Case Summary (BLD) | | | 7/21/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/25/2008 | 8/26/2008 | 8/26/2008 | P | PASS |
Tony Young
|
|
|
christine Phone #: ###-####
|
DOC - Permit Finaled | 8/26/2008 | 8/26/2008 | 8/26/2008 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 8/26/2008 | 8/26/2008 | 8/26/2008 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 5/9/2008 | 5/9/2008 | 5/9/2008 | P | PASS |
Mike Jordan
|
|
|
john Phone #: ###-####
|
BLD-Framing/Rough-in | 5/5/2008 | 5/6/2008 | 5/6/2008 | A | PASS |
Tony Young
|
|
|
john Phone #: ###-####
|
BLD-Wall cover | 4/23/2008 | 4/23/2008 | 4/23/2008 | P | PASS |
Tony Young
|
|
|
john Note: shear Phone #: ###-#### ext shear ok
|
BLD-Other | 4/22/2008 | 4/23/2008 | 4/23/2008 | A | PART |
Tony Young
|
|
|
john Note: shear Phone #: ###-#### needs more nailing
|
BLD-Foundation | 2/21/2008 | 2/22/2008 | 2/22/2008 | P | PASS |
Tony Young
|
|
|
jed Phone #: ###-####
|
BLD-Footing | 2/19/2008 | 2/20/2008 | 2/20/2008 | P | PASS |
Tony Young
|
|
|
jed Phone #: ###-####
|
PubWorks Subgrade Approval | 2/20/2008 | 2/20/2008 | 2/20/2008 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 2/11/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/1/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/1/2008 | | DONE |
|
|
|
left vm for john johnson x 3 at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 2/1/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/29/2008 | | 1/31/2008 | | PASS |
Ben S. Pavelka
|
|
|
|
Case Summary (BLD) | | | 1/31/2008 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2008 | | DONE |
|
|
|
|
Pending Assignment by SRZ | 1/15/2008 | | 1/31/2008 | | DONE |
Ben S. Pavelka
|
|
|
|
Telephone call | | | 1/29/2008 | | |
|
|
|
Called John Johnston at 12:00 on Tuesday, January 29 at ###-#### to request engineering for the retaining wall, beam calculations, and engineering for expanded footings. (BSP)
|
Plans ACCEPTED BY PLAN CHECK | | | 1/28/2008 | | |
Ben S. Pavelka
|
|
|
|
Routing - FIRE | 1/18/2008 | | 1/22/2008 | | PASS |
Sam Rogers
|
|
|
No fire sprinklers required. (Somerset Ridge #4 sub)
|
Routing - Erosion and Sediment | 1/18/2008 | | 1/18/2008 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 1/17/2008 | | 1/18/2008 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | 1/17/2008 | | 1/17/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PUBLIC WORKS GRADING | 1/17/2008 | | 1/17/2008 | | PASS |
Terry Records
|
|
|
Approved as Category 3
|
Application received | | | 1/15/2008 | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 1/15/2008 | | 1/15/2008 | | FAIL |
Terry Records
|
|
|
Grading plan indicates a 6 foot high wall which must be approved by P&Z prior to approval of the building permit grading plan. Also the plan does not indicate the existing storm drain in the rear yard. Spoke with Ryan carnie at Lochsa.
|
Routing - Addressing | 1/15/2008 | | 1/15/2008 | | PASS |
Chris Pichardo
|
|
|
|
Routing - PLAN CHECK | | | | | FAIL |
|
|
|
Called John Johnston at 12:00 on Tuesday, January 29 at ###-#### to request engineering for the retaining wall, beam calculations, and engineering for expanded footings. (BSP)
|