Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-00125
StatusFinaled
Name CALLIES CONSTRUCTION
Site Address 2555 S FIVE MILE RD
Project NameAURORESKY BLDG #3
Customer Number 
ePlanReviewNo
Description
(BANANAS OF BOISE DAY CARE - AURORESKY BLDG #3) To build-out & finish an existing 2,904 sq. ft. SHELL building with a 960 sq. ft. basement (for storage only). To use 1,814 sq. ft. for day care and 1,090 sq. ft. for office, reception, kitchen and restrooms per approved plans, red-line notes on plans and all attached plan review reports from all reviewing agencies and CUP06-00165. Work includes construction of interior walls, ceilings, two additional restrooms, electrical, mechanical, plumbing and finishes. To add an additional accessible egress door in the exterior north wall, providing three required exits from the first floor, all with panic hardware. The basement storage is separated from the main floor by a 1-hour floor/ceiling assembly and served by a 1-hour exit stair enclosure, constructed under the SHELL permit. Dual level switching is indicated for energy code lighting reduction control compliance on plans. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD9/22/20089/22/200811/21/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 6/10/20088/11/2008 DONE
BLD-Final6/10/20086/10/20086/10/2008PPASS
DetailsMike Jordan
ed Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection6/10/20086/10/20086/10/2008PPASS
DetailsTroy Cobbley
fire life safety passed
Permanent Occupancy  6/10/2008 DONE
FIRE-Final Inspection6/5/20086/6/20086/6/2008PFAIL
DetailsTroy Cobbley
Overbooked and the project related fire alarm permit is not ready.
BLD-Framing/Rough-in4/8/20084/9/20084/9/2008APASS
DetailsMike Jordan
randy Phone #: ###-####. interior wood framed walls ok. Also went over other requirements for E occ with contractor and all red lined items. Also noted to contraxctor that shell and core not finaled.
Issue PAID IN FULL permit  3/27/2008 DONE
Routing - FIRE3/17/2008 3/18/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK3/18/2008 3/18/2008 PASS
DetailsDan Stuart
To permit desk to issue
PLANS/APPL TAKEN TO FRONT DESK  3/18/2008 PASS
Print Occupancy Form  3/18/2008 DONE
CHANGE STATUS TO (RDY)  3/18/2008 DONE
Telephone call  3/18/2008 DONE
Randy was called permit ready and fee given ///dld
Plan assigned to (DRS)2/6/2008 3/18/2008 PASS
DetailsDan Stuart
3/18/2008 09:51:48 DRS - activity updated through activity BLDA022 from case BLD08-00125.
Plan resubmittals received  3/17/2008 DONE
Received 1 project letter,and 2 copies of sheets A2.0,A9.0 taken to Dan S.
Routing - PLAN CHECK3/13/2008 3/17/2008 PEND
DetailsDan Stuart
Resubmittals of 3/17/08 inserted into plans. No further submittals required. Routing to fire code analyst for review.
Plan resubmittals requested  3/13/2008 DONE
Remaining code items needing to be addressed e-mailed to architect, i.e. clearance at door to accessible restrooms & drinking fountain floor clearance removed by actions for corrections to drinking fountain & drinking fountain requirement for high and low fountains not provided and indicated on plans.
Routing - PLAN CHECK2/22/2008 3/13/2008 FAIL
DetailsDan Stuart
Resubmittals of 3/6/08 were incomplete. Two items remain to be corrected to provide code compliance due to changes made to plans with resubmittals or corrections not shown on plans in resubmittals. Plan review items needing correction e-mailed to architect with copy to Randy Callies.
Plan resubmittals received  3/7/2008  
received project letter from the architects office (2) pages & "2" sheets each of AO.O, A2.O, A9.O, & E2.O--plans taken to Dan Stuart
1st review completed  2/22/2008 FAIL
Failed Plan Check, Fire
Routing - FIRE2/20/2008 2/22/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Plan resubmittals requested  2/20/2008 DONE
Copy of plan review corrections e-mailed to architect.
Routing - PLAN CHECK2/7/2008 2/20/2008 FAIL
DetailsDan Stuart
Plan review corrections e-mailed to architect, Mark Sanders. Routing plans to fire code analyst for review.
Plan resubmittals received  2/19/2008  
Received 1 cover letter, 1 monthly menu, 1 drawing and taken to Dan Stuart to talk to///2-19-08 @ 10:45 BAS
Plan resubmittals received  2/19/2008  
received transmittal and three copies of sheet A2.0; taken to Dan Stuart
Routing - PLANNING2/6/2008 2/7/2008 PASS
DetailsSue Hansen
CUP07-00227
Routing - PUBLIC WORKS2/6/2008 2/6/2008 PASS
DetailsBeverly Hall
Pending Assignment by MYS1/23/2008 2/6/2008 DONE
DetailsMarlene Southard
2/6/2008 12:07:47 MYS - activity updated through activity BLDA168 from case BLD08-00125.
Routing Off Site - C.D.H2/4/2008 2/6/2008 PASS
DetailsBarbara Stitt
Plans given to Mark Sanders to get Central District Health stamp and signature//Plans returned from Mark Sanders with Central District Health stamp and signature///2-6-08 @ 9:45am BAS
Routing PW Sewer Rating2/6/2008 2/6/2008 PASS
DetailsLouise Waldorf
Application received  1/23/2008  
Recd Pcfee & Taken To Pln CK  1/23/2008 DONE
Plans ACCEPTED BY PLAN TECH  1/23/2008