BLD-Final | 2/6/2009 | 2/6/2009 | 2/6/2009 | P | PASS |
Jim Storey
|
|
|
ben Phone #: ###-#### NOte: please call for access
|
DOC - Permit Finaled | 2/6/2009 | 2/6/2009 | 2/6/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 11/14/2008 | 11/17/2008 | 11/17/2008 | A | PASS |
Jim Storey
|
|
|
Sam-as early as possible please Phone #: ###-####
|
BLD-Framing/Rough-in | 11/10/2008 | 11/12/2008 | 11/12/2008 | A | PASS |
Tom Arcoraci
|
|
|
sam Phone #: ###-####
|
Routing Walk-In (BLD) | 10/10/2008 | 10/10/2008 | 10/10/2008 | A | PASS |
Perry Paine
|
|
|
|
BLD-Footing | 9/26/2008 | 9/26/2008 | 9/26/2008 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-####
|
BLD-Footing | 9/25/2008 | 9/25/2008 | 9/25/2008 | P | PASS |
Jim Storey
|
|
|
jerry Phone #: ###-####
|
BLD-Foundation | 9/19/2008 | 9/19/2008 | 9/19/2008 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/19/2008 at 7:19:31 AM. Contact: ###-####.
|
BLD-Footing | 9/15/2008 | 9/15/2008 | 9/15/2008 | P | PASS |
Jim Storey
|
|
|
Jerry Phone #: ###-####
|
BLD-Foundation | 9/5/2008 | 9/5/2008 | 9/5/2008 | P | PASS |
Jim Storey
|
|
|
eon Note: wall Phone #: ###-####
|
BLD-Footing | 9/2/2008 | 9/3/2008 | 9/3/2008 | A | PART |
Jim Storey
|
|
|
eon Phone #: ###-#### ft for basement ok
|
Issue PAID IN FULL permit | | | 7/18/2008 | | DONE |
|
|
|
|
Telephone call | | | 7/9/2008 | | |
|
|
|
left mess that permit has expired & will void plans & charge a plan check fee
|
Telephone call | | | 7/9/2008 | | |
|
|
|
per Rita DeYoung ok for pinnacle const (sam fackeral) to pickup plans by Friday the 18th, 2008--if not picked up by then will have to be voided.
|
Ready Permit EXTENDED | | | 4/15/2008 | | |
|
|
|
extend permit to 7-3-08
|
Inspection Record Card- Bld | | | 2/22/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/22/2008 | | DONE |
|
|
|
left vm for sam fackrell at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 2/22/2008 | | DONE |
|
|
|
|
Pending Assignment by SRZ | 1/3/2008 | | 2/21/2008 | | DONE |
Ben S. Pavelka
|
|
|
|
Routing - PLAN CHECK | 2/21/2008 | | 2/21/2008 | | PASS |
Ben S. Pavelka
|
|
|
|
Case Summary (BLD) | | | 2/21/2008 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2008 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 1/21/2008 | | |
Ben S. Pavelka
|
|
|
|
Routing - PUBLIC WORKS | 1/8/2008 | | 1/8/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PLANNING | 1/4/2008 | | 1/8/2008 | | PASS |
Lucinda Grames
|
|
|
Attached garage built in rear setback. Called Sam Fackrell at ###-#### to let him know that revised drawings would be necessary.1-8-08 Setbacks remeasured by Mr. Fackrell. Plans were redlined showing correct measurements.
|
Routing - Addressing | 1/4/2008 | | 1/4/2008 | | PASS |
April Wing
|
|
|
|
Application received | | | 1/3/2008 | | |
|
|
|
reinforcing not required for foundation walls at crawl areas
|
Routing - PLAN CHECK | 1/8/2008 | | | | FAIL |
|
|
|
Contacted Jason with Tomlinson Design and Sam Fackrell to discuss items needed. E-mailed Sam list at sam@pinncs.com and faxed a copy to Jason at ###-####.
|
Routing - PLANNING Land Div | 1/3/2008 | | | | |
|
|
|
|