Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD07-03164
StatusFinaled
Name PERRY CONSTRUCTION INC
Site Address 2475 S APPLE ST
Project NameCarriage Crossing-Bldg #2
Customer Number 
ePlanReviewNo
Description
**(Carriage Crossing Shopping Center Bldg)** To construct an elevator shaft and machine per approved plans and engineering. Work to include, removal of portions of floor joists, alteration of roof trusses, construction of shaft walls, and construction of partitions for machine room, future installation of elevator to be permitted by the state of Idaho. This building is not fire sprinklerd. Rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection7/14/20087/15/20087/15/2008APASS
DetailsTroy Cobbley
Life safety passed. Per Al Caine, with the state of idaho elevator division, they do not require our sign off. This elevator and the associated monitoring system has been inspected and passed by the state elevator inspector and has not been inspected by the city of boise.
Letter of compliance  7/15/2008  
DOC - Permit Finaled  7/15/2008 DONE
DetailsJim Storey
All signatures recieved letter of compliance issued
CHANGE STATUS TO (ISS)  7/14/2008  
Should not be finaled
Case Summary (BLD)  2/21/2008  
Case Summary (BLD)  2/21/2008  
BLD-Framing/Rough-in1/30/20081/31/20081/31/2008APASS
DetailsMike Jordan
russell Phone #: ###-####. framing for elevator shaft only. Also reviewed additional truss engineering for roof truss modifications. ok.
BLD-Foundation1/10/20081/10/20081/10/2008PPASS
DetailsMike Jordan
russell Note: want to pour about 2:00 Phone #: ###-####
BLD-Footing1/7/20081/8/20081/8/2008APASS
DetailsJim Storey
Russell; Phone #: ###-####Note: hoping to pour by concrete my 9:00 am Internet Inspection Request from: Cathy Weisshaupt
CHANGE STATUS TO (ISS)  1/2/2008  
already pd
Issue PAID IN FULL permit  1/2/2008 DONE
Inspection Record Card- Bld  12/21/2007 DONE
Telephone call  12/21/2007 DONE
t/c w matt rhees at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
Permit Ready to Issue  12/21/2007 DONE
Plan assigned to (R_H)12/13/200712/13/200712/20/2007 PASS
12/20/2007 14:00:32 RMH - activity updated through activity BLDA022 from case BLD07-03164.
Routing - PLAN CHECK12/19/2007 12/20/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/20/2007 DONE
Routing - Erosion and Sediment12/20/2007 12/20/2007 PASS
Routing - FIRE12/18/2007 12/19/2007 PASS
DetailsScott Arellano
Attached IFC comments to plan
1st review completed  12/19/2007 PASS
Routing - PLAN CHECK12/12/2007 12/18/2007 PASS
Case Summary (BLD)  12/18/2007 DONE
Plans ACCEPTED BY PLAN TECH  12/13/2007  
Application received  12/12/2007  
Recd Pcfee & Taken To Pln CK  12/12/2007