Third Notice BLD | 12/22/2008 | 12/22/2008 | 3/12/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 11/7/2008 | 11/7/2008 | 12/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 9/17/2008 | 9/17/2008 | 11/7/2008 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 9/16/2008 | 9/16/2008 | 9/17/2008 | P | PASS |
Dave Hannah
|
|
|
jay Phone #: ###-####
|
DOC - Permit Finaled | 9/17/2008 | 9/17/2008 | 9/17/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 7/28/2008 | 7/29/2008 | 7/29/2008 | A | FAIL |
Jim Sly
|
|
|
jay Phone #: ###-#### Checked draftstops in 2 areas.......Many holes etc.
|
FIRE-Final Inspection | 7/21/2008 | 7/22/2008 | 7/23/2008 | A | PASS |
Forrest France
|
|
|
Noted corrections are complete, fire life safety passed.
|
FIRE-Final Inspection | 6/30/2008 | 7/1/2008 | 7/1/2008 | A | FAIL |
Forrest France
|
|
|
Missing ceiling tile at several locations, need to repair one exit sign, one PFE is overdue annual certification at the server room, need to verify door mag locks drop out on fire alarm and power loss, not all items reviewed at this time, discussed subsequent permits for future remodel work.
|
FIRE-Final Inspection | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | FAIL |
Forrest France
|
|
|
The project related fire alarm permit is not in the "issued" status-plans need to be picked up, permit paid and work completed prior to field inspection request and finished previous to building life safety inspection and final approval. Notified contractor of the situation.
|
BLD-Final | 6/24/2008 | 6/25/2008 | 6/25/2008 | A | NR |
Dave Hannah
|
|
|
jay Phone #: ###-#### needs other trades to final
|
BLD-Framing/Rough-in | 5/30/2008 | 6/3/2008 | 6/3/2008 | A | PART |
Dave Hannah
|
|
|
jay - ceiling cover Phone #: ###-####ok to cover need to check draft stops
|
Plan resubmittals received | | | 4/30/2008 | | |
|
|
|
Received revised supplemental plans; put in Dave Hannah's box.
|
Plan resubmittals received | | | 4/29/2008 | | |
|
|
|
received supplemental plans; put in Dave Hannah's box
|
BLD-Framing/Rough-in | 4/25/2008 | 4/28/2008 | 4/28/2008 | A | PASS |
Dave Hannah
|
|
|
jay Phone #: ###-#### ok to cover int walls
|
BLD-Framing/Rough-in | 4/17/2008 | 4/21/2008 | 4/21/2008 | P | PART |
Dave Hannah
|
|
|
jay Phone #: ###-#### ok to one side walls
|
Case Summary (BLD) | | | 3/25/2008 | | |
|
|
|
|
Issue & PRINT to be Invoiced | | | 2/15/2008 | | |
|
|
|
|
Plan assigned to (R_H) | 2/4/2008 | | 2/14/2008 | | PASS |
Ron Hill
|
|
|
2/14/2008 06:38:34 RMH - activity updated through activity BLDA022 from case BLD08-00197.
|
Routing - PLAN CHECK | 2/13/2008 | | 2/14/2008 | | PASS |
Ron Hill
|
|
|
|
1st review completed | | | 2/14/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/14/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/14/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/14/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/14/2008 | | DONE |
|
|
|
t/c w curtis at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 2/14/2008 | | DONE |
|
|
|
|
Routing - FIRE | 2/13/2008 | | 2/13/2008 | | PASS |
Ron Hill
|
|
|
|
Application received | | | 2/4/2008 | | |
|
|
|
|
(F) Reprint permit | | | 2/4/2008 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/4/2008 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/4/2008 | | DONE |
|
|
|
|