Third Notice BLD | 9/22/2008 | 9/22/2008 | 10/23/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/5/2008 | 8/11/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/19/2008 | | DONE |
|
|
|
|
BLD-Final | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PASS |
Mike Jordan
|
|
|
All issues resolved. ok for perm occ.
|
BLD-Final | 5/2/2008 | 5/5/2008 | 5/5/2008 | A | FAIL |
Mike Jordan
|
|
|
tony Phone #: ###-####. Needs to add threshold at door to storefront from stockroom. 2 inch in elrv. change.
|
Permanent Occupancy | | | 5/5/2008 | | DONE |
Cathy Weisshaupt
|
|
|
|
FIRE-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Framing/Rough-in | 4/7/2008 | 4/8/2008 | 4/8/2008 | A | PASS |
Mike Jordan
|
|
|
Tony - American Eagle Outfitters; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. hat channel for hardlids, steel stud framing for restrooms and hardlids ok.
|
BLD-Framing/Rough-in | 4/1/2008 | 4/2/2008 | 4/2/2008 | A | PART |
Mike Jordan
|
|
|
tony Phone #: ###-####. interior walls only. No restrooms or hardlid.
|
Print Occupancy Form | | | 3/27/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/27/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/27/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/21/2008 | | 3/26/2008 | | PASS |
Tim L. Woodard
|
|
|
Approved per approved plans, Redlines, and Plan review report.
|
Routing - FIRE | 3/26/2008 | | 3/26/2008 | | PASS |
Tim L. Woodard
|
|
|
Scott was at training. His last corrections were to remove surface mounted bolting and use key locking hardware on front entry door. Per architects approval I redlined the plans to meet his requirements and attached his fire review as refference to plans. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/26/2008 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/26/2008 | | DONE |
Tim L. Woodard
|
|
|
After conducting a site visit it became obvious that my corrections in regards to the connection to the mall bulkhead had no basis. The furthest most wall to the mall bulkhead was going to miss the bulkhead by 4 inches min. Redlines were made to the plans to reflect this.
|
Plan assigned to (TLW) | 2/12/2008 | | 3/26/2008 | | PASS |
Tim L. Woodard
|
|
|
3/26/2008 16:36:30 TLW - activity updated through activity BLDA022 from case BLD08-00165.
|
Routing - PLAN CHECK | 3/4/2008 | | 3/21/2008 | | FAIL |
Tim L. Woodard
|
|
|
Resubmittals do not address all corrections.
|
Routing - FIRE | 3/21/2008 | | 3/21/2008 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
Plan resubmittals received | | | 3/18/2008 | | DONE |
|
|
|
received1 letter of transmittal,1 letter to Tim W. and 1 letter to Scott A. and 2 copies of sheets CS.0.1,A.0.1,A.0.1A,A.1.5,A.1.5A,A1.9,A.1.10,F.0.1,M.0.1,P.0.1 taken to Tim W.
|
Routing - FIRE | 3/3/2008 | | 3/4/2008 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
1st review completed | | | 3/4/2008 | | FAIL |
|
|
|
Failed Plan Check, Fire
|
Routing - PLAN CHECK | 2/12/2008 | | 3/3/2008 | | FAIL |
Tim L. Woodard
|
|
|
Corrections noted on plan review report.
|
Routing - PUBLIC WORKS | 2/12/2008 | | 2/12/2008 | | PASS |
Beverly Hall
|
|
|
|
Pending Assignment by MYS | 1/30/2008 | | 2/12/2008 | | DONE |
Marlene Southard
|
|
|
2/12/2008 07:58:30 MYS - activity updated through activity BLDA185 from case BLD08-00165.
|
Routing PW Sewer Rating | 2/12/2008 | | 2/12/2008 | | PASS |
Louise Waldorf
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/30/2008 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/30/2008 | | DONE |
|
|
|
|
Application received | | | 1/29/2008 | | |
Tisha Gallop
|
|
|
|