Third Notice BLD | 9/22/2008 | 9/22/2008 | 10/22/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/21/2008 | 8/11/2008 | | DONE |
|
|
|
|
BLD-Final | 5/20/2008 | 5/21/2008 | 5/21/2008 | A | PASS |
Mike Jordan
|
|
|
steve Phone #: ###-####. ok for perm occ.
|
Permanent Occupancy | | | 5/21/2008 | | DONE |
Cathy Weisshaupt
|
|
|
|
FIRE-Final Inspection | 5/14/2008 | 5/15/2008 | 5/15/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 2/22/2008 | 2/25/2008 | 2/25/2008 | A | PART |
Mike Jordan
|
|
|
mark Phone #: ###-####. Temp occ. granted. Grid ceiling is repaired. Will be ok for perm occ once life/safety perms and racking requirements are take care of.
|
Temporary Occupancy UNPAID FEE | | | 2/25/2008 | | DONE |
|
|
|
|
BLD-Conference | 2/19/2008 | 2/19/2008 | 2/19/2008 | P | PASS |
Mike Jordan
|
|
|
mark or steve Phone #: ###-#### or ###-####. Interior partition walls only one sided, framing ok. Needs to remove screws from clips in grid ceiling.
|
BLD-Final | 2/15/2008 | 2/15/2008 | 2/15/2008 | P | NR |
Mike Jordan
|
|
|
Spoke with Mark of SBI contracting regarding bldg. final. Needs plumbing and elec, to final or temp as well. No framing inspections have been done on this job. Interior walls and ceiling grid have been built. Walls are covered. Noted to Mark with SBI contractors to call in for bldg. conferance on Tuesday AM. and will go over work to date and see what needs to be done. Also explained above situation to architect and noted to him that I would not give a TEmp. occ until other trades have temp or final and what additional work might be required since no framing insp. have taken place. Will contact the bldg. official (G. Slane) prior to proceeding on Tuesday morning.
|
BLD-Final | 2/14/2008 | 2/15/2008 | 2/15/2008 | A | CANC |
Mike Jordan
|
|
|
Steve, late p.m. please; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
FIRE-Final Inspection | 2/14/2008 | 2/15/2008 | 2/15/2008 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with sam rogers and dave hannimans permission until the racking permit has been taken care of. During the TOC period no product will be allowed to be stored on the racks.
|
FIRE-Final Inspection | 2/12/2008 | 2/13/2008 | 2/13/2008 | A | FAIL |
Troy Cobbley
|
|
|
Repair exit signs in the warehouse. Provide approved hardware on the office doors. Provide fire extinguisher in the warehouse per review note #3. Comply with note #32 of the plan review comments for storage. Currently the steel racks are 10'-0" in height with the top of storage at 16'-0". The existing sprinkler riser does not state what class of commodity or heighth of storage it was designed for. But is did state that the denisty was .295 gpm over 2,600 square feet. steve Phone #: ###-####
|
Print Occupancy Form | | | 2/12/2008 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/12/2008 | | |
|
|
|
|
Telephone call | | | 2/12/2008 | | |
|
|
|
contactor already called about the fees and talked to louise about the fees so high on sewer
|
Issue PAID IN FULL permit | | | 2/12/2008 | | DONE |
|
|
|
|
Routing - FIRE | 2/7/2008 | | 2/11/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan assigned to (SRZ) | 1/23/2008 | | 2/11/2008 | | PASS |
Sam Zahorka
|
|
|
2/11/2008 13:49:05 SRZ - activity updated through activity BLDA022 from case BLD07-03247.
|
1st review completed | | | 2/11/2008 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 2/11/2008 | | 2/11/2008 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/7/2008 | | DONE |
|
|
|
Steve with SBI called and inquired about the Permits status. (SRZ)
|
Case Summary (BLD) | | | 2/1/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/31/2008 | | |
|
|
|
received response letter and two copies of pages A0.0, A0.5, A1.1, A1.2, A1.3; taken to Sam Zahorka
|
Case Summary (BLD) | | | 1/25/2008 | | DONE |
|
|
|
|
1st review completed | | | 1/25/2008 | | FAIL |
|
|
|
Correction letter being sent to Applicant. Resubmittal drawings required. (Sam Zahorka ###-####)
|
Plan assigned to (R_H) | 12/28/2007 | | 1/23/2008 | | ---- |
Marlene Southard
|
|
|
REASSIGNED TO SAM Z. BY MSOUTHARD ON 1/23/08.
|
Routing - PUBLIC WORKS | 12/31/2007 | | 1/2/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 12/31/2007 | | 12/31/2007 | | PASS |
Louise Waldorf
|
|
|
|
Pending Assignment by MYS | 12/21/2007 | | 12/28/2007 | | DONE |
|
|
|
12/28/2007 15:32:34 MYS - activity updated through activity BLDA175 from case BLD07-03247.
|
Plans ACCEPTED BY PLAN TECH | | | 12/24/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/24/2007 | | DONE |
|
|
|
|
Application received | | | 12/21/2007 | | |
|
|
|
|
Routing - PLAN CHECK | 1/2/2008 | | | | PEND |
Sam Zahorka
|
|
|
Pending others to Pass. (SRZ)
|