First Notice | | 9/10/2009 | 9/15/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/10/2009 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 9/9/2009 | 9/9/2009 | 9/9/2009 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 7/20/2009 | 7/20/2009 | 7/20/2009 | P | PASS |
Jim Storey
|
|
|
Jim-ACHD is ok with us to final so do what you need to do I guess.......Barb bld final ok
|
BLD-Aging Inspection | 6/22/2009 | 6/22/2009 | 6/22/2009 | | PASS |
Jim Storey
|
|
|
passed on 4/13
|
Office Staff conference/action | | | 4/16/2009 | | DONE |
Barbara Stitt
|
|
|
All sub contractors and inspections finaled-just needs Public Works & ACHD///4-16-09 BAS
|
FIRE-Final Inspection | 4/13/2009 | 4/13/2009 | 4/13/2009 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed, correction notice items completed.
|
BLD-Final | 4/13/2009 | 4/13/2009 | 4/13/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 2/12/2009 | 2/20/2009 | 2/20/2009 | A | PASS |
Jim Storey
|
|
|
Applicant has requested a joint conference inspection with Electrical at 9:00 a.m. Contact Cornel Larson ###-####; Phone #: ###-####
|
BLD-Aging Inspection | 1/23/2009 | 1/23/2009 | 1/23/2009 | | NR |
Jim Storey
|
|
|
equment instal is still underway and should be certified first part of feb. 09 requist for final will be called in upon completion.
|
Code Occupancy Approval | | | 10/13/2008 | | PASS |
Andrea Tuning
|
|
|
|
BLD-Final | 10/10/2008 | 10/10/2008 | 10/10/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/10/2008 at 7:13:28 AM. Contact: ###-####. temp ok pending others ok for equment set up and production.
|
BLD-Other | 10/7/2008 | 10/7/2008 | 10/7/2008 | A | PASS |
Jim Storey
|
|
|
fire stopping complet in restaroon and at drinking foutian
|
FIRE-Final Inspection | 10/6/2008 | 10/6/2008 | 10/6/2008 | A | PART |
Forrest France
|
|
|
Items needed prior to permit fire life safety final include repair one EM exit discharge light at the main entry, spin the SW hydrant 180 deg. to face the building, provide one fire extinguisher at the cylinder pick/sort area #132 when racking is installed, the spray booth fire sprinkler permit work needs to be completed inspected and approved, noted work at the fuel island is not finished at this time. Recieved signed letter from Musgrove Engineering regarding gas control system functionality per design requirements. Okay to begin equipment installation per agreements on file.
|
FIRE-Alarm Testing | 10/6/2008 | 10/6/2008 | 10/6/2008 | A | DONE |
Forrest France
|
|
|
Duplicate inspection request.
|
BLD-Final | 10/6/2008 | 10/6/2008 | 10/6/2008 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/6/2008 at 7:19:10 AM. Contact: ###-####. fire stopping
|
FIRE-Final Inspection | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | NR |
Forrest France
|
|
|
Need project related fire alarm and sprinkler permit finals prior to building life safety approvals.
|
FIRE-Conference | 9/11/2008 | 9/12/2008 | 9/12/2008 | A | DONE |
Forrest France
|
|
|
Regarding project inspection schedule including related fire alarm and sprinkler permit work.
|
BLD-Conference | 9/11/2008 | 9/12/2008 | 9/12/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/11/2008 at 3:33:34 PM. Contact: ###-####.
|
BLD-Other | 9/3/2008 | 9/3/2008 | 9/3/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/3/2008 at 7:29:58 AM. Contact: ###-####. fire wall ok ceilling ok to drop ceilling office area. one area at mixing rm. extened to roof deck.
|
BLD-Other | 8/29/2008 | 9/2/2008 | 9/2/2008 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/29/2008 at 1:42:04 PM. Contact: ###-####.
|
BLD-Other | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/28/2008 at 11:19:18 AM. Contact: ###-####.
|
BLD-Conference | 8/8/2008 | 8/19/2008 | 8/19/2008 | A | PASS |
Jim Storey
|
|
|
9:00 a.m. on site conference meeting with all trades.
|
Telephone call | | | 8/8/2008 | | DONE |
Jason Blais
|
|
|
Discussed requested on site inspector conference meeting with architect. Meeting is scheduled for 9:00 a.m. on August 19, 2008.
|
BLD-Framing/Rough-in | 8/5/2008 | 8/6/2008 | 8/6/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/5/2008 at 2:51:30 PM. Contact: ###-####.interior partions ok for cover.
|
BLD-Framing/Rough-in | 7/31/2008 | 8/1/2008 | 8/1/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/31/2008 at 1:52:57 PM. Contact: ###-####. perpendiculat membrane penatration fire stopping ok for cover.
|
BLD-Framing/Rough-in | 7/30/2008 | 7/30/2008 | 7/30/2008 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/30/2008 at 9:50:55 AM. Contact: ###-####. south side of bld ok at 1 hr fb/
|
BLD-Conference | 7/8/2008 | 7/8/2008 | 7/8/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/8/2008 at 10:03:07 AM. Contact: ###-####. reviewed si reports roof deck almost complet fire spray preparation in progress.
|
Meeting | | | 7/2/2008 | | DONE |
Jason Blais
|
|
|
Met separately with John Menard and Sam Rogers to discuss the racking. No shelves exceed 8' in height noted in the provided explanation letter. Separate racking permit not required. Sent response to Cornel Larson.
|
BLD-Framing/Rough-in | 6/16/2008 | 6/17/2008 | 6/17/2008 | A | PART |
Jim Storey
|
|
|
si on site ok steel erection in progress. revied w/arch as to how rated assemblys termanate at gurits.
|
BLD-Concrete | 6/16/2008 | 6/16/2008 | 6/16/2008 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/16/2008 at 7:50:35 AM. Contact: ###-####.
|
Plan resubmittals received | | | 6/16/2008 | | DONE |
|
|
|
Received1 plan review comments,1 watson coatings, 3 material safty data sheets, 2 spray booth and related equipment books, 4 copies of sheets 95002 , and 6 copies of sheets 824504 sent to Sma Rogers in fire This permit has been issued 3-4-08 ///dld
|
BLD-Footing | 4/7/2008 | 4/7/2008 | 4/7/2008 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/7/2008 at 11:27:40 AM. Contact: ###-####. center pan footting rebar ok/ si on site for concrete testing.
|
Print Occupancy Form | | | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
|
(F) Reprint permit | | | 3/5/2008 | | |
|
|
|
|
Print Occupancy Form | | | 3/4/2008 | | DONE |
Cathy Brown
|
|
|
|
Print Occupancy Form | | | 3/4/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 3/4/2008 | | DONE |
Tisha Gallop
|
|
|
spoke to Petra and told contractor permit is ready and fee
|
Permit Ready to Issue | | | 3/4/2008 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 3/4/2008 | | DONE |
Marsha Smylie
|
|
|
|
Plan Reviewer's activity | | | 3/3/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved final resubmitted revised plans. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/3/2008 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 12/14/2007 | | 3/3/2008 | | PASS |
John Menard
|
|
|
3/3/2008 16:08:53 JCM - activity updated through activity BLDA022 from case BLD07-03163.
|
Routing - PLAN CHECK | 2/14/2008 | | 3/3/2008 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 2/28/2008 | | DONE |
Marsha Smylie
|
|
|
received response letter from larson arch (3 pages) 1page of structural calcs, (3) ul assemblys, proposal on ul assembly, e-mail memo from john menard, & achd impact fee requirements. also "2" sets of C-1.O, C-2.O1, C-2.O2, S-O, S-1, S-2, S-3, E2.O, E2.1LW-----Also O.O1, SP-1, SP-2 SP-3, A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, A-10, A-11, A-12, A-13, A-14, A=15, A-16, & A-17--took plans back to John Menard
|
1st review completed | | | 2/14/2008 | | FAIL |
Scott Arellano
|
|
|
Failed P.W., Plumbing, Plan Review, Structural
|
Routing - FIRE | 2/7/2008 | | 2/14/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 2/5/2008 | | 2/7/2008 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals requested | | | 2/7/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Plan Reviewer's activity | | | 2/7/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved structural revisions. JCM
|
Routing - PLUMBING | 2/1/2008 | | 2/5/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing PW Sewer Design | 1/31/2008 | | 2/1/2008 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/31/2008 | | 2/1/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 1/31/2008 | | 1/31/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 1/16/2008 | | 1/31/2008 | | |
John Menard
|
|
|
John Menard
|
Plan resubmittals received | | | 1/30/2008 | | DONE |
Tisha Gallop
|
|
|
Received response letter, two copies of drainage report and O & M manual, three copies of sheets SP-1, SP-3, P2.2, and five copies of sheets C-1.0, C-2.01, C-2.02; inserted by architect and taken to John Menard
|
Routing - PLANNING | 1/7/2008 | | 1/16/2008 | | PASS |
Matthew A Halitsky
|
|
|
DRH07-00403, DRH07-00580 Matt Halitsky
Routed to plan check.
|
Plan resubmittals received | | | 1/11/2008 | | DONE |
Tisha Gallop
|
|
|
Received three copies of pages S-0, S-1, S-2, S-3; inserted by arch. and took plans back to Matt H.
|
Routing - PLUMBING | 1/2/2008 | | 1/7/2008 | | FAIL |
Bill VanDegrift
|
|
|
note on page P2.2- septic tank/pump chamber should read gasketed lids. pass public works review prior to plumbing review approval.
|
Routing Off Site - STRUCTURAL | 12/14/2007 | | 1/2/2008 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - Erosion and Sediment | 12/31/2007 | | 1/2/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
Plan resubmittals requested | | | 1/2/2008 | | DONE |
John Menard
|
|
|
Faxed the architect a copy of the structural plan review requesting revisions. JCM
|
Routing PW Drainage | 12/27/2007 | | 12/31/2007 | | FAIL |
Brian Murphy
|
|
|
FUEL ISLAND BRIAN MURPHY ###-####
|
Routing - PUBLIC WORKS | 12/14/2007 | | 12/31/2007 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 12/27/2007 | | 12/27/2007 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 12/27/2007 | | 12/27/2007 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 12/27/2007 | | 12/27/2007 | | PASS |
Walt Baumgartner
|
|
|
small water curtain paint booth. Spent water bath to discharge to sewer, no pretreatment required.
|
Routing PW Street Lights | 12/21/2007 | | 12/26/2007 | | PASS |
Bill Colson
|
|
|
|
Routing PW Sewer Design | 12/17/2007 | | 12/21/2007 | | FAIL |
Jim Pardy
|
|
|
Need to show grey water system on civil sheets, show tie in point, call out tap permit, provide easement.
Contacted Dave Marks on 12-21-07.
|
Pending Assignment by MYS | 12/13/2007 | | 12/14/2007 | | DONE |
|
|
|
12/14/2007 08:02:23 JCM - activity updated through activity BLDA166 from case BLD07-03163.
|
Routing - PLANNING Land Div | 12/14/2007 | | 12/14/2007 | | PASS |
Dave Abo
|
|
|
Approved by combining parcels with deed recoreded on November 15, 2007. Notice of Buildable Parcel signed by Hal Simmons on 11/08/07 and recorded on 11/08/07.
|
Telephone call | | | 12/14/2007 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Plans ACCEPTED BY PLAN TECH | | | 12/14/2007 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/14/2007 | | DONE |
Tisha Gallop
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/14/2007 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 12/13/2007 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Conference | 2/12/2009 | 2/20/2009 | | A | |
George Slane
|
|
|
Conference with Building and Electrical requested. Contact Cornel Larson ###-####.; Phone #: ###-####
|