Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/4/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/11/2008 | 8/11/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 6/11/2008 | | DONE |
Cathy Weisshaupt
|
|
|
|
BLD-Final | 6/10/2008 | 6/10/2008 | 6/10/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/10/2008 at 5:30:31 AM. Contact: ###-####.
|
FIRE-Final Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed, HVAC unit duct detectors tested okay.
|
FIRE-Final Inspection | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | CANC |
Troy Cobbley
|
|
|
Per Pat this is to be rescheduled for tomorrow after the duct smoke detectors have been pretested.
|
BLD-Final | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/9/2008 at 6:22:54 AM. Contact: ###-####.
|
BLD-Final | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/6/2008 at 6:54:05 AM. Contact: ###-####.
|
FIRE-Final Inspection | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | CANC |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 6/6/2008 at 6:53:19 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/29/2008 | 5/30/2008 | 5/30/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/28/2008 at 4:41:54 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/28/2008 | 5/29/2008 | 5/29/2008 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/28/2008 at 4:44:58 PM. Contact: ###-####. out of time rolled over.
|
BLD-Framing/Rough-in | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/21/2008 at 4:52:52 PM. Contact: ###-####.ceilling and draftstop ok.
|
FIRE-Conference | 5/19/2008 | 5/19/2008 | 5/19/2008 | P | DONE |
Troy Cobbley
|
|
|
I discussed the placement of two exit signs as shown on the approved plans in the first floor corridor at the east end with the electrical contractor.
|
CHANGE ISSUED DATE | | | 4/25/2008 | | DONE |
Rita DeYoung
|
|
|
|
Issue PAID IN FULL permit | | | 4/23/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/14/2008 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/14/2008 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 4/7/2008 | 4/7/2008 | 4/10/2008 | | PASS |
Carl Westfall
|
|
|
4/10/2008 10:51:00 CJW - activity updated through activity BLDA022 from case BLD08-00127.
|
Routing - PLAN CHECK | 4/7/2008 | | 4/10/2008 | | PASS |
Carl Westfall
|
|
|
Approved plan modification to move drinking fountains to the waiting area.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/10/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/10/2008 | | DONE |
|
|
|
plan mod
|
Telephone call | | | 4/10/2008 | | DONE |
|
|
|
Left voice message for Trent that permit is ready & fees///4-10-08 @ 12:00pm BAS
|
Plan Modification Accepted | | | 4/7/2008 | | |
|
|
|
plan modification excepted for bld08-00127 for the redesign of moved ada drinking fountain from breakroom to waiting lobby on sheets A1.1. Routed to Carl Westfall
|
BLD-Framing/Rough-in | 4/2/2008 | 4/3/2008 | 4/3/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/2/2008 at 4:36:35 PM. Contact: ###-####. walls ok/ fire stopping at office soffit required.
|
Print Occupancy Form | | | 3/31/2008 | | |
|
|
|
|
Telephone call | | | 3/31/2008 | | |
|
|
|
tlk to ben miller ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 3/31/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/31/2008 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 2/5/2008 | | 3/28/2008 | | PASS |
Carl Westfall
|
|
|
3/28/2008 15:19:15 CJW - activity updated through activity BLDA022 from case BLD08-00127.
|
Routing - FIRE | 3/26/2008 | | 3/28/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 3/28/2008 | | 3/28/2008 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2008 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 3/26/2008 | | 3/26/2008 | | PASS |
|
|
|
Added 2 drinking fountains.
|
Routing - PLAN CHECK | 3/18/2008 | | 3/26/2008 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmittal review.
|
Plan resubmittals received | | | 3/20/2008 | | |
|
|
|
Received transmittal, response letter, and two copies of pages A1.1, A3.1, A9.1, A9.2, A10.1; taken to Carl Westfall
|
1st review completed | | | 3/18/2008 | | FAIL |
|
|
|
Failed Plan Check, Fire
|
Routing - FIRE | 3/17/2008 | | 3/18/2008 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
Routing - PLAN CHECK | 2/7/2008 | | 3/17/2008 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on March 13, 2008 and was finished on March 17, 2008. Revised drawings were required. See the plan review report.
|
Routing - PLUMBING | 2/5/2008 | | 2/7/2008 | | PASS |
Bill VanDegrift
|
|
|
verify premise protection. per plans and 2003 upc provisions for future 2nd floor waste systems?
|
Routing - PUBLIC WORKS | 2/5/2008 | | 2/5/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Environmental | 2/5/2008 | | 2/5/2008 | | PASS |
Terry Alber
|
|
|
|
Routing PW Sewer Rating | 2/5/2008 | | 2/5/2008 | | PASS |
Louise Waldorf
|
|
|
|
Pending Assignment by MYS | 1/23/2008 | | 2/5/2008 | | DONE |
Marlene Southard
|
|
|
2/5/2008 07:56:01 MYS - activity updated through activity BLDA172 from case BLD08-00127.
|
Plans ACCEPTED BY PLAN TECH | | | 1/23/2008 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/23/2008 | | DONE |
|
|
|
|
Application received | | | 1/23/2008 | | |
|
|
|
|