Third Notice BLD | 6/6/2008 | 6/6/2008 | 8/4/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/23/2008 | 4/23/2008 | 6/6/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/4/2008 | 4/23/2008 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 4/4/2008 | | DONE |
|
|
|
|
BLD-Final | 3/21/2008 | 3/21/2008 | 3/21/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/21/2008 at 7:49:34 AM. Contact: ###-####. ok for perm occ
|
FIRE-Final Inspection | 3/21/2008 | 3/21/2008 | 3/21/2008 | P | PASS |
Forrest France
|
|
|
HVAC units are below 2000 cfm per contractor and mechanical sheet, remainder of items completed, fire life safety inspection passed.
|
FIRE-Final Inspection | 3/19/2008 | 3/20/2008 | 3/20/2008 | P | NR |
Forrest France
|
|
|
Missing doors and hardware at some locations, need verification that HVAC units are below 2000 cfm as duct detectors are not installed, remainder of life safety is satisfactory.
|
BLD-Other | 3/5/2008 | 3/6/2008 | 3/6/2008 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/5/2008 at 2:45:04 PM. Contact: ###-####. ok to cover ceiling
|
BLD-Energy code compliance | 2/11/2008 | 2/12/2008 | 2/12/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/11/2008 at 3:37:13 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/8/2008 | 2/8/2008 | 2/8/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/8/2008 at 8:17:14 AM. Contact: ###-####.
|
Plan assigned to (TLW) | 12/21/2007 | | 1/31/2008 | | PASS |
Tim L. Woodard
|
|
|
1/31/2008 09:47:14 TLW - activity updated through activity BLDA022 from case BLD07-03175.
|
Routing - PLAN CHECK | 1/31/2008 | | 1/31/2008 | | PASS |
Tim L. Woodard
|
|
|
Plans OK to issue
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/31/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/31/2008 | | DONE |
|
|
|
|
Telephone call | | | 1/31/2008 | | DONE |
|
|
|
left vm for brandi johns at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 1/31/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/31/2008 | | DONE |
|
|
|
|
Routing - PLANNING | 1/30/2008 | | 1/30/2008 | | PASS |
Matthew A Halitsky
|
|
|
CZC08-08.
|
Routing - PLUMBING | 1/25/2008 | | 1/28/2008 | | PASS |
Bill VanDegrift
|
|
|
cold water service is 1", fixture schedule shows rpbp as 2" rpbp only needs to be 1".
|
Routing - PLAN CHECK | 1/10/2008 | | 1/25/2008 | | PEND |
Tim L. Woodard
|
|
|
Plans Routed to Plumbing.
|
Plan resubmittals received | | | 1/22/2008 | | |
|
|
|
Received 1 cover transmittal, 2 copies of sheets P1.0, P1.1, P2.1 and taken to Tim Woodard///1-22-08 @ 3:40pm BAS
|
1st review completed | | | 1/10/2008 | | FAIL |
|
|
|
Failed Plumbing
|
Routing - FIRE | 1/8/2008 | | 1/10/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLANNING | 1/7/2008 | | 1/8/2008 | | FAIL |
Sarah Schafer
|
|
|
Sarah -- within this permit they are adding an exterior door. Wondering if that is ok.
I contacted Brandi Johns and left a message stating they would need to process a zoning certificate for the addition of the exterior door. As soon as the application is submitted and we have an approvable design, I will call for the plans back. Thanks.
|
Routing - PLAN CHECK | 12/24/2007 | | 1/7/2008 | | PASS |
Tim L. Woodard
|
|
|
Passed per approved plans and case summary.
|
Routing - PLUMBING | 12/21/2007 | | 12/24/2007 | | FAIL |
Bill VanDegrift
|
|
|
Provide Plumbing plan and re-submit
|
Pending Assignment by MYS | 12/17/2007 | | 12/21/2007 | | DONE |
|
|
|
12/21/2007 08:35:51 MYS - activity updated through activity BLDA185 from case BLD07-03175.
|
Routing - PUBLIC WORKS | 12/21/2007 | | 12/21/2007 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/17/2007 | | |
|
|
|
|
Application received | | | 12/13/2007 | | |
|
|
|
|