Third Notice | | 12/9/2009 | 12/4/2009 | | DONE |
|
|
|
|
Third Notice | | 11/14/2009 | 11/25/2009 | | DONE |
|
|
|
mailed
|
Second Notice | | 10/31/2009 | 11/4/2009 | | DONE |
|
|
|
sent by mail
|
First Notice | | 10/11/2009 | 10/21/2009 | | DONE |
|
|
|
|
BLD-Aging Inspection | 10/1/2009 | 10/1/2009 | 10/1/2009 | | PASS |
Tom Arcoraci
|
|
|
|
ACHD Occupancy Approval | 10/1/2009 | 10/1/2009 | 10/1/2009 | | DONE |
Barbara Stitt
|
|
|
See scanned documents
|
Permanent Occupancy | | | 10/1/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/1/2009 | | DONE |
|
|
|
|
BLD-Other | 6/26/2009 | 6/26/2009 | 6/26/2009 | P | PASS |
Tom Arcoraci
|
|
|
ok
|
BLD-Aging Inspection | 6/1/2009 | 6/1/2009 | 6/1/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 3/30/2009 | 3/30/2009 | 3/30/2009 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/27/2009 | 1/27/2009 | 1/27/2009 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/25/2008 | 11/25/2008 | 11/25/2008 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 9/10/2008 | 9/10/2008 | 9/10/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/10/2008 at 10:44:17 AM. Contact: ###-####.countertop lowered. ok for perm occ.
|
BLD-Final | 8/21/2008 | 8/21/2008 | 8/21/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/21/2008 at 10:23:08 AM. Contact: ###-####. ok for temp occ. Kitchen sink and counter tops need to be max 34 inch height for ada as noted on approved plans.
|
FIRE-Final Inspection | 8/20/2008 | 8/21/2008 | 8/21/2008 | A | PASS |
Troy Cobbley
|
|
|
LIfe safety passed.
|
PubWorks Occupancy Approval | 9/15/2008 | 9/15/2008 | 8/20/2008 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 8/19/2008 | | DONE |
|
|
|
OK per DRH07-00512
|
Telephone call | | | 8/18/2008 | | DONE |
Scott Arellano
|
|
|
Spoke with Justin regarding FD access roadway signage. After reviewing the FD access plan; the clubhouse parking lot driveway entrances can be signed as an alternative to signing the existing public roadways. This FD access lane designation will fulfill the signage/marking requirements for FD roadways for the new clubhouse. Per Justin, the location of the existing fire hydrant shown on plans, is inaccurate. The existing fire hydrant is south of the new clubhouse along the public roadway. This location will be acceptable. However final approval will be subject to satisfactory field inspection and verification by the PDS/fire inspector.
|
BLD-Wall cover | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/5/2008 at 10:03:14 AM. Contact: ###-####.
|
BLD-Energy code compliance | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/5/2008 at 10:03:14 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/30/2008 | 5/1/2008 | 5/1/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/30/2008 at 11:35:14 AM. Contact: ###-####. ok to insul. Missing lateral bracing on E2 trusses. framer was installing while on site. No plan reveiw notes on site.
|
BLD-Framing/Rough-in | 4/15/2008 | 4/15/2008 | 4/15/2008 | P | PART |
Tom Arcoraci
|
|
|
justin Phone #: ###-#### ok to side
|
BLD-Foundation | 3/20/2008 | 3/20/2008 | 3/20/2008 | P | PASS |
Tom Arcoraci
|
|
|
bart Phone #: ###-####
|
BLD-Footing | 3/19/2008 | 3/19/2008 | 3/19/2008 | P | PASS |
Tom Arcoraci
|
|
|
Bart Phone #: ###-####
|
(F) Reprint permit | | | 3/11/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/10/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/5/2008 | | 3/6/2008 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/6/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/6/2008 | | DONE |
|
|
|
left vm for dave glancey at ###-#### - permit ready and fees given - also need gc name, rce#, rp name and ACHD receipt
|
Permit Ready to Issue | | | 3/6/2008 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 1/2/2008 | | 3/6/2008 | | PASS |
Sam Zahorka
|
|
|
3/6/2008 07:27:00 SRZ - activity updated through activity BLDA022 from case BLD07-03240.
|
Routing - PLAN CHECK | 2/28/2008 | | 3/5/2008 | | PEND |
Sam Zahorka
|
|
|
Pending others to pass. Routed back to ESC.
|
Plan resubmittals received | | | 3/5/2008 | | |
|
|
|
received 2 letter of transmittals,2 vicinity maps,1 ESC narrative,and 2 copies of sheets ESC-1,ESC-2 taken to Sam Z
|
Routing - Erosion and Sediment | 3/5/2008 | | 3/5/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC08-01577
|
Routing - PUBLIC WORKS | 1/29/2008 | | 2/28/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 1/29/2008 | | 2/28/2008 | | PASS |
Brian McMahon
|
|
|
|
Routing - Erosion and Sediment | 2/28/2008 | | 2/28/2008 | | FAIL |
Steven Webb
|
|
|
ESC plan submitted is an 2005 plan which covers the development and is not specific for the vertical construction. Plan is needed which is specific to the project.
|
Plan resubmittals received | | | 1/30/2008 | | |
|
|
|
Received five copies of pages C1, C2, ESC-1, ESC-2; inserted by LEG and taken back to Brian Murphy
|
Routing - PLAN CHECK | 1/22/2008 | | 1/28/2008 | | PEND |
|
|
|
Pending Others to pass. (Sam Zahorka ###-####)
|
1st review completed | | | 1/22/2008 | | FAIL |
|
|
|
Failed ESC, PW and Drainage
|
Routing - FIRE | 1/17/2008 | | 1/22/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC review comments to plans.
|
Routing - PLAN CHECK | 1/10/2008 | | 1/17/2008 | | PEND |
Sam Zahorka
|
|
|
Pending Others to pass. (Sam Zahorka ###-####)
|
Plan resubmittals received | | | 1/17/2008 | | |
|
|
|
received one copy of esc narrative that was approved on 9/27/05; inserted into plans by LEG
|
Case Summary (BLD) | | | 1/17/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 1/14/2008 | | DONE |
|
|
|
|
Routing - PLANNING | 1/9/2008 | | 1/10/2008 | | PASS |
Josh Wilson
|
|
|
Josh W.
|
Routing - PLUMBING | 1/8/2008 | | 1/9/2008 | | PASS |
Gerry Varner
|
|
|
per plans and specs. and 2003 upc
|
Routing - Erosion and Sediment | 1/4/2008 | | 1/8/2008 | | FAIL |
|
|
|
Routing package did not contain a complete ESC plan set, (narrative was not included). Narrative must be included for the specific project.
|
Routing - PUBLIC WORKS | 1/2/2008 | | 1/4/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing PW Street Lights | | | 1/4/2008 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 1/4/2008 | | 1/4/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Solid Waste | | | 1/4/2008 | | PASS |
|
|
|
Trash must be taken to curb for collection.
|
Plan routing begun/NEW & ADDTN | | | 1/2/2008 | | |
|
|
|
|
CHANGE STATUS TO (REV) | | | 1/2/2008 | | DONE |
|
|
|
issue and print by mistake 1-2-08 ///DLD
|
Routing - PLANNING Land Div | 1/2/2008 | | 1/2/2008 | | PASS |
Dave Abo
|
|
|
Lot 1, Block 9 of Englefield Green Subdivision No. 2. Satisfaction Memo from Boise City Fire Department on August 30, 2007.
|
Plans ACCEPTED BY PLAN TECH | | | 1/2/2008 | | |
|
|
|
|
Application received | | | 12/21/2007 | | |
|
|
|
|
Routing PW Drainage | 1/3/2008 | | | | FAIL |
|
|
|
PLAN STAMPED NOT FOR CONSTRUCTION. BRIAN MURPHY
###-####
|