Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD08-00174
StatusFinaled
Name INTERMOUNTAIN PROPERTY DEVELOPMENT
Site Address 3705 W CATALPA DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This permit is for the construction of a 2163 sq. ft. 2 story townhouse with an attached garage and 173 sq. ft. of covered patio and porch area. The constructioin of the dwelling unit separation wall is designed to meet Townhouse Construction. This lot is located in a floodplain area. An elevation certificate is required to be submitted and approved by Jim Wylie, Public Works Department, prior to calling for a framing inspection. R-1C zoning, DRH07-566 and setbacks pe Matt Halitski. CDM***Nonstructural modifications made to the front of the building including the removal of some brick, replacing it with stucco. No need to re-issue permit. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/11/200812/11/200812/11/2008PPASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
DOC - Permit Finaled12/11/200812/11/200812/11/2008PPASS
DetailsTony Young
Zoning Approval12/11/200812/11/200812/11/2008 PASS
DetailsSarah Schafer
Approved per Hal Simmons and Sarah Schafer.
BLD-Final12/9/200812/9/200812/9/2008PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
ok after zoning final
BLD-Framing/Rough-in9/5/20089/8/20089/8/2008APASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
BLD-Framing/Rough-in9/4/20089/5/20089/5/2008APART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
ok to insulate,, see Dan for small correction
BLD-Framing/Rough-in8/12/20088/12/20088/13/2008PNR
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
BLD-Conference8/8/20088/11/20088/11/2008APART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
extensive walk through w/ builder and frame contractor
BLD-Framing/Rough-in8/6/20088/6/20088/6/2008PPASS
DetailsTony Young
fire wall Phone #: ###-#### Internet Inspection Request from: Jessica Noland
upper overbuild ok
BLD-Framing/Rough-in7/24/20087/24/20087/24/2008PPASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
BLD-Framing/Rough-in7/23/20087/23/20087/23/2008PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
verified nailing on some prebuilt firewalls
BLD-Framing/Rough-in7/21/20087/23/20087/23/2008ANR
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
BLD-Conference7/21/20087/22/20087/22/2008APART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
reviewed plans on town house int. wall
BLD-Foundation6/25/20086/26/20086/26/2008PPASS
DetailsTom Arcoraci
rebar inspection; no special insepctor on site; request boise city inspector to sign card after inspection complete Internet Inspection Request from: Jessica Noland
BLD-Footing6/19/20086/19/20086/20/2008PPART
DetailsTony Young
rebar inspection - NO SPECIAL INSPECTOR ON SITE; pouring on Friday AM Phone #: ###-#### Internet Inspection Request from: Jessica Noland
ok pending as builts for front set back of 15'7"+-
BLD-Footing6/18/20086/19/20086/19/2008ANR
DetailsTony Young
rebar inspection - NO SPECIAL INSPECTOR ON SITE; pouring on Friday AM Phone #: ###-#### Internet Inspection Request from: Jessica Noland
Plan assigned to (CDM)5/2/20085/2/20086/10/2008 DONE
DetailsCarl D Madsen
per Carl Madsen route to him
Routing - PLANNING5/5/2008 6/10/2008 PASS
DetailsMatthew A Halitsky
Routed to Plan Check.
Routing - PLAN CHECK6/10/2008 6/10/2008 PASS
DetailsCarl D Madsen
Carl M.
Case Summary (BLD)  6/10/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/10/2008  
Permit Ready to Issue  6/10/2008  
CHANGE STATUS TO (ISS)  6/10/2008 DONE
DetailsBarbara Stitt
Change status
(F) Reprint permit  6/10/2008 DONE
Plan resubmittals received  5/2/2008  
per Carl Madsen do as a resubmittal---received "3" sets of plans including each sheet of A1.O,A1.1, A5.O, A5.1, A6.O, A6.1, & A7.O-- plans taken to Carl Madsen
Issue PAID IN FULL permit  3/31/2008 DONE
Inspection Record Card- Bld  3/26/2008 DONE
Telephone call  3/26/2008 DONE
t/c w curtis at ###-#### - permit ready and fees given - also need r/p name
Permit Ready to Issue  3/26/2008 DONE
Plan assigned to (CDM)2/27/20082/27/20083/25/2008 DONE
DetailsCarl D Madsen
Case Summary (BLD)  3/25/2008 DONE
Routing - PLAN CHECK3/25/2008 3/25/2008 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  3/25/2008 DONE
Pending Assignment by SRZ1/29/2008 2/27/2008 DONE
DetailsCarl D Madsen
Routing PW Flood Plain2/19/2008 2/19/2008 PASS
DetailsJim Wyllie
Routing - PUBLIC WORKS2/19/2008 2/19/2008 PASS
DetailsLouise Waldorf
Routing - PUBLIC WORKS2/5/2008 2/7/2008 FAIL
DetailsLouise Waldorf
Routing PW Flood Plain2/5/2008 2/7/2008 FAIL
DetailsJim Wyllie
Elevation Certificate not provided. Elevation Certificate must document compliance with Boise City Floodplain Ordinance. If there are questions, contact Jim Wyllie at ###-####.
Routing PW Sewer Rating2/5/2008 2/5/2008 PASS
DetailsLouise Waldorf
Routing - PLANNING1/30/2008 2/5/2008 PASS
DetailsMatthew A Halitsky
Routed to Cody Riddle (CUP05-00033)

Routed to Public Works 2/5/2008
Routing - Addressing1/29/2008 1/30/2008 PASS
DetailsApril Wing
Application received  1/29/2008  
Routing - PLAN CHECK2/7/2008   FAIL
Routing - PLAN CHECK2/19/2008   FAIL
Resubmittals required on the fire wall details also need a fire rated assembly #
Called Curtis Crystal at Modus and left message about corrections and faxed correction list to Modus
Plans in my office CDM