Third Notice BLD | 6/6/2008 | 6/6/2008 | 9/29/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/23/2008 | 4/23/2008 | 6/6/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 4/11/2008 | 4/11/2008 | 4/23/2008 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 4/10/2008 | 4/11/2008 | 4/11/2008 | A | CANC |
Jim Sly
|
|
|
wally Phone #: ###-#### C/C issued
|
DOC - Permit Finaled | 4/11/2008 | 4/11/2008 | 4/11/2008 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 4/10/2008 | 4/10/2008 | 4/10/2008 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. The storage has been reduced to 20' and signage has been placed on the racks.
|
FIRE-Final Inspection | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | FAIL |
Troy Cobbley
|
|
|
The storage is limited to a maximum of 20'-0". The storage is currently at 21'-11 1/2". The storage needs to be reduced to 20'-0" or a resubmittal is required to go higher. Provide signage to limit the storage height to what ever is decided the maximum storage height will be.
|
BLD-Final | 4/7/2008 | 4/8/2008 | 4/8/2008 | A | NR |
Jim Sly
|
|
|
Wally please come around to back door Phone #: ###-#### Need fire final 1st.
|
BLD-Conference | 3/31/2008 | 4/1/2008 | 4/1/2008 | A | PEND |
Jim Sly
|
|
|
Call Blaine....see pre insp.... Called Blaine Pettingil .......Permit has been picked up, but leisure time has not called Id Material Handling to install........
|
BLD-Conference | 3/31/2008 | 3/31/2008 | 3/31/2008 | P | PEND |
Jim Sly
|
|
|
Blaine Pettingil ###-#### Called and left V/M
|
Issue PAID IN FULL permit | | | 1/30/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/29/2008 | | DONE |
|
|
|
|
Telephone call | | | 1/29/2008 | | DONE |
|
|
|
left vm for blaine pettingill at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 1/29/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/18/2008 | | 1/28/2008 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2008 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 12/26/2007 | | 1/28/2008 | | PASS |
Tim L. Woodard
|
|
|
1/28/2008 09:01:02 TLW - activity updated through activity BLDA022 from case BLD07-03197.
|
Routing - FIRE | 1/16/2008 | | 1/18/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 1/18/2008 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 1/16/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/26/2008 | | 1/16/2008 | | PASS |
Tim L. Woodard
|
|
|
Plans approved per engineering and approved plan. TLW
|
Pending Assignment by MYS | 12/17/2007 | | 12/26/2007 | | DONE |
|
|
|
12/26/2007 15:12:48 MYS - activity updated through activity BLDA185 from case BLD07-03197.
|
Recd Pcfee & Taken To Pln CK | | | 12/17/2007 | | DONE |
|
|
|
|
Application received | | | 12/17/2007 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/17/2007 | | |
|
|
|
|