Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD07-03219
StatusFinaled
Name HILL CONSTRUCTION CO
Site Address 3395 S FEDERAL WAY
Project NameWALGREENS
Customer Number 
ePlanReviewNo
Description
Walgreens - To construct a new 14,150 square foot, one story, wood framed retail drug store with pharmacy, one hour photo processing, storage area and restrooms. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD1/2/20091/2/20091/26/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
Second Notice BLD1/2/20091/2/20091/26/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 10/29/20081/2/2009 DONE
First Notice 10/29/20081/2/2009 DONE
BLD-Final10/29/200810/29/200810/29/2008PPASS
DetailsJim Storey
JR Phone #: ###-####
Permanent Occupancy UNPAID FEE  10/29/2008  
Permanent Occupancy UNPAID FEE  10/29/2008  
BLD-Final10/27/200810/27/200810/27/2008PPART
DetailsJim Storey
JR Phone #: ###-#### need letter to bo to address pharmcy exit hardware/ si close out doc.
FIRE-Final Inspection10/27/200810/27/200810/27/2008APASS
DetailsForrest France
C/N items verified for compliance, contractor to provide approved door hardware at the pharmacy area exit prior to structural final inspection.
PubWorks Occupancy Approval10/24/200810/24/200810/24/2008 DONE
DetailsTiffany Lowery
FIRE-Final Inspection10/22/200810/23/200810/23/2008AFAIL
DetailsTroy Cobbley
Provide approved hardware on the pharmacy door and the from entrance doors. Provide fire dept. signage as per note #6 and repair the supervisory alarm on the fire alarm system.
Zoning Approval10/22/200810/22/200810/23/2008 PASS
DetailsJosh Wilson
FIRE-Conference10/20/200810/20/200810/20/2008PDONE
DetailsForrest France
Site visit regarding fire sprinkler coverage at the outside attatched and covered storage area.
BLD-Framing/Rough-in9/17/20089/18/20089/18/2008PPART
DetailsDave Hannah
J.R- ceiling cover Phone #: ###-####needs to wire up mec fixtures ok to start laying in edge tiles
BLD-Framing/Rough-in8/5/20088/6/20088/6/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/5/2008 at 5:10:58 PM. Contact: ###-####. interior walls ok for cover.
BLD-Framing/Rough-in7/25/20087/28/20087/28/2008APASS
DetailsJim Storey
JR Phone #: ###-#### shell framing ok interior framing ok pending trade ri.
BLD-Aging Inspection7/16/20087/16/20087/17/2008 NR
DetailsJim Storey
BLD-Foundation4/30/20085/1/20085/5/2008PPASS
DetailsJim Storey
j.r. - stem wall Phone #: ###-####
BLD-Foundation4/30/20084/30/20084/30/2008PPART
DetailsJim Storey
j.r. - stem wall Phone #: ###-#### ok s\ e 1/2 of building
BLD-Footing4/21/20084/21/20084/21/2008PPART
DetailsTony Young
jr Note:pouring concrete 3:30 Phone #: ###-####
footings ok pending S.I. report
(F) Reprint permit  4/10/2008  
Issue PAID IN FULL permit  4/9/2008 DONE
Telephone call  2/25/2008 DONE
left vm for cindy huebert at ###-#### - permit ready and fees given - also need gc name, rce#, rp name and ACHD receipt
Permit Ready to Issue  2/25/2008 DONE
Routing - PLANNING2/21/2008 2/22/2008 PASS
DetailsJosh Wilson
Routing - PLAN CHECK2/22/2008 2/22/2008 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  2/22/2008 DONE
Print Occupancy Form  2/22/2008 DONE
Plan assigned to (JCM)12/21/2007 2/22/2008 PASS
DetailsJohn Menard
2/22/2008 14:38:03 JCM - activity updated through activity BLDA022 from case BLD07-03219.
Routing - PLAN CHECK1/29/2008 2/21/2008 PASS
DetailsJohn Menard
Plan Reviewer's activity  2/21/2008 PASS
Reviewed and approved structural and nonstructural resubmittals with attached comment list and redlined notes. JCM
Plan resubmittals received  2/15/2008  
Received 1 transmittal from BRS,1 structural review,1 plan review report,1 response,1 master-bilt refrigation,1 revision,2 scopes of work,1 response & description,1 supplemental calc,1 response from Tikker ENG,1 list of plan revisions,2 momos,1 description of changes,2 copies of sheet D1, 4 copies 8 1/2 x11 sheets WG-1,LZ-4,MX-3,MX-5 AND 2 copies of sheets A0.0,D-1,C1.1,C2.1,C2.2,C3.1,C4.1,C5.1,C5.2,C6.1,L1.0,L2.0,A0.1,A0.2,A0.3,A1.1,A1.2,A1.3,A1.4,A2.2,A2.3,A2.4,A3.1,A4.1,A4.2,A4.3,A4.4,A4.5,A5.1A5.2,S1.0,S2.0,S3.0,S4.0,S5.0,S6.0S7.0,S8.0,FP1.1,M1.1,M2.1,M2.2,P1.1,P2.1,E0.1,E0.1,E1.1,E1.2,E1.3,E1.4,E1.5,E1.6,E1.7,E2.1,E2.1A,E2.1B,E2.1C,E3.1,E4.1,E4.2,E4.3,E4.4,E4.5,E4.6 inserted by Cindy Huebert w/ BRS plans taken back to John M.
1st review completed  1/29/2008 FAIL
Failed structural and plan check.
Routing - FIRE1/28/2008 1/29/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans.
Routing - PLAN CHECK1/22/2008 1/28/2008 FAIL
DetailsJohn Menard
John Menard
Plan resubmittals requested  1/28/2008 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLANNING1/16/2008 1/22/2008 PASS
DetailsDiane C Perkins
Drh07-00409 Josh W.- PASS

Cup07-00133 Diane -pass
Plan resubmittals requested  1/17/2008 DONE
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing - PLUMBING1/11/2008 1/16/2008 PASS
DetailsBill VanDegrift
detail 1 page P2.1- indirect waste receptors are not allowed with in cabinets.
Routing Off Site - STRUCTURAL12/21/2007 1/14/2008 FAIL
DetailsJohn Menard
Routing - Erosion and Sediment1/11/2008 1/11/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS12/24/2007 1/11/2008 PASS
DetailsBeverly Hall
Routing PW Drainage12/28/2007 1/9/2008 PASS
DetailsBrian Murphy
Routing PW Sewer Rating1/9/2008 1/9/2008 PASS
DetailsConnie Baumgartner
Routing PW Environmental1/9/2008 1/9/2008 PASS
DetailsWalt Baumgartner
silver recovery required for silver bearing wastewater in accordance w/ required Silver BMPs.
Walt Baumgartner 384 3991
Routing PW Solid Waste12/28/2007 12/28/2007 PASS
Routing PW Sewer Design12/26/2007 12/27/2007 PASS
Routing PW Street Lights12/27/2007 12/27/2007 PASS
Routing - PLANNING Land Div12/21/2007 12/24/2007 PASS
DetailsTodd Tucker
Telephone call  12/21/2007 DONE
called Action Couriers for pick up
Plans ACCEPTED BY PLAN TECH  12/21/2007  
Recd Pcfee & Taken To Pln CK  12/21/2007  
Application received  12/19/2007