Second Notice BLD | 9/22/2008 | 9/22/2008 | 9/25/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/29/2008 | 9/22/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/29/2008 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/19/2008 | 8/20/2008 | 8/20/2008 | A | PASS |
Jim Sly
|
|
|
toby Phone #: ###-#### OK for Perm OCC.
|
FIRE-Final Inspection | 8/15/2008 | 8/18/2008 | 8/19/2008 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 8/15/2008 | 8/18/2008 | 8/18/2008 | A | DONE |
Jim Sly
|
|
|
Barb-Jim & Troy-This is on my list of coming due to expire occupancy-could you please check on it and let me know-also let GC know 7 days till expire.Thanks Phone #: ###-#### I called Toby Norton and explained......He said he would call in final inspections......
|
Telephone call | | | 7/23/2008 | | DONE |
|
|
|
I called Toby Norton, ###-####x338 re status of outstanding work; TOC now at 60 days. Not available, left voice mail to call me with update on progress to date.
|
BLD-Final | 5/27/2008 | 5/27/2008 | 5/27/2008 | P | PART |
Jim Sly
|
|
|
OK for Temp Occ.
|
FIRE-Final Inspection | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | PART |
Forrest France
|
|
|
Site visit performed by S. Rogers. Acceptable for TOC. Maglocks on doors were approved by Mark Senteno, Asst. FM, to not have motion detection release, however, the required manual push button release does not maintain the doors unlocked for the required minimum 30 seconds (Ref IFC 1008.1.3.4 item 3). It relocks immediately upon release of the push button. For Temp Occy approval, the mag lock circuit was electrically bypassed (dedicated circuit breaker tripped, within the locked electrical panel). The P&R contact, Toby, indicated Parks will manually lock and unlock the doors each day, as they currently do at many other facilities, until they get the required timer installed and field approved by PDS/Fire. All other Fire/Life Safety items were satisfactory. SLR.
|
Temporary Occupancy | 5/23/2008 | 8/21/2008 | 5/23/2008 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 5/21/2008 | 5/22/2008 | 5/22/2008 | P | NR |
Jim Sly
|
|
|
toby Note: please call 1/2 hr prior to inspection Phone #: ###-#### OK for perm occ.......when Fire signs for Perm Occ.
|
FIRE-Final Inspection | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | CANC |
Troy Cobbley
|
|
|
Could not get power to building to test mag locks.
|
FIRE-Final Inspection | 5/21/2008 | 5/21/2008 | 5/21/2008 | P | FAIL |
Troy Cobbley
|
|
|
I left two messages and received no responce. There was no access to the restrooms.
|
BLD-Final | 5/21/2008 | 5/21/2008 | 5/21/2008 | P | CANC |
Jim Sly
|
|
|
Cheyne; Phone #: ###-#### x309 Internet Inspection Request from: Cathy Weisshaupt
|
Issue & PRINT to be Invoiced | | | 3/20/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/4/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/4/2008 | | DONE |
|
|
|
t/c w toby norton at ###-#### x 338 - permit ready and fees given - also need gc name, rce# and ACHD receipt
|
Permit Ready to Issue | | | 3/4/2008 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 2/4/2008 | | 3/4/2008 | | PASS |
Sam Zahorka
|
|
|
3/4/2008 10:29:02 SRZ - activity updated through activity BLDA022 from case BLD08-00193.
|
Routing - PLAN CHECK | 2/29/2008 | | 3/3/2008 | | PASS |
Sam Zahorka
|
|
|
Pending letter from Applicant waiving door sensor requirements. SRZ
|
Routing - FIRE | 2/29/2008 | | 3/3/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans. *3/3/08* Written approval required by Boise City Fire Marshal regarding occupancy sensor for electromagnetic locking mechanismns on bathroom doors. *3/3/08* Plans have been approved without occupancy sensor; per assistant fire marshal Mark Senteno.
|
Routing - FIRE | 2/27/2008 | | 2/28/2008 | | FAIL |
Scott Arellano
|
|
|
Telephoned owner/applicant regarding resubmittal items and /or signed written approval from Fire Marshal. Faxed resubmittal items to appllicant.
|
1st review completed | | | 2/28/2008 | | FAIL |
|
|
|
Failed planning and Fire
|
Case Summary (BLD) | | | 2/27/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/6/2008 | | 2/27/2008 | | PASS |
Sam Zahorka
|
|
|
Pending others to pass.
|
Routing - PLANNING | 2/6/2008 | | 2/6/2008 | | FAIL |
Sarah Schafer
|
|
|
The site is actually zoned R-1C not A-1. In the R-1C zone parks require a conditional use permit prior to construction. In speaking with Cody Riddle, we will process a conditional use permit modification at staff level for this application. I spoke with Toby Norton at Parks. He will get the modification application in while we keep the plans routing.
|
Routing - PLUMBING | 2/5/2008 | | 2/6/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc grading under bld07-02906
|
Routing PW Sewer Rating | 2/5/2008 | | 2/5/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - Erosion and Sediment | 2/5/2008 | | 2/5/2008 | | PASS |
Steven Webb
|
|
|
ESC07-01403
|
Routing - PUBLIC WORKS | 2/4/2008 | | 2/5/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing - PLANNING Land Div | 2/4/2008 | | 2/4/2008 | | PASS |
Dave Abo
|
|
|
City park is 5.00 acres in size.
|
Plans ACCEPTED BY PLAN TECH | | | 2/4/2008 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/4/2008 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/4/2008 | | DONE |
|
|
|
|
Pending Assignment by MYS | 2/1/2008 | | 2/4/2008 | | DONE |
John Menard
|
|
|
2/4/2008 08:36:41 JCM - activity updated through activity BLDA160 from case BLD08-00193.
|
Application received | | | 2/1/2008 | | |
|
|
|
|