Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-03241
StatusFinaled
Name COOL HAND LUKE'S
Site Address 622 W IDAHO ST
Project NameADELMAN BLDG-2ND FLR
Customer Number 
ePlanReviewNo
Description
(COOL HAND LUKE'S - ADELMANN BLDG - SOUTHEAST CORNER OF 1ST STORY & ENTIRE 2ND STORY) The fire sprinkler system substitutes for 1-hr fire-resistance-rated construction of the building. To remodel the entire 5,800 square foot 2nd story and 1,543 square feet of the 1st story for a new restaurant / bar tenant. Work is to include interior nonbearing walls, millwork, booths, walk-in coolers, walk-in freezer, interior doors, two grease hoods and grease ducts, a dishwasher hood and duct, a horizontal sliding security grill, and finishes. The restrooms were approved under permit BLD00-02025 and shall be maintained accessible to the disabled. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/19/2008  
Second Notice BLD11/7/200811/7/200812/3/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 10/1/200811/7/2008 DONE
BLD-Final9/30/200810/1/200810/1/2008PPASS
DetailsDave Hannah
larry Phone #: ###-#### ok for perm occ
FIRE-Final Inspection9/30/200810/1/200810/1/2008APASS
DetailsForrest France
Fire life safety inspection completed acceptable, noted blocked exit path at the 2nd floor stairway north side to be cleared prior to structural final.
Code Occupancy Approval  10/1/2008 DONE
Approved per DRH08-00153 and DRH08-00257 approvals. 10-1-08
Permanent Occupancy UNPAID FEE  10/1/2008 DONE
DetailsTisha Gallop
BLD-Framing/Rough-in9/26/20089/26/20089/26/2008PPASS
DetailsJim Storey
Larry- ceiling grid Phone #: ###-#### ceilling in kitchen ok
FIRE-Conference8/11/20088/11/20088/11/2008ADONE
DetailsForrest France
Regarding kitchen hood system install.
BLD-Aging Inspection8/8/20088/8/20088/11/2008 PASS
DetailsDave Hannah
wip
Issue PAID IN FULL permit  4/11/2008 DONE
Telephone call  4/8/2008 DONE
left vm for david glancey at ###-#### - permit ready and fees given
Permit Ready to Issue  4/8/2008 DONE
Routing - PLAN CHECK4/4/2008 4/4/2008 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  4/4/2008 DONE
Print Occupancy Form  4/4/2008 DONE
Plan assigned to (CJW)12/28/2007 4/4/2008 PASS
DetailsCarl Westfall
4/4/2008 13:57:27 CJW - activity updated through activity BLDA022 from case BLD07-03241.
Routing - PLUMBING3/28/2008 4/4/2008 PASS
DetailsDaryl Spivey
Changes to plumbing. per plans, CDHD notes on K1.1 and 2003 upc.
Routing - PUBLIC WORKS3/28/2008 3/28/2008 PASS
DetailsConnie Baumgartner
Changes to plumbing fixtures.
Routing - FIRE3/24/2008 3/28/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK2/15/2008 3/24/2008 PASS
DetailsCarl Westfall
Completed the resubmittal review. Drawings approved.
Plan resubmittals received  3/18/2008 DONE
received 1 transmittal, 1 memo,1 To Lease Agreement and 2 copies of sheets A1.1,A3.1,A7.1,A8.1,A9.1,A9.2,A10.1,A10.2,D1.1,K1.1,K1.2,M1.0,M1.1,M2.0,M2.1,P1.0,P1.1,P1.2,P2.0,E0.0,E1.0,E2.1,E2.2,E2.3,E3.1,E4.0,E4.1 taken to Carl W.
Routing - PLANNING2/15/2008 2/15/2008 PASS
DetailsJulie Archambeault
The plans call for some exterior windows being "blocked" on the inside. However, this action is NOT PERMITTED at this time. NO WINDOWS ARE TO BE BLOCKED. The applicant must receive a Certificate of Appropriateness for this action. The architect has been contacted regarding this.
Routing - PLAN CHECK2/14/2008 2/15/2008  
Sent to Planning.
1st review completed  2/14/2008 FAIL
Failed Plan Check, Fire
Routing - FIRE2/12/2008 2/14/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Routing - PLAN CHECK1/3/2008 2/12/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on February 1, 2008 and was finished on February 12, 2008. Revised drawings were required. See the plan review report.
Routing - PLUMBING1/2/2008 1/3/2008 PASS
DetailsBill VanDegrift
per plans, ACHD notes on page K1.1, and 2003 upc.
Routing - PUBLIC WORKS12/28/2007 1/2/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating12/31/2007 1/2/2008 PASS
DetailsConnie Baumgartner
Routing PW Environmental12/31/2007 1/2/2008 PASS
DetailsWalt Baumgartner
existing grease interceptor located in sidewalk west side of building shared w/ CafeParis
Pending Assignment by MYS12/21/2007 12/28/2007 DONE
12/28/2007 16:30:26 MYS - activity updated through activity BLDA172 from case BLD07-03241.
Application received  12/21/2007  
Plans ACCEPTED BY PLAN TECH  12/21/2007  
Recd Pcfee & Taken To Pln CK  12/21/2007