Information based on query as of Thursday, August 15, 2024.
Permit Information
Permit NumberBLD08-00066
StatusVoid/No Violation
Name INTERMOUNTAIN PROPERTY DEVELOPMENT
Site Address 3839 N GARDEN CENTER WAY
Project NameGarden Center
Customer Number 
ePlanReviewNo
Description
Garden Center Bulk Retail Building - To construct a new 3,350 square foot, one story, steel framed retail building and related site improvements. This building will contain a large open retail area, covered entry and porch areas, two accessible restrooms and a mechanical room. All construction per the approved plans and attached comment list. NOTE: THIS BUILDING IS IN THE FLOODPLAIN AND IS SUBJECT TO ALL PUBLIC WORKS FLOODPLAIN REQUIREMENTS. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
VOIDED CHANGE STATUS  10/1/2008 DONE
DetailsAlexandra L. DeYoung
Per email from Dave McKinnon (Tertling Co./Owner) void permit, not doing project at this time, will resubmit at later date. Requesting refund of permit fees; see attached scanned letter///10-1-08 ALR (returned Office Copy plans to Dave Mckinnon)
BLD-Aging Inspection9/30/20089/30/20089/30/2008 PASS
DetailsTony Young
(F) Reprint permit  7/1/2008  
Override - Parcel Holds  6/30/2008  
Issue PAID IN FULL permit  6/30/2008 DONE
Telephone call  6/19/2008 DONE
left mess for eric peterson at ###-#### that permit is ready & will expire
Print Occupancy Form  6/18/2008 DONE
Details
CHANGE STATUS TO (RDY)  6/18/2008 DONE
Telephone call  6/18/2008 DONE
Called Curtis C. permit ready and fee given Also Need ACHD,GC,and RCE #
Routing - PLAN CHECK6/11/2008 6/17/2008 PASS
DetailsJohn Menard
John Menard
Plan resubmittals received  6/17/2008  
received letter of tranmittal from modus arch & "3" pages of structural review from lochsa eng. Also "2" sets each of SO.1, S1.O1, S3.O5, S4.O1, S5.O2--- plans taken back to John Menard----inserter is Braden Jesser
Plan Reviewer's activity  6/17/2008 PASS
Reviewed and approved structural revisions. JCM
PLANS/APPL TAKEN TO FRONT DESK  6/17/2008 DONE
Plan assigned to (JCM)1/10/2008 6/17/2008 PASS
DetailsJohn Menard
6/17/2008 15:26:48 JCM - activity updated through activity BLDA022 from case BLD08-00066.
Routing - PLANNING6/5/2008 6/11/2008 PASS
DetailsMatthew A Halitsky
Routed to Plan Check (John M.)
Routing - PLAN CHECK4/3/2008 6/5/2008  
DetailsJohn Menard
Plan resubmittals requested  6/5/2008 DONE
E-mailed the architect requesting additional submittals. JCM
Plan Reviewer's activity  6/5/2008 FAIL
Reviewed revised plans and requested addtional revisions. JCM
Plan resubmittals received  6/4/2008  
DetailsJohn Menard
Received transmittal, response letter and two copies of sheets A0.1, C3.0, C3.1, A1.0, A2.0, A2.1, A3.0, A3.1, A4.0, A4.1, A5.0, A6.1, A6.2, A7.0, A8.0, M0.0, M1.0, M1.1, M2.1, E0.0, E1.0, E2.1L, E2.1M, E2.1P, E3.0; inserted by arch. rep. and taken back to John Menard
Routing - PLAN CHECK3/6/2008 4/3/2008  
DetailsJohn Menard
Routing - PLANNING4/3/2008 4/3/2008  
DetailsJohn Menard
Routing - FIRE3/5/2007 3/6/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  3/6/2008 FAIL
Failed PW, ESC, Structural, Planning, Plan Check
Routing - PLAN CHECK1/31/2008 3/5/2008  
DetailsJohn Menard
Routing - PLAN CHECK3/3/2008 3/5/2008  
DetailsJohn Menard
Plan resubmittals requested  3/5/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - Erosion and Sediment2/29/2008 3/3/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00026.
Routing PW Flood Plain2/29/2008 2/29/2008 PASS
DetailsJim Wyllie
Routing - PUBLIC WORKS2/29/2008 2/29/2008 PASS
DetailsBeverly Hall
Plan resubmittals received  2/8/2008 DONE
received 1 transmittal letter from modus,1 transmittal letter from lochsa,3 structural calcs ,3 revisions,and 3 copies of sheets S0.1,S1.01,S1.02,S2.01,S30.3,S4.01,S5.02 inserted by Soloman Guthre from Modus Architecture. taken back to John M.
Routing - PLANNING1/28/2008 1/30/2008 PASS
DetailsMatthew A Halitsky
DRH07-00506 & CUP07-00121 & CAR05-00019-- Matthew Halitsky
Routing - PLUMBING1/29/2008 1/29/2008 PASS
DetailsBill VanDegrift
rain water system for the gutter drains under walkway must be schedule building.
Routing - PLUMBING1/18/2008 1/28/2008 FAIL
DetailsBill VanDegrift
provide a site plan showing roof drain piping connecting to site system at col. 2 and apx. B.5.

rain water system for the gutter drains under walkway must be schedule 40.
Routing Off Site - STRUCTURAL1/10/2008 1/25/2008 FAIL
DetailsJohn Menard
called action courier at ###-#### for pickup - Received comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  1/25/2008 DONE
DetailsJohn Menard
Faxed the architect a copy of the structural review requesting revisions. JCM
Routing - Erosion and Sediment1/15/2008 1/18/2008 FAIL
DetailsSteven Webb
Person listed on application as the RP is not certified as required.
Routing - PUBLIC WORKS1/11/2008 1/15/2008 FAIL
DetailsLouise Waldorf
Routing PW Drainage1/11/2008 1/15/2008 PASS
DetailsBrian Murphy
Approved under previous ODI per Jim Wylie.
Routing PW Sewer Rating1/11/2008 1/15/2008 PASS
DetailsLouise Waldorf
Routing PW Solid Waste  1/15/2008 PASS
DetailsPeter J. McCullough
Routing PW Flood Plain1/11/2008 1/11/2008 FAIL
DetailsJim Wyllie
Elevation Certificate not provided. Elevation Certificate and Site Grading Plan must document that buildings lowest floor and all electrical and mechanical equipment are elevated a minimum of 1.0 feet higher than highest adjacent grade at the building foundation. If there are questions regarding these requirements, contact Jm Wyllie at ###-####.
Routing PW Street Lights  1/11/2008 PASS
DetailsBill Colson
Routing - PLANNING Land Div1/10/2008 1/11/2008 PASS
DetailsJoan Johnson
ROS 8154
Garden Plaza sub - parcel D
Pending Assignment by MYS1/9/2008 1/10/2008 DONE
DetailsJohn Menard
1/10/2008 09:43:41 JCM - activity updated through activity BLDA166 from case BLD08-00066.
Plans ACCEPTED BY PLAN TECH  1/10/2008  
Plan routing begun/NEW & ADDTN  1/10/2008  
Recd Pcfee & Taken To Pln CK  1/9/2008  
Application received  1/9/2008  
Routing - PLAN CHECK     
John Menard