Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD08-00080
StatusFinaled
Name HACKER & SONS CONSTRUCTION
Site Address 2475 S APPLE ST 200
Project NameCarriage Crossing-Bldg #2
Customer Number 
ePlanReviewNo
Description
(ST LUKE'S IDAHO ELKS REHAB SERVICES - CARRIAGE CROSSING BLDG #2 - 2ND FLR) To construct a full 2nd floor build out for a new 2,983 sq.ft. reahabilitation medical office in an existing shell including interior walls to create offices, treatment rooms, break rooms, restrooms, and support areas. Install suspended ceiling grid system, interior finishes, electrical, mechanical and plumbing to meet tenant needs and comply with minimum adopted codes and ordinances. All work per approved plans. Elevator and 2 exit stairways are existing. This building is NOT fire sprinklered. ~SRZ~
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/15/20103/29/2010 DONE
received FV on 8/6/08 see scanned document
Second Notice 3/6/20103/10/2010 DONE
Permanent Occupancy  2/12/2010 DONE
BLD-Aging Inspection12/8/200912/8/200912/8/2009 DONE
DetailsJim Storey
9/2/08 passed noted card on site.
BLD-Aging Inspection10/5/200910/5/200910/5/2009 DONE
DetailsJim Storey
9/2/08 passed noted card on site.
BLD-Aging Inspection8/5/20098/5/20098/5/2009 PASS
DetailsJim Storey
9/2/08 passed noted card on site.
BLD-Aging Inspection6/5/20096/5/20096/5/2009 DONE
DetailsJim Storey
9/2/08 passed noted card on site.
BLD-Aging Inspection4/1/20094/1/20094/1/2009 DEFR
DetailsJim Storey
9/2/08 passed noted card on site.
BLD-Aging Inspection1/27/20091/27/20091/27/2009 DONE
DetailsJim Storey
9/2/08 passed noted card on site.
BLD-Aging Inspection9/1/20089/1/20089/2/2008 PASS
DetailsJim Storey
card on site.
BLD-Final6/26/20086/27/20086/27/2008PPASS
DetailsJim Storey
bill Note: please call 1/2 hr prior to inspection Phone #: ###-####
FIRE-Final Inspection6/26/20086/27/20086/27/2008APASS
DetailsForrest France
Life safety inspection passed, tactile signage at the area of refuge to be installed when delivered per contractor, public phone line to be installed today-can be verified at next visit for the adjacent project.
FIRE-Final Inspection6/24/20086/25/20086/25/2008PNR
DetailsForrest France
Bill, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in6/23/20086/24/20086/24/2008APASS
DetailsJim Storey
bill - ceiling grid - please call 1/2 hr prior to inspection Phone #: ###-####
BLD-Framing/Rough-in6/20/20086/23/20086/23/2008AFAIL
DetailsJim Storey
Bill Phone #: ###-#### clip all sides of grid/ support hvac termanations/
BLD-Energy code compliance5/9/20085/12/20085/12/2008APASS
DetailsJim Storey
bill - please call 1/2 hr prior to inspection Phone #: ###-####
BLD-Framing/Rough-in5/7/20085/8/20085/8/2008APART
DetailsJim Storey
bill - please call for access Phone #: ###-#### putty pad two locations to protect 2nd floor area off refuge at ele boxes thur penatrations. ok to insulate.
Issue PAID IN FULL permit  4/1/2008 DONE
Routing - PLAN CHECK3/28/2008 3/31/2008 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  3/31/2008 DONE
Print Occupancy Form  3/31/2008 DONE
Telephone call  3/31/2008 DONE
tlk to matt rhees ###-#### and left vm with bill ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  3/31/2008  
Plan assigned to (SRZ)1/28/2008 3/31/2008 PASS
DetailsSam Zahorka
3/31/2008 08:52:50 SRZ - activity updated through activity BLDA022 from case BLD08-00080.
Routing - FIRE3/25/2008 3/28/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  3/28/2008 FAIL
FailedPlan Check
Plan resubmittals received  3/25/2008 DONE
received transmittal, 1 letter to George Slane taken to Sam Z.
Plan Reviewer's activity  3/25/2008 DONE
DetailsSam Zahorka
Recieved Approved Alternate letter from the architect signed by the Building Official. Resubmittals recieved and working on second plan review.
Case Summary (BLD)  3/25/2008 DONE
Plan resubmittals received  3/24/2008 DONE
received 1 project letter,1 letter to George S.,1 letter to whom it may concern, and 2 copies of sheets A0.0,A1.0,A2.0,A4.0 taken to Sam Z.
Telephone call  3/19/2008 DONE
Recieved a telephone call from Matt Rhees requesting a response to his proposed solution as suggested by another plan reviewer Carl Westfall. I let him know I was finishing up a response letter and would correspond as soon as possible. I also let him know a response to the Building official would be required for an alternate approval. (SRZ)
Case Summary (BLD)  3/11/2008 DONE
Meeting  3/10/2008 DONE
DetailsSam Zahorka
Met with Matt Rhees,John Price, and other city staff. Accessibility issues and plan correction items were discussed for possible solutions. Meeting adjourned with a final answer from the building official. (SRZ)
Plan resubmittals received  3/4/2008  
received 1 project letter,oildraulic elevator data,1 plan review report,1 project general notes taken to Sam Z..
Plan resubmittals requested  2/29/2008 DONE
DetailsSam Zahorka
Sent second plan review response letter to the Architect concerning his plan re-submittals. Waiting for new corrected plans.
Routing - PLAN CHECK2/26/2008 2/29/2008 FAIL
DetailsSam Zahorka
Sent second plan review response letter to the Architect concerning his plan re-submittals. Waiting for new corrected plans.
Plan resubmittals received  2/28/2008 DONE
received 1 project letter, and 2 copies of sheet A2.0 taken to Sam Z.
Routing - PLAN CHECK1/30/2008 2/26/2008 FAIL
DetailsSam Zahorka
1st Plan review completed. Design has Accessibility issues. Letter sent to Architect. Awaiting response. (SRZ ###-####)
Case Summary (BLD)  2/25/2008 DONE
Routing - PLANNING1/29/2008 1/30/2008 PASS
DetailsSarah Schafer
Sarah Schafer (checking for allowed use in the zone)

Approved use through the use exceptions CUP98-00158 and CUP01-00019.
Routing PW Sewer Rating1/29/2008 1/29/2008 PASS
DetailsLouise Waldorf
Routing - PUBLIC WORKS1/28/2008 1/29/2008 PASS
DetailsBeverly Hall
Pending Assignment by MYS1/15/2008 1/28/2008 DONE
DetailsMarlene Southard
1/28/2008 16:21:14 MYS - activity updated through activity BLDA160 from case BLD08-00080.
Recd Pcfee & Taken To Pln CK  1/15/2008 DONE
Plans ACCEPTED BY PLAN TECH  1/15/2008  
Application received  1/11/2008  
Routing - PLAN CHECK3/25/2008   PEND
DetailsSam Zahorka
Pending others to pass.