Permit NumberBLD08-00155
StatusFinaled
Name BOB CAFFERTY BUILDERS INC
Site Address 250 E PARKCENTER BLVD
Project NameSUPERVALU
Customer Number 
ePlanReviewNo
Description
(SUPERVALU - PHASE 2) -(2nd Floor) (SIX SIGMA & IMW) To remodel a 31,557 sq ft portion of the second story located in the southwest corner of the building for office tenant per approved plans. Work to include, selective demolition of interior nonbearing partitions, construction of new partitions for private office spaces, small conference rooms, and open office area, repair and relocate existing suspended ceiling and lighting, relocate any diffusers as necessary, this building is fully fire sprinklered for unlimited area any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. RmH **(PLAN MODIFICATION)**(3-31-08)** To reconfigure office layout, and open office area from the original layout per approved plans. RmH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice1/27/20091/27/20093/4/2009 DONE
DetailsJim Storey
BLD-Aging Inspection1/27/20091/27/20091/27/2009 PASS
DetailsJim Storey
DOC - Permit Finaled1/27/20091/27/20091/27/2009PPASS
DetailsJim Storey
BLD-Final5/1/20085/1/20085/1/2008PPART
DetailsJim Storey
bob Phone #: ###-#### as noted on plan
FIRE-Final Inspection5/1/20085/1/20085/1/2008PPART
DetailsForrest France
Fire life safety okayed for the west half of the phase two remodel as noted on plans with today's date, hardware at one small conference room to be replaced as agreed.
CHANGE STATUS TO (ISS)  4/1/2008  
already issued previously- plan mod
(F) Reprint permit  4/1/2008  
Case Summary (BLD)  3/31/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/31/2008 DONE
Telephone call  3/31/2008 DONE
tlk to Chris Anderson ###-#### that permit and fees are ready to be picked up
Override - Parcel Holds  3/31/2008  
Permit Ready to Issue  3/31/2008 DONE
Plan assigned to (R_H)3/21/20083/21/20083/21/2008 DONE
DetailsBarbara Stitt
Plan Modification Accepted  3/21/2008  
Plan modification accepted to modify the reconfiguration of the office layout in IMW area. Submitted pages A0.00, A0.01, A1.00, A1.01, A1.10, A1.11, A2.00, A2.01, A2.10, A2.11, A3.00 and raouted to Ron HIll///3-24-08 @ 1:40pm BAS
CHANGE STATUS TO (REV)  3/20/2008 DONE
Plan Modification submitted
Plan Modification Accepted  3/19/2008  
BLD-Framing/Rough-in2/22/20082/25/20082/25/2008APASS
DetailsJim Storey
bob Phone #: ###-####
BLD-Framing/Rough-in2/22/20082/22/20082/22/2008PCANC
DetailsJim Sly
bob Phone #: ###-####
Canc by Contr.
Issue PAID IN FULL permit  2/19/2008 DONE
Routing - PLAN CHECK2/11/2008 2/12/2008 PASS
DetailsRon Hill
PLANS/APPL TAKEN TO FRONT DESK  2/12/2008 DONE
Print Occupancy Form  2/12/2008 DONE
Telephone call  2/12/2008 DONE
t/c w chris anderson at ###-#### -permit ready and fees given
Permit Ready to Issue  2/12/2008 DONE
Plan assigned to (R_H)1/28/2008 2/12/2008 PASS
DetailsRon Hill
2/12/2008 09:37:08 RMH - activity updated through activity BLDA022 from case BLD08-00155.
Routing - FIRE2/7/2008 2/11/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  2/11/2008 PASS
Case Summary (BLD)  2/7/2008 DONE
Routing - PLAN CHECK1/25/2007 2/7/2008 PASS
DetailsRon Hill
Pending Assignment by MYS1/28/2008 1/28/2008 DONE
DetailsTisha Gallop
1/28/2008 09:22:03 LEG - activity updated through activity BLDA175 from case BLD08-00155.
Plans ACCEPTED BY PLAN TECH  1/28/2008  
Recd Pcfee & Taken To Pln CK  1/28/2008 DONE
Application received  1/25/2008