Permit Information
Permit NumberBLD07-03284
StatusFinaled
Name LITZINGER CONSTRUCTION CO
Site Address 2115 N 16TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project consists of the construction of a 2082 Sf., two story (first story 960 Sf., second story 1122 Sf.) single family dwelling with a detached garage (252 Sf). These plans are approved per the attached plan review report and any redlining of the plans. The applicant shall comply with the current wall bracing policy adopted by Boise City. This lot is within a floodplain area An elevation certificate is required to be submitted to and approved by Jim Wylie, Public Works Department, prior to calling for a framing inspection. R-1CH, setbacks, and DRH07-00567 per Julie Archambeault. CDM



Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/10/20103/11/20103/11/2010APASS
DetailsTony Young
bruce - please call for access Phone #: ###-####,, cof o faxed
DOC - Permit Finaled3/11/20103/11/20103/11/2010PPASS
DetailsTony Young
BLD-Final3/9/20103/10/20103/10/2010ANR
DetailsTony Young
bruce - please call for access Phone #: ###-####,, need zoning 1st
Zoning Approval3/10/20103/10/20103/10/2010 DONE
DetailsMatthew A Halitsky
BLD-Final3/8/20103/9/20103/9/2010AFAIL
DetailsTony Young
bruce - please call for access Phone #: ###-####,, need zoning,, need to fix siding on north side
BLD-Energy code compliance1/13/20101/14/20101/14/2010APASS
DetailsDave Hannah
Bruce Phone #: ###-####
BLD-Framing/Rough-in1/11/20101/12/20101/12/2010PPASS
DetailsDave Hannah
Bruce Phone #: ###-####
BLD-Concrete11/20/200911/20/200911/20/2009PPASS
DetailsTony Young
kevin Phone #: ###-####
Override - Parcel Holds11/20/20091/1/190011/20/2009  
concrete
Elevation Cert Rec'd-Final  11/18/2009 DONE
Elevation Certificate (based upon building under construction) has been received. Elevation of finish floor as per Elevation Certificate conforms to Floodplain Ordinance requirements. OK to schedule a framing inspection. (Jim Wyllie / ###-####)
BLD-Foundation11/10/200911/12/200911/12/2009ADONE
DetailsTony Young
Kevin-around 3 if possible please Phone #: ###-####
poured over veterans day,, appears ok
BLD-Foundation11/10/200911/11/200911/12/2009PPART
DetailsTony Young
Kevin-around 3 if possible please Phone #: ###-####
poured over holiday
BLD-Footing11/9/200911/10/200911/10/2009PPART
DetailsTony Young
Kevin-around 3 if possible please Phone #: ###-####
wip
Override - Parcel Holds11/9/20091/1/190011/9/2009  
footing inspection
BLD-Conference11/2/200911/3/200911/3/2009PPASS
DetailsTony Young
Steve Phone #: ###-####
will start work next week,, ok to keep active
Override - Parcel Holds11/2/20091/1/190011/2/2009  
this is for a conferance
Extend Permit 180 days 4/20/20094/20/2009 DONE
DetailsJenifer Gilliland
Per e-mail from Jenifer Gilliland see attached to documents///4-20-09 BAS
Case Summary (BLD)  4/6/2009 DONE
DetailsTisha Gallop
DOC - Permit Expired3/31/20093/31/20093/31/2009PPASS
DetailsTony Young
no work has started
BLD-Conference3/30/20093/31/20093/31/2009AFAIL
DetailsTony Young
Tony, this permit is open "Iss" but has never had any inspections and was issued on 3-12-08...could you please look and see what''s going on? Thanks
no work has started
Override - Parcel Holds3/30/20091/1/19003/30/2009  
verify if any work is going on
Override - Parcel Holds  3/12/2008  
Issue PAID IN FULL permit  3/12/2008 DONE
Telephone call  2/1/2008 DONE
t/c w ken at ###-#### - permit ready and fees given
Override - Parcel Holds  2/1/2008  
Permit Ready to Issue  2/1/2008 DONE
Routing PW Flood Plain1/31/2008 1/31/2008 PASS
DetailsJim Wyllie
PLANS/APPL TAKEN TO FRONT DESK  1/31/2008 DONE
Inspection Record Card- Bld  1/31/2008 DONE
Plan resubmittals received  1/25/2008 DONE
Elevation Certificate taken to Jim Wylie for approval
Routing PW Flood Plain1/25/2008 1/25/2008 FAIL
DetailsJim Wyllie
Elevation Certificate submitted is not complete. Sheet A-3, Foundation Plan, is not correct. Detail "1" needs to show a minimum 12 inch clearance between finish floor elevation and finish grade at the foundation. As a minimum, all building mechanical and electrical equipment needs to be elevated to the finish floor elevation. Contact for questions is Jim Wyllie (###-####).
Plan resubmittals received  1/23/2008  
Received 1 copy of Elevation Certificate and taken to Carl Madsen's desk///1-23-08 @ 2:20pm BAS
Routed elevation certificate to Jim Wylie for aproval CDM
Plan assigned to (CDM)1/9/20081/9/20081/16/2008 DONE
DetailsCarl D Madsen
Need revised framing plan for second level.
Main beam failed on second floor
Called Builder on 1-9-08 and requested information
Carl Madsen
Routing - PLAN CHECK12/31/2007 1/16/2008 PASS
DetailsCarl D Madsen
Pending Ekevation Certificate
Elevation Certificate recieved and approved by Jim Wylie 1-31-08
Case Summary (BLD)  1/16/2008 DONE
Plan resubmittals received  1/15/2008 DONE
received 2 copies of sheet A-4 taken to Carl M.
Pending Assignment by SRZ12/28/2007 1/9/2008 DONE
DetailsCarl D Madsen
Routing - PUBLIC WORKS12/28/2007 12/31/2007 PASS
Application received  12/28/2007  
Routing - Addressing12/28/2007 12/28/2007 PASS
Routing - PLANNING12/28/2007 12/28/2007 PASS
Routed to Julie A-DRH07-00567-Approval for 2115 only; not 2117