Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-00060
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO
Site Address 199 N CAPITOL BLVD Unit: 304
Project NameWASHINGTON MUTUAL BLDG
Customer Number 
ePlanReviewNo
Description
**(Vanilla Finish)**(Ste #304)** To prepare an existing empty 2103 sq ft tenant space for future tenant, NO OCCUPANCY ALLOWED UNDER THIS PERMIT, a separate permit will be required to occupy this space. Work to include, installation of new suspended ceiling system with installation of related lighting, this building is fully fire sprinklered ANY ALTERATIONS TO THE SPRINKLER SYSTEM & FIRE ALARM SYSTEM WILL require separate permits, and shall be installed and maintained per NFPA #13 as regulated by the fire department. RmH (The entrance door is being modified under Bld07-02576) (The demo permit was issued under BLD07-03238)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/6/20086/6/20087/11/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD4/23/20084/23/20086/6/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice3/3/20083/3/20084/23/2008 DONE
DetailsDave Hannah
BLD-Final3/3/20083/3/20083/3/2008PPASS
DetailsDave Hannah
kevin Phone #: ###-####
DOC - Permit Finaled3/3/20083/3/20083/3/2008PPASS
DetailsDave Hannah
FIRE-Final Inspection2/29/20082/29/20082/29/2008PPASS
DetailsForrest France
Noted corrections necessary for final have been completed, vanilla permit fire life safety passed.
BLD-Final2/25/20082/26/20082/26/2008APART
DetailsDave Hannah
kevin Phone #: ###-#### needs fire finals
FIRE-Final Inspection2/20/20082/20/20082/20/2008AFAIL
DetailsForrest France
Lacking proper fire alarm notification coverage due to remodel work.
BLD-Final2/19/20082/19/20082/20/2008PNR
DetailsDave Hannah
kevin Phone #: ###-#### neeeds fire sign offs
FIRE-Final Inspection2/19/20082/19/20082/19/2008PNR
DetailsForrest France
Need fire alarm permit final.
BLD-Final2/14/20082/19/20082/19/2008ACANC
DetailsDave Hannah
kevin Phone #: ###-####
FIRE-Final Inspection2/14/20082/15/20082/15/2008PNR
DetailsForrest France
Project is not in condition for final fire life safety acceptance, also need project related fire sprinkler and alarm permit finals prior.
BLD-Framing/Rough-in2/4/20082/4/20082/4/2008PPART
DetailsDave Hannah
kevin Phone #: ###-#### ok to cover ceiling after elem oks
Issue PAID IN FULL permit  1/16/2008 DONE
Inspection Record Card- Bld  1/14/2008 DONE
Telephone call  1/14/2008 DONE
left vm for margie kennedy at ###-#### - permit ready and fees given
Permit Ready to Issue  1/14/2008 DONE
Plan assigned to (R_H)1/9/20081/9/20081/11/2008 PASS
DetailsRon Hill
1/11/2008 15:08:16 RMH - activity updated through activity BLDA022 from case BLD08-00060.
Case Summary (BLD)  1/11/2008 DONE
Routing - PLAN CHECK1/11/2008 1/11/2008 PASS
DetailsRon Hill
Routing - FIRE1/11/2008 1/11/2008 PASS
DetailsRon Hill
Minor remodel / Field verify
1st review completed  1/11/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/11/2008 DONE
Plans ACCEPTED BY PLAN TECH  1/9/2008  
Recd Pcfee & Taken To Pln CK  1/9/2008  
Application received  1/9/2008  
Pending Assignment by MYS1/9/2008 1/9/2008 DONE
DetailsTisha Gallop
1/9/2008 15:21:35 LEG - activity updated through activity BLDA175 from case BLD08-00060.