20088/11/20088/11/2008PCANC
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
BLD-Other8/8/20088/8/20088/11/2008PPART
DetailsTony Young
structural steel Phone #: ###-#### Internet Inspection Request from: Jessica Noland
pending S. I.
BLD-Concrete8/8/20088/11/20088/8/2008ACANC
DetailsTony Young
pouring 2nd & 3rd floors and stairs Monday a.m. Phone #: ###-#### Internet Inspection Request from: Jessica Noland Inspection cancelled from web by: Jessica Noland
BLD-Conference6/6/20086/9/20086/9/2008APART
DetailsTony Young
masonry rebar and grout pour 7am
special inspector on site Phone #: ###-#### Internet Inspection Request from: Jessica Noland
ok pend s. i. report
BLD-Conference6/3/20086/5/20086/5/2008APART
DetailsTony Young
masonry rebar and grout inspection
special inspector on site at 7 am Phone #: ###-#### Internet Inspection Request from: Jessica Noland
pend s. i. report
BLD-Conference6/3/20086/4/20086/4/2008APART
DetailsTony Young
masonry rebar and grout inspection
special inspector on site at 10 am Phone #: ###-#### Internet Inspection Request from: Jessica Noland
pend s i report
BLD-Concrete6/2/20086/3/20086/3/2008APART
DetailsTony Young
dan- special inspections will be onsite Phone #: ###-####
ok pend S. I. report
BLD-Conference5/15/20085/16/20085/16/2008PPART
DetailsTony Young
rebar placement and grout pour @ Noon 12pm Phone #: ###-#### Internet Inspection Request from: Jessica Noland
1st coarse,, S. I. on site
BLD-Footing4/28/20084/29/20084/29/2008PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
walls ok pending special inspection
BLD-Footing4/25/20084/29/20084/28/2008ACANC
DetailsTony Young
Rebar Inspection Phone #: ###-#### Internet Inspection Request from: Jessica Noland Inspection cancelled from web by: Jessica Noland
BLD-Footing4/16/20084/18/20084/18/2008PPART
DetailsTony Young
REBAR INSPECTION Phone #: ###-#### Internet Inspection Request from: Jessica Noland
wip,, will have special inspection
(F) Reprint permit  4/8/2008  
Issue PAID IN FULL permit  4/7/2008 DONE
Routing - PLAN CHECK4/3/2008 4/3/2008 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  4/3/2008 DONE
Inspection Record Card- Bld  4/3/2008 DONE
Telephone call  4/3/2008 DONE
left vm for curtis crystal at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  4/3/2008 DONE
Plan assigned to (JCM)12/10/2007 4/3/2008 PASS
DetailsJohn Menard
4/3/2008 11:08:23 JCM - activity updated through activity BLDA022 from case BLD07-03134.
Routing - FIRE3/28/2008 4/3/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan Reviewer's activity  3/28/2008 PASS
DetailsJohn Menard
Reviewed and approved nonstructural plan revisions. JCM
Routing - PLAN CHECK3/25/2008 3/28/2008 PASS
DetailsJohn Menard
Routed to Plan Check (John M.) 3/25/2008.
Routing - PLANNING3/24/2008 3/25/2008 PASS
DetailsMatthew A Halitsky
Routed to Plan Check 3/25/2008.
Routing - PLAN CHECK2/26/2008 3/24/2008  
DetailsJohn Menard
Plan resubmittals received  3/19/2008  
received letter of transmittal from modus archs & letter from modus with attached resubmittals/ plans including "2" sets each of AO.1, C3.O, C3.1, LS-1, LS-2, A1.O, A2.O, A2.1, A2.2, A2.3, A2.4, A4.O, A4.1, A5.O, A5.1, A6.O, A8.O, A8.1, SO.O1, S1.O2, S1.O3, S2.O1, S7.O1, MO.O, MO.1, M1.O, M1.1, M1.2, M1.3, M2.O, M2.1, M2.2, M2.3, M3.1, M4.1, M4.2, FP1.1, FP1.2, EO.O, E1.O, E1.1, E2.O, E2.1F, E2.1L, E2.1M, E2.1P, E2.1S, E3.O, E3.1---Also received fire plans for A2.O, A2.1, A2.2, M1.1, & FP1.1---Plans taken to John Menard
1st review completed  2/26/2008 FAIL
Failed Planning, Structura, Fire
Routing - FIRE2/22/2008 2/26/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Routing - PLAN CHECK2/11/2008 2/22/2008 FAIL
DetailsJohn Menard
Routed to Plan Check 2/11/2008.
Plan resubmittals requested  2/22/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Plan Reviewer's activity  2/22/2008 PASS
DetailsJohn Menard
Reviewed and approved structural revisions. JCM
Routing - PLANNING1/23/2008 2/7/2008 FAIL
DetailsMatthew A Halitsky
Conditions of DR approval not met in updated elevations.
Plan resubmittals received  1/28/2008  
Recieved 1 cover transmittal, 3 copies of stamped revised drawings, stamped supplemental calcs, and plan review response letter, 3 copies of the following sheets-S0.01, S1.01, S1.02, S1.03, S1.04, S2.02, S4.01, S4.02, S5.03, S6.02 inserted and taken back to Matt's desk in Planning///1-28-08 @12:10pm BAS
Routing - PLAN CHECK1/10/2008 1/14/2008  
DetailsJohn Menard
Routing - PUBLIC WORKS1/14/2008 1/14/2008 PASS
DetailsBeverly Hall
Routing PW Flood Plain1/10/2008 1/10/2008 PASS
DetailsJim Wyllie
Received Elevation Certificate based upon plans. Another Elevation Certificate based upon as-built conditions will be required prior to applicant receiving a framing inspection. Contact Jim Wyllie at ###-#### if there are questions.
Routing - PLANNING12/24/2007 1/9/2008 FAIL
DRH07-00455 Matt Halitsky; Cup05-00033 Susan Riggs (formerly Karen G.)

Conditions of DR approval not met.
Routing - PLUMBING12/18/2007 12/24/2007 PASS
2003 upc
Plan resubmittals requested  12/20/2007 DONE
DetailsJohn Menard
Faxed the architect a copy of the structural review requesting revisions.
Routing Off Site - STRUCTURAL12/10/2007 12/18/2007 FAIL
DetailsJohn Menard
Received comment list from the consulting structural engineer requesting revisions. JCM
Routing - Erosion and Sediment12/17/2007 12/18/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS12/14/2007 12/17/2007 FAIL
Failed flood plain
Routing PW Street Lights12/17/2007 12/17/2007 PASS
Routing PW Sewer Rating12/17/2007 12/17/2007 PASS
Routing PW Solid Waste12/17/2007 12/17/2007 PASS
Routing PW Drainage12/17/2007 12/17/2007 PASS
Drainage Plan approved under previous submittal (ODI 2436).
Routing PW Flood Plain12/17/2007 12/17/2007 FAIL
No Elevation Certificate provided. An Elevation Certificate demonstrating compliance with the Boise City Floodplain Ordinance must be provided and approved by Public Works prior to permit approval. Contact person is Jim Wyllie (###-####).
Routing - PLANNING Land Div12/10/2007 12/14/2007 PASS
Routing - Addressing12/14/2007 12/14/2007 PASS
Telephone call  12/10/2007 DONE
called Action Couriers for pick up
Application received  12/10/2007  
Pending Assignment by MYS12/10/2007 12/10/2007 DONE
DetailsJohn Menard
12/10/2007 15:07:47 JCM - activity updated through activity BLDA166 from case BLD07-03134.
Plans ACCEPTED BY PLAN TECH  12/10/2007 DONE
Recd Pcfee & Taken To Pln CK  12/10/2007 DONE
Plan routing begun/NEW & ADDTN  12/10/2007 DONE