**(THINGS REMEMBERED)** - (BOISE TOWNE SQUARE -SPACE #2172) To remodel an existing 1,334 square foot retail tenant space for new tenant per approved plans. Work to include: [installation of new non-combustible interior partition wall to create a stock area at the back of the space], installation of new flooring throughout, construction of a new storefront system and installation of roll up security grill, installation of suspended ceiling system and related lighting, installation of new mechanical system, miscellaneous related interior finishes. This building is fully fire sprinklerd any alterations to the sprinkler system shall be maintained per NFPA #13 as regulated by the fire department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 4/24/20088/11/2008 DONE
Permanent Occupancy UNPAID FEE  4/24/2008 DONE
DetailsCathy Weisshaupt
BLD-Final4/17/20084/18/20084/18/2008APASS
DetailsJim Sly
floyd Phone #: ###-####
OK for Perm Occ :)
FIRE-Final Inspection4/14/20084/17/20084/17/2008APASS
DetailsTroy Cobbley
fire life safety passed
BLD-Framing/Rough-in3/27/20083/28/20083/28/2008APASS
DetailsMike Jordan
floyd Note: ceiling Phone #: 1-###-####
BLD-Framing/Rough-in3/12/20083/13/20083/13/2008PPART
DetailsMike Jordan
###-#### FloydAll interior framed walls and store front ok. Contractor to provide engineering showing that existing joist and roof structure will support additional load placed.
BLD-Framing/Rough-in3/12/20083/13/20083/13/2008ACANC
DetailsMike Jordan
floyd Phone #: ###-####. Moved to PM.
Issue PAID IN FULL permit  3/3/2008 DONE
Routing - FIRE2/21/2008 2/27/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan assigned to (TLW)2/12/2008 2/27/2008 PASS
DetailsTim L. Woodard
2/27/2008 11:24:48 TLW - activity updated through activity BLDA022 from case BLD08-00179.
1st review completed  2/27/2008 PASS
Routing - PLAN CHECK2/27/2008 2/27/2008 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  2/27/2008 DONE
Print Occupancy Form  2/27/2008 DONE
Telephone call  2/27/2008 DONE
left vm for tim schenk - ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  2/27/2008 DONE
Routing - PLAN CHECK2/13/2008 2/21/2008 PASS
DetailsTim L. Woodard
Passed per redlines on plans and plan review report attached.
Routing - PUBLIC WORKS2/12/2008 2/13/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating2/12/2008 2/12/2008 PASS
DetailsLouise Waldorf
Pending Assignment by MYS1/31/2008 2/12/2008 DONE
DetailsMarlene Southard
2/12/2008 11:46:03 MYS - activity updated through activity BLDA185 from case BLD08-00179.
Application received  1/31/2008  
Plans ACCEPTED BY PLAN TECH  1/31/2008  
Recd Pcfee & Taken To Pln CK  1/31/2008 DONE
Third Notice BLD9/22/20089/22/2008   
Second Notice has not been responded to.