Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD08-00076
StatusFinaled
Name CM COMPANY
Site Address 398 S 9TH ST Unit: 290
Project NameBODO BLDG #4
Customer Number 
ePlanReviewNo
Description
(STRATTON OFFICE - RESTROOM ADDITION - BODO BLDG #4 - SUITE 290) This building is fire sprinklered for building area increase and for fire area reasons. To construct a 290 square foot restroom addition to an existing 2,520 square foot office tenant space located on the 2nd story of Bodo Building #4 (Northeast end). After the addition, this tenant space will have a total floor area of about 2,810 square feet. The restroom area was demised under permit BLD07-03236 in conjunction with work permitted in an adjacent area. Work is to include interior nonbearing walls, suspended gypsum board ceilings, 2 restrooms accessible to the disabled, interior doors, and finishes. In addition, a new HVAC unit will be installed on the roof in conjunction with this permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 4/22/20088/11/2008 DONE
Permanent Occupancy UNPAID FEE  4/22/2008 DONE
BLD-Final4/18/20084/21/20084/21/2008APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/18/2008 at 3:13:36 PM. Contact: ###-####. ok for perm occ
FIRE-Final Inspection4/21/20084/21/20084/21/2008PPASS
DetailsForrest France
Fire life safety inspection passed.
BLD-Wall cover3/21/20083/24/20083/24/2008PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/21/2008 at 8:30:47 AM. Contact: ###-####.
Routing - PLAN CHECK3/12/2008 3/13/2008 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  3/13/2008 DONE
Print Occupancy Form  3/13/2008 DONE
Telephone call  3/13/2008 DONE
t/c w brandi jones at ###-#### - permit ready and fees given
Permit Ready to Issue  3/13/2008 DONE
Issue PAID IN FULL permit  3/13/2008  
Plan assigned to (CJW)1/28/2008 3/13/2008 PASS
DetailsCarl Westfall
3/13/2008 08:16:05 CJW - activity updated through activity BLDA022 from case BLD08-00076.
Routing - FIRE3/11/2008 3/12/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  3/12/2008 FAIL
Failed Plan Check
Plan resubmittals received  3/11/2008  
Received a cover transmittal and 2 copies of sheets A2.1 and A7.1 and taken to Carl Westfall///3-11-08 @ 1:07pm BAS
Routing - PLAN CHECK1/29/2008 3/11/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on March 6, 2008 and was finished on March 11, 2008. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS1/28/2008 1/29/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating1/29/2008 1/29/2008 PASS
DetailsLouise Waldorf
Pending Assignment by MYS1/10/2008 1/28/2008 DONE
DetailsMarlene Southard
1/28/2008 16:06:44 MYS - activity updated through activity BLDA172 from case BLD08-00076.
Plans ACCEPTED BY PLAN TECH  1/11/2008  
Recd Pcfee & Taken To Pln CK  1/10/2008  
Application received  1/10/2008  
Third Notice BLD9/22/20089/22/2008   
Second Notice has not been responded to.