Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD08-00169
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 1655 S VINNELL ST
Project NameSarah Care
Customer Number 
ePlanReviewNo
Description
(SARAH CARE) To build-out a 5,250 sq. ft. SHELL & Core building for use as an I-4 adult care facility which provides accommodations for less than 24 hours for more than five unrelated adults per approved plans and DRH07-00412, CAA07-00185 and CAR07-00066. This building is to be fully fire sprinklered per the I-4 occupancy requirements and system installed under separate permit for compliance with NFPA #13. Shell building constructed under BLD07-02677. Work includes new interior non-bearing walls to create offices, work center, arts / crafts area, two dining areas, a multi-purpose area, reception/waiting, beauty salon, catered kitchen serving area per CDHD report attached, nurse's room, library, lounge and covered exterior patio; upgrade of electrical, mechanical and plumbing, all per reviewed plans, red-lined notes there on and all attached plan review comments of all reviewing agencies. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/22/200812/22/20083/12/2009 DONE
DetailsAlexandra L. DeYoung
Second Notice has not been responded to.
Second Notice BLD9/22/20089/22/200812/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 8/12/20089/22/2008 DONE
Permanent Occupancy  8/12/2008 DONE
BLD-Final7/30/20087/31/20087/31/2008APASS
DetailsMike Jordan
zack Phone #: ###-####. All issues resolved. ok for perm occ. no card to sign.
BLD-Final5/30/20085/30/20085/30/2008PPART
DetailsMike Jordan
Keith Phone #: ###-####. Temp occ. granted. Still needs to install grab bars and lower seat in ada shower.
BLD-Final5/29/20085/30/20085/30/2008AFAIL
DetailsMike Jordan
Keith, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt.. Needs to remove locking hardware at main enterance, not allowed on I4 occ.
Temporary Occupancy5/30/20088/28/20085/30/2008 DONE
DetailsCathy Weisshaupt
FIRE-Final Inspection5/28/20085/29/20085/29/2008PPASS
DetailsTroy Cobbley
Fire life safety completed. KR
FIRE-Alarm Testing5/28/20085/29/20085/29/2008PPASS
DetailsTroy Cobbley
Fire life safety completed. See fir08-00098 for alarm testing. KR
FIRE-Final Inspection5/27/20085/28/20085/28/2008AFAIL
DetailsTroy Cobbley
Life safety completed . Can not final until sprinkler flow switch is repaired. KR
BLD-Energy code compliance3/31/20083/31/20083/31/2008PPASS
DetailsMike Jordan
keith Phone #: ###-####
BLD-Framing/Rough-in3/31/20083/31/20083/31/2008PPASS
DetailsMike Jordan
keith Phone #: ###-####. All issues resolved. ok to insul.
BLD-Framing/Rough-in3/28/20083/28/20083/28/2008PFAIL
DetailsMike Jordan
Keith; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in3/25/20083/26/20083/26/2008AFAIL
DetailsMike Jordan
keith Phone #: ###-####. Still needs plumbing and fire insp. No approved plans.
OVERRIDE  3/20/2008  
OVERRIDE  3/20/2008  
OVERRIDE  3/20/2008  
Telephone call  3/20/2008  
faxed copy of fees & called wes steele at ###-#### that permit is ready & need achd
Permit Ready to Issue  3/20/2008  
Issue PAID IN FULL permit  3/20/2008 DONE
Plan assigned to (DRS)2/12/2008 3/19/2008 PASS
DetailsDan Stuart
3/19/2008 11:47:36 DRS - activity updated through activity BLDA022 from case BLD08-00169.
Routing - PLUMBING3/18/2008 3/19/2008 PASS
DetailsBill VanDegrift
verify thermol expantion protection sizing prior to final. provide a floor sink for the kitchen sink and dishwasher.
Routing - PLAN CHECK3/19/2008 3/19/2008 PASS
DetailsDan Stuart
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  3/19/2008 PASS
Print Occupancy Form  3/19/2008 DONE
Routing - PLAN CHECK3/7/2008 3/18/2008 PEND
DetailsDan Stuart
Plans routing to plumbing for review.
Plan resubmittals received  3/18/2008 DONE
received 1 explanation sheet,1 letter,1 menu sheet,1 approval sheet from Central District Health, and 2 copies of sheets 1,3,5,SN sent to Dan S.
Routing - FIRE3/6/2008 3/7/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  3/7/2008 FAIL
Failed Plan Check
Plan resubmittals requested  3/6/2008 DONE
Faxed copy to architect.
Routing - PLAN CHECK2/12/2008 3/6/2008 FAIL
DetailsDan Stuart
Plan review faxed to Wes Steele with copy to Travis Burrows, Dave Evans Const. Routing to fire code analyst.
Routing - PLANNING2/12/2008 2/12/2008 PASS
DetailsAndrea Tuning
Andrea Tuning - Approved per DRH07-00412 & CAA07-00185 & CAR07-00066
Routing - PUBLIC WORKS2/12/2008 2/12/2008 PASS
DetailsBeverly Hall
Pending Assignment by MYS2/6/2008 2/12/2008 DONE
DetailsMarlene Southard
2/12/2008 10:32:49 MYS - activity updated through activity BLDA168 from case BLD08-00169.
Routing PW Sewer Rating2/12/2008 2/12/2008 PASS
DetailsLouise Waldorf
Plans ACCEPTED BY PLAN TECH  2/6/2008  
got CDHD stamp/sign on plans
Recd Pcfee & Taken To Pln CK  2/6/2008 DONE
Application received  1/29/2008  
need CDHD sign/stamp prior to processing plans for review