Permit Information
Permit NumberBLD07-03163
StatusFinaled
Name PETRA INC
Site Address 898 W GOWEN RD
Project NameNORCO FILL PLANT
Customer Number 
ePlanReviewNo
Description
Norco Fill Plant - To construct a new 52,500 square foot, one story, steel framed industrial building and related site improvements. This building contains an office area with restrooms, training/break room, conference room and lab. The building will also contatain a cylinder maintenance and repair area, flammable gas storage room and large cylinder fill and process area. This building will be fully fire sprinkled. This building is at 100 percent of allowable area. The 30 foot perimeter yards must be permanently maintained and no building addition will be allowed to this building nor may any additional H occupancy area be created within the building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 9/10/20099/15/2009 DONE
Permanent Occupancy  9/10/2009 DONE
PubWorks Occupancy Approval9/9/20099/9/20099/9/2009 DONE
DetailsTiffany Lowery
BLD-Final7/20/20097/20/20097/20/2009PPASS
DetailsJim Storey
Jim-ACHD is ok with us to final so do what you need to do I guess.......Barb bld final ok
BLD-Aging Inspection6/22/20096/22/20096/22/2009 PASS
DetailsJim Storey
passed on 4/13
Office Staff conference/action  4/16/2009 DONE
DetailsBarbara Stitt
All sub contractors and inspections finaled-just needs Public Works & ACHD///4-16-09 BAS
FIRE-Final Inspection4/13/20094/13/20094/13/2009PPASS
DetailsForrest France
Fire life safety inspection passed, correction notice items completed.
BLD-Final4/13/20094/13/20094/13/2009PPASS
DetailsJim Storey
BLD-Conference2/12/20092/20/20092/20/2009APASS
DetailsJim Storey
Applicant has requested a joint conference inspection with Electrical at 9:00 a.m. Contact Cornel Larson ###-####; Phone #: ###-####
BLD-Aging Inspection1/23/20091/23/20091/23/2009 NR
DetailsJim Storey
equment instal is still underway and should be certified first part of feb. 09 requist for final will be called in upon completion.
Code Occupancy Approval  10/13/2008 PASS
DetailsAndrea Tuning
BLD-Final10/10/200810/10/200810/10/2008APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/10/2008 at 7:13:28 AM. Contact: ###-####. temp ok pending others ok for equment set up and production.
BLD-Other10/7/200810/7/200810/7/2008APASS
DetailsJim Storey
fire stopping complet in restaroon and at drinking foutian
FIRE-Final Inspection10/6/200810/6/200810/6/2008APART
DetailsForrest France
Items needed prior to permit fire life safety final include repair one EM exit discharge light at the main entry, spin the SW hydrant 180 deg. to face the building, provide one fire extinguisher at the cylinder pick/sort area #132 when racking is installed, the spray booth fire sprinkler permit work needs to be completed inspected and approved, noted work at the fuel island is not finished at this time. Recieved signed letter from Musgrove Engineering regarding gas control system functionality per design requirements. Okay to begin equipment installation per agreements on file.
FIRE-Alarm Testing10/6/200810/6/200810/6/2008ADONE
DetailsForrest France
Duplicate inspection request.
BLD-Final10/6/200810/6/200810/6/2008AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/6/2008 at 7:19:10 AM. Contact: ###-####. fire stopping
FIRE-Final Inspection9/30/200810/1/200810/1/2008ANR
DetailsForrest France
Need project related fire alarm and sprinkler permit finals prior to building life safety approvals.
FIRE-Conference9/11/20089/12/20089/12/2008ADONE
DetailsForrest France
Regarding project inspection schedule including related fire alarm and sprinkler permit work.
BLD-Conference9/11/20089/12/20089/12/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/11/2008 at 3:33:34 PM. Contact: ###-####.
BLD-Other9/3/20089/3/20089/3/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/3/2008 at 7:29:58 AM. Contact: ###-####. fire wall ok ceilling ok to drop ceilling office area. one area at mixing rm. extened to roof deck.
BLD-Other8/29/20089/2/20089/2/2008ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/29/2008 at 1:42:04 PM. Contact: ###-####.
BLD-Other8/28/20088/28/20088/28/2008PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/28/2008 at 11:19:18 AM. Contact: ###-####.
BLD-Conference8/8/20088/19/20088/19/2008APASS
DetailsJim Storey
9:00 a.m. on site conference meeting with all trades.
Telephone call  8/8/2008 DONE
DetailsJason Blais
Discussed requested on site inspector conference meeting with architect. Meeting is scheduled for 9:00 a.m. on August 19, 2008.
BLD-Framing/Rough-in8/5/20088/6/20088/6/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/5/2008 at 2:51:30 PM. Contact: ###-####.interior partions ok for cover.
BLD-Framing/Rough-in7/31/20088/1/20088/1/2008APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/31/2008 at 1:52:57 PM. Contact: ###-####. perpendiculat membrane penatration fire stopping ok for cover.
BLD-Framing/Rough-in7/30/20087/30/20087/30/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/30/2008 at 9:50:55 AM. Contact: ###-####. south side of bld ok at 1 hr fb/
BLD-Conference7/8/20087/8/20087/8/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/8/2008 at 10:03:07 AM. Contact: ###-####. reviewed si reports roof deck almost complet fire spray preparation in progress.
Meeting  7/2/2008 DONE
DetailsJason Blais
Met separately with John Menard and Sam Rogers to discuss the racking. No shelves exceed 8' in height noted in the provided explanation letter. Separate racking permit not required. Sent response to Cornel Larson.
BLD-Framing/Rough-in6/16/20086/17/20086/17/2008APART
DetailsJim Storey
si on site ok steel erection in progress. revied w/arch as to how rated assemblys termanate at gurits.
BLD-Concrete6/16/20086/16/20086/16/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/16/2008 at 7:50:35 AM. Contact: ###-####.
Plan resubmittals received  6/16/2008 DONE
Received1 plan review comments,1 watson coatings, 3 material safty data sheets, 2 spray booth and related equipment books, 4 copies of sheets 95002 , and 6 copies of sheets 824504 sent to Sma Rogers in fire This permit has been issued 3-4-08 ///dld
BLD-Footing4/7/20084/7/20084/7/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/7/2008 at 11:27:40 AM. Contact: ###-####. center pan footting rebar ok/ si on site for concrete testing.
Print Occupancy Form  3/5/2008 DONE
DetailsCathy Brown
(F) Reprint permit  3/5/2008  
Print Occupancy Form  3/4/2008 DONE
DetailsCathy Brown
Print Occupancy Form  3/4/2008 DONE
DetailsCathy Brown
Telephone call  3/4/2008 DONE
DetailsTisha Gallop
spoke to Petra and told contractor permit is ready and fee
Permit Ready to Issue  3/4/2008 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  3/4/2008 DONE
DetailsMarsha Smylie
Plan Reviewer's activity  3/3/2008 PASS
DetailsJohn Menard
Reviewed and approved final resubmitted revised plans. JCM
PLANS/APPL TAKEN TO FRONT DESK  3/3/2008 DONE
DetailsJohn Menard
Plan assigned to (JCM)12/14/2007 3/3/2008 PASS
DetailsJohn Menard
3/3/2008 16:08:53 JCM - activity updated through activity BLDA022 from case BLD07-03163.
Routing - PLAN CHECK2/14/2008 3/3/2008 PASS
DetailsJohn Menard
Plan resubmittals received  2/28/2008 DONE
DetailsMarsha Smylie
received response letter from larson arch (3 pages) 1page of structural calcs, (3) ul assemblys, proposal on ul assembly, e-mail memo from john menard, & achd impact fee requirements. also "2" sets of C-1.O, C-2.O1, C-2.O2, S-O, S-1, S-2, S-3, E2.O, E2.1LW-----Also O.O1, SP-1, SP-2 SP-3, A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, A-10, A-11, A-12, A-13, A-14, A=15, A-16, & A-17--took plans back to John Menard
1st review completed  2/14/2008 FAIL
DetailsScott Arellano
Failed P.W., Plumbing, Plan Review, Structural
Routing - FIRE2/7/2008 2/14/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK2/5/2008 2/7/2008 FAIL
DetailsJohn Menard
Plan resubmittals requested  2/7/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Plan Reviewer's activity  2/7/2008 PASS
DetailsJohn Menard
Reviewed and approved structural revisions. JCM
Routing - PLUMBING2/1/2008 2/5/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing PW Sewer Design1/31/2008 2/1/2008 PASS
Details
Routing - PUBLIC WORKS1/31/2008 2/1/2008 PASS
DetailsBeverly Hall
Routing PW Drainage1/31/2008 1/31/2008 PASS
DetailsBrian Murphy
Routing - PLAN CHECK1/16/2008 1/31/2008  
DetailsJohn Menard
John Menard
Plan resubmittals received  1/30/2008 DONE
DetailsTisha Gallop
Received response letter, two copies of drainage report and O & M manual, three copies of sheets SP-1, SP-3, P2.2, and five copies of sheets C-1.0, C-2.01, C-2.02; inserted by architect and taken to John Menard
Routing - PLANNING1/7/2008 1/16/2008 PASS
DetailsMatthew A Halitsky
DRH07-00403, DRH07-00580 Matt Halitsky

Routed to plan check.
Plan resubmittals received  1/11/2008 DONE
DetailsTisha Gallop
Received three copies of pages S-0, S-1, S-2, S-3; inserted by arch. and took plans back to Matt H.
Routing - PLUMBING1/2/2008 1/7/2008 FAIL
DetailsBill VanDegrift
note on page P2.2- septic tank/pump chamber should read gasketed lids. pass public works review prior to plumbing review approval.
Routing Off Site - STRUCTURAL12/14/2007 1/2/2008 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing - Erosion and Sediment12/31/2007 1/2/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions.
Plan resubmittals requested  1/2/2008 DONE
DetailsJohn Menard
Faxed the architect a copy of the structural plan review requesting revisions. JCM
Routing PW Drainage12/27/2007 12/31/2007 FAIL
DetailsBrian Murphy
FUEL ISLAND BRIAN MURPHY ###-####
Routing - PUBLIC WORKS12/14/2007 12/31/2007 FAIL
DetailsConnie Baumgartner
Routing PW Sewer Rating12/27/2007 12/27/2007 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste12/27/2007 12/27/2007 PASS
DetailsPeter J. McCullough
Routing PW Environmental12/27/2007 12/27/2007 PASS
DetailsWalt Baumgartner
small water curtain paint booth. Spent water bath to discharge to sewer, no pretreatment required.
Routing PW Street Lights12/21/2007 12/26/2007 PASS
DetailsBill Colson
Routing PW Sewer Design12/17/2007 12/21/2007 FAIL
DetailsJim Pardy
Need to show grey water system on civil sheets, show tie in point, call out tap permit, provide easement.

Contacted Dave Marks on 12-21-07.
Pending Assignment by MYS12/13/2007 12/14/2007 DONE
12/14/2007 08:02:23 JCM - activity updated through activity BLDA166 from case BLD07-03163.
Routing - PLANNING Land Div12/14/2007 12/14/2007 PASS
DetailsDave Abo
Approved by combining parcels with deed recoreded on November 15, 2007. Notice of Buildable Parcel signed by Hal Simmons on 11/08/07 and recorded on 11/08/07.
Telephone call  12/14/2007 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Plans ACCEPTED BY PLAN TECH  12/14/2007 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  12/14/2007 DONE
DetailsTisha Gallop
Plan routing begun/NEW & ADDTN  12/14/2007 DONE
DetailsTisha Gallop
Application received  12/13/2007 DONE
DetailsTisha Gallop
BLD-Conference2/12/20092/20/2009 A 
DetailsGeorge Slane
Conference with Building and Electrical requested. Contact Cornel Larson ###-####.; Phone #: ###-####