Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-00074
StatusExpired
Name BRASFIELD & GORRIE LLC
Site Address 2619 W FAIRVIEW AVE
Project NameRIVERSIDE MEDICAL CENTER
Customer Number 
ePlanReviewNo
Description
Riverside Medical Center - To construct a new 119,600 square foot, steel framed, four story hospital building and related site improvements. The first floor is 42,025 square feet and contains the main entry and waiting areas, administration areas, kitchen and dining room, gift shop, exam rooms, storage and mechanical rooms. The second floor is 41,780 square feet and contains a waiting area, admin. offices, pharmacy, staff lounges and locker rooms, operating rooms with support areas, storage and mechanical rooms. The third floor is 19,145 square feet and contains a waiting area, admin. offices, patient rooms and storage rooms. The fourth floor is 16,650 square feet and contains a waiting area, admin. offices, patient rooms and storage rooms. There are accessible, public, staff and patient restroom facilities on all floor levels. This building is seeking Leed Silver Certification. The foundation and structural frame for this building were reviewed and approved under BLD07-03161. Do to timing issues, the work under this permit has been combined with the work approved under BLD07-03161. All of the building construction will be completed under this permit. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired  9/16/2009 DONE
DetailsTisha Gallop
Per JCM expire permit
Telephone call  9/16/2009 DONE
DetailsJason Blais
Telephone call with architect, Dallas Hughes. Project is not happening. Notified him of permit expiration.
BLD-Aging Inspection4/6/20094/6/20094/7/2009 PASS
DetailsDave Hannah
Issue PAID IN FULL permit  1/5/2009 DONE
Telephone call  12/24/2008 DONE
DetailsBarbara Stitt
Left voice message that permit is ready & fees due///12-24-08 @ 9:55am BAS
Permit Ready to Issue  12/24/2008 DONE
DetailsBarbara Stitt
PLANS/APPL TAKEN TO FRONT DESK  12/23/2008 DONE
DetailsJohn Menard
Print Occupancy Form  12/23/2008 DONE
Details
Permit EXTENDED  12/23/2008 DONE
DetailsBarbara Stitt
Per extension letter of 8-5-08 extended to 1-10-09 per Marsha Smylie
CHANGE STATUS TO (FEE)  12/23/2008 DONE
DetailsBarbara Stitt
Changed to ISS status when added activity to extend permit to 1-10-09
Plan assigned to (JCM)1/16/2008 12/23/2008 PASS
DetailsJohn Menard
12/23/2008 13:39:25 JCM - activity updated through activity BLDA022 from case BLD08-00074.
Routing - PLAN CHECK5/21/2008 12/23/2008 PASS
DetailsJohn Menard
Reviewed and approved final revisions with red lined notes and attached plan clarification notes. Combined foundation and structural frame plans and construction documents previously approved under BLD07-03161 into these approved plans. The entire building from foundation up to be constructed and finished under this permit. All values and fees to combined and collected under this permit. JCM
Received Certificate of Value  12/18/2008 DONE
DetailsBarbara Stitt
The new certificate of value is to combine the foundation and structural frame work approved under BLD07-03161 with this tenant improvement permit. BLD07-03161 was expired and the entire building project, from foundation up, will now be constructed under this permit. JCM
Plan resubmittals received  12/16/2008  
DetailsJohn Menard
Rec'd transmittal sheet, two copies of application, and two copies of sheets- G-000, G-001, A-308, MEP-201; taken to John M
Plan resubmittals requested  9/19/2008 DONE
DetailsJohn Menard
E-mailed the architect a letter requesting additional revisions. JCM
Meeting  9/4/2008 DONE
DetailsJason Blais
Met with architect to insert the resubmittal plans received via mail on 8/27/08 into the two sets of plans. Letter concerning access controlled egress door hardware also received and forwarded to the Building Official for review.
Plan resubmittals received  8/27/2008  
DetailsJason Blais
Received via mail-1 cover transmittal, 2 copies of plan review report dated 6-6-08, 2 copies of Table of Contents, 2 copies of Addendum #3 dated 6-20-08 (Blue page 2 sided), 2 copies of specs for Metal Ducts (17 pages 2 sided), 2 copies of sheets G-000, G-001, A-012, A-222, A-562, A-702, A-800, A-821, MEP-201, M-201A, M-202A, M-805, E-501, E-808 stamped and taken to Jason Blais's area///8/27/08 @ 10:45am BAS
Telephone call  8/4/2008 DONE
DetailsMarsha Smylie
per Jenifer Gilland ok to extend permit to Jan. 10th 2009- see scanned document
Telephone call  7/21/2008 DONE
DetailsJason Blais
Phone call with Dallas concerning expiration of plan review on this permit. Sent follow up e-mail quoting ordinance language and requesting Dallas provide a letter requesting an extension of the plan review on this permit. Letter to be addressed to Jenifer Gilliland, Building Division Manager, an to include an explanation on the circumstances as to why additional time is needed.
Plan resubmittals requested  6/6/2008 DONE
DetailsJohn Menard
E-mailed the architect a second comment list requesting additional revisions. JCM
Routing - FIRE5/19/2008 5/21/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLUMBING5/19/2008 5/19/2008 PASS
DetailsBill VanDegrift
Route to Fire after Plumbing Review. per plans, letter from ccrd dated 4/21/08 and 2003 upc.
Routing - PLAN CHECK4/2/2008 5/19/2008 PEND
DetailsJason Blais
Routing plans to Plumbing first for review of resubmittals and response. Fire Plan Check and Building Plan Check to follow.
Plan resubmittals received  5/13/2008 DONE
DetailsDarla L Downs
received 1 response letter to Mark Grimes,1 response letter to John M. 1 safty information, 1 letter to Scott A. , 1 material safty data sheet and 2 copies of sheets G-000,G-001,EN-01,A-011,A-012,A-013,A-014,A-050,A-201A,A-201B,A-202A,A-202B,A-203A,A-204A,A-211A,A-211B,A-212A,A-212B,A-213A,A-214A,A-221,A-222,A-231A,A-231B,A-232A,A-232B,A-233A,A-233B,A-234A,A-234B,A-234B,A-241A,A-241B,A-242A,A-242B,A-243A,A-244A,A-251,A-252,A-253,A-254,A-301,A-302,A-303,A-308,A-401,A-402,A-403,A-404,A-410,A-411,A-420,A-421,A-422,A-423,A-500A-512,A-514,A-515,A-516,A-517,A-531,A-532,A-533,A-534,A-540,A-541,A-542,A-551,A-552,A-701,A-702,A-703,A-704,A-711,A-800,A-821,A-831,A-832,A-840,A-841,A-851,A-852,MEP-201,M-000,M-106,M-201A,M-201B,M-202A,M-302AM-501,M-502,M-801,M-803,M-804,M-805,E-201A,E-201B,E-202A,E-203A,E204A,E-301A,E-301B,,E-302A,E-303A,E-303B,E-304A,E-304B,4-401A,E-401B,E-402A,E-402B,E-403A,E-602,E-802,E-803,E-804,P-101A,P-101B,P-201A,P-201B,P-202A,P-203A,P-204A P-501,P-502,P-503,P-504,P-603,P-703,P-802,CM.03A,CM.03B,CM.1A,CM.1B,CM.2A,CM.2B,CM.3A,CM.3B,CM.4A,CM.4B,PHAR-1,PHRA-4 plans to be inserted by Dan Mortimerof Brasfield and Gorrie llc 5-13-08 and plans taken back to John M.
1st review completed  4/2/2008 FAIL
Failed Plumbing, Plan Check, Fire
Routing - FIRE3/28/2008 4/2/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Routing - PLAN CHECK1/28/2008 3/28/2008 FAIL
DetailsJohn Menard
Telephone call  3/28/2008 DONE
DetailsSam Rogers
Telcon voice message from Dallas Hughes with Perkins and Will Arch's, Dallas, TX, ###-#### inquiring about whether we accept an FM200 system in lieu of sprinklers. I called back, left voice message that we follow IFC 907.4.2 and normally there alternatives, exceptions or reductions allowed by the building design for sprinkler protection which were used, which would preclude allowing FM200 in lieu of sprinklers.
Plan resubmittals requested  3/28/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Meeting  2/5/2008 DONE
DetailsJason Blais
Meeting with Bobbie Kale and Scott Arellano to again discuss information needed on hazardous materials for Fire Review. Some information provided, however, additional quantified hazardous materials is needed concerning the cryogenic closed loop system and the number and size of cylinders in the medical gas storage room. Bobbie will pursue and will be providing needed information.
Meeting  2/5/2008 DONE
DetailsScott Arellano
Meeting with Bobbi of riverside medical center and Jason Blais (project manager). Discussed hazardous material information submittals. Bobbi provided MSDS information, cryogen equipment process paperwork and exterior LOX storage schematic. Quantities of cryrogen and oxidizing gases have not been prepared as of yet.
Routing - PLANNING1/28/2008 1/28/2008 PASS
DetailsCody Riddle
Approved per DRH07-00410 Andrea Tuning and routed to Cody Riddle for final approval of CUP07-00067.

Approved. Construction must comply with all terms and conditions of CUP07-00067. The "Phase II" parking referenced on the architectural site plan will require Design Review approval. Parking must comply with already approved drawings, and meet all required setbacks.
Routing - Erosion and Sediment1/16/2008 1/18/2008 PASS
DetailsSteven Webb
Reference grading permit BLD07-03058 per Steve Webb and Jason Blais. ESC plan was approved under BLD07-03058. Informed contractor that a NOI is required for this project. Filing must be done with the EPA.
Routing PW Solid Waste1/15/2008 1/17/2008 PASS
DetailsPeter J. McCullough
Still working with architect on clearance requirements for the compactor.

Petre McCllough, 384 3906
Telephone call  1/17/2008 DONE
DetailsSam Rogers
Telcon from Bill Kissinger, ATS Controls, Boise, ###-####. Inquiring on approval requriements for smoke control systems. Referred in to IFC 909.12.
Routing PW Sewer Design1/15/2008 1/16/2008 PASS
DetailsJim Pardy
Routing PW Street Lights1/16/2008 1/16/2008 PASS
DetailsBill Colson
Routing PW Drainage1/14/2008 1/16/2008 PASS
DetailsBrian Murphy
Signed off on grading package. Brian Murphy ###-####
Routing - PUBLIC WORKS1/14/2008 1/16/2008 PASS
DetailsBeverly Hall
Pending Assignment by MYS1/10/2008 1/16/2008 DONE
DetailsJohn Menard
1/16/2008 11:08:50 JCM - activity updated through activity BLDA166 from case BLD08-00074.
Routing PW Sewer Rating1/14/2008 1/15/2008 PASS
DetailsLouise Waldorf
Routing PW Environmental1/14/2008 1/14/2008 PASS
DetailsWalt Baumgartner
Owner to utilize City approved grease interceptor (GI) design attached to both sets of plans. 2000 gal vault ok, or use two 1500 gallon in series which ever is preferred. GI is on east side outside kitchen. Plans show blind sump decontamination vault west side of building. Limestone chip acid neutralization sump on east side of building.
Routing - PLANNING Land Div1/11/2008 1/14/2008 PASS
DetailsDave Abo
Legal parcel that existed prior to October 30, 1965 verified by recorded deed.
Plans ACCEPTED BY PLAN TECH  1/11/2008 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  1/11/2008 DONE
DetailsTisha Gallop
(F) Reprint permit  1/11/2008 DONE
DetailsTisha Gallop
Application received 1/10/20081/10/2008 DONE
DetailsTisha Gallop
Routing - PLUMBING1/18/2008 1/28/2007 FAIL
DetailsBill VanDegrift
provide information ststing the domestic hot water heat exchangers are double wall with leak detection to atmocphere.

the wter into the lab must be protected by R.P.s outside the lab over a drain, eyewash/shower must be supplied from upstream of the R.P.s. the R.P. in the Bio Haz. room must be moved outside of the room over a drain. if required. the R.P.s for the ice makers will need to be installed over a drain. provide a PVB on the hose reel in the kitchen.

provide a 3" min. vent through the roof on the grease interceptor.

increase the upper end vent on the combination waste and vent system to 3".

pipe mop sink in kitchen to the grease waste.