(DALTILE - SCAFCO CORP BLDG) To construct a 21,000 square feet warehouse, showroom and office tenant in a new shell building per approved plans. Scope of work includes: a chain link fence on the rear of the building for product storage, [non-bearing interior partition walls creating a warehouse area, two accessible restrooms, a break room, two offices, utility room, a showroom, and a contractor service area], new electrical, new mechanical system, and interior finishes in compliance with Chapter 8 of the 2003 IBC. Warehouse space is approximately 17,073 square feet, showroom is approximately 1,520 square feet (considered accessory per 302.2), office area including restrooms is approximately 2,407 square feet. Any racking installed exceeding 8 ft. in height will require a separate racking permit. This building is fire sprinklered for area increase.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD9/22/20089/22/20083/12/2009 DONE
DetailsAlexandra L. DeYoung
Second Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 4/28/20088/11/2008 DONE
Case Summary (BLD)  6/18/2008 DONE
Code Occupancy Approval4/28/20084/28/20084/28/2008PPASS
DetailsScott M.Brown
ok for final
Permanent Occupancy  4/28/2008 DONE
BLD-Final4/24/20084/25/20084/25/2008APASS
DetailsMike Jordan
jim Phone #: ###-####. All issues resolved. Ok for perm occ.
BLD-Final4/23/20084/24/20084/24/2008AFAIL
DetailsMike Jordan
jim Phone #: ###-####. Additional exit sign required over door 102b to exit showroom. (two exits required from this space.) Install hc sign at mens restroom.
FIRE-Final Inspection4/23/20084/23/20084/23/2008PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection4/16/20084/18/20084/18/2008ACANC
DetailsTroy Cobbley
jim - fire life safety Phone #: ###-####
FIRE-Final Inspection4/17/20084/17/20084/17/2008PFAIL
DetailsTroy Cobbley
Provide approved door hardware as discussed.
BLD-Framing/Rough-in4/14/20084/14/20084/14/2008PPASS
DetailsMike Jordan
jim - ceiling grid Phone #: ###-####. grid ok.
BLD-Energy code compliance3/11/20083/11/20083/11/2008PPASS
DetailsMike Jordan
jim - insulation Phone #: ###-####
BLD-Energy code compliance3/10/20083/11/20083/11/2008ANR
DetailsMike Jordan
jim - insulation Phone #: ###-####
BLD-Framing/Rough-in3/7/20083/10/20083/10/2008PPASS
DetailsJim Storey
jim Phone #: ###-####
(F) Reprint permit  2/27/2008 DONE
mike w van auker construction called and wanted a copy of the permit with the new address on it -2-27-08ps
Plan assigned to (TLW)12/20/2007 2/25/2008 PASS
DetailsTim L. Woodard
2/25/2008 09:47:28 TLW - activity updated through activity BLDA022 from case BLD07-03162.
Routing - PLAN CHECK2/21/2008 2/25/2008 PEND
DetailsTim L. Woodard
Routed to planning
Routing - PLANNING2/25/2008 2/25/2008 PASS
DetailsAndrea Tuning
Approved Per DRH07-00219. ANT
Routing - PLAN CHECK2/25/2008 2/25/2008 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  2/25/2008 DONE
Print Occupancy Form  2/25/2008 DONE
Telephone call  2/25/2008 DONE
t/c w jeff hull at ###-#### - permit ready and fees given
Permit Ready to Issue  2/25/2008 DONE
Issue PAID IN FULL permit  2/25/2008 DONE
Routing - FIRE2/20/2008 2/21/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK2/1/2008 2/20/2008 PEND
DetailsTim L. Woodard
Routed to fire.
Plan resubmittals received  2/15/2008 DONE
received 1 letter of transmittal,1 comments,and 2 copies of sheets SP-1,L-1,A-1,A-2,A-9,E-3 taken to Tim W.
1st review completed  2/1/2008 FAIL
Failed Planning, Fire
Routing - FIRE1/30/2008 2/1/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Routing - PLAN CHECK12/21/2007 1/30/2008 PASS
DetailsTim L. Woodard
Per plan review report
Routing - PLANNING12/21/2007 12/21/2007 FAIL
DetailsAndrea Tuning
Failed due to the fact that the applicant has added a chain link fenced area adjacent to Executive Drive. If the applicant wishes to proceed with the chain link fence, the applicant will be required to submit a Design Review Modification application.

Furthermore, the applicant has not submitted revised plans to Desgin Review to up date the DR file (DRH07-00219).

A landscape plan was not included with the building permits either.

Andrea T. ###-####
Routing - PUBLIC WORKS12/20/2007 12/21/2007 PASS
Routing PW Sewer Rating12/20/2007 12/20/2007 PASS
Pending Assignment by MYS12/13/2007 12/20/2007 DONE
12/20/2007 10:43:00 MYS - activity updated through activity BLDA185 from case BLD07-03162.
Plans ACCEPTED BY PLAN TECH  12/13/2007  
Recd Pcfee & Taken To Pln CK  12/13/2007 DONE
Application received  12/12/2007