Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD08-00205
StatusFinaled
Name COLLIERS INTERNATIONAL
Site Address 473 S CAPITOL BLVD
Project NameBODO BLDG #8
Customer Number 
ePlanReviewNo
Description
(VANILLA FINISH - BODO BLDG #8 - 1ST STORY) This building is fire sprinklered because it is a high-rise building. To create a 747 square foot retail sales / office tenant space on the 1st story of an 11 story high-rise building. Egress is directly to the outside at grade. Work is to include: interior gypsum wall finish, new lighting fixtures, new entry storefront, new H-VAC ducts, diffusers, and suspended ceilings. Items such as accessible restrooms, drinking fountains, etc. will be addressed on occupancy permit. The work is required to comply with the approved drawings, the plan review report, and all applicable codes. No certificate of occupancy is allowed under this permit. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/29/20091/29/20094/3/2009 DONE
DetailsAlexandra L. DeYoung
Second Notice has not been responded to.
Second Notice BLD1/2/20091/2/20091/29/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice12/3/200812/3/20081/2/2009 DONE
DetailsDave Hannah
BLD-Final12/2/200812/3/200812/3/2008PPASS
DetailsDave Hannah
richard Note: please call 1/2 hr prior to inspection Phone #: ###-####
DOC - Permit Finaled12/3/200812/3/200812/3/2008PPASS
DetailsDave Hannah
FIRE-Final Inspection12/2/200812/3/200812/3/2008APASS
DetailsForrest France
Vanilla permit fire life safety is satisfactory, foil at one upright fire sprinkler head to be removed promptly per contractor.
Letter of compliance  12/3/2008 DONE
DetailsAlexandra L. DeYoung
BLD-Conference4/17/20084/17/20084/18/2008PPART
DetailsDave Hannah
rob - please call 1/2 hr prior to inspection Phone #: ###-#### talked about 2hr wall along parking garage
BLD-Framing/Rough-in4/15/20084/16/20084/16/2008AFAIL
DetailsDave Hannah
Rich; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt no plans on site need to check 2hr walls that seperate garage
Issue PAID IN FULL permit  4/9/2008 DONE
Inspection Record Card- Bld  3/5/2008 DONE
Telephone call  3/5/2008 DONE
left vm for matt rhees at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  3/5/2008 DONE
Routing - PLAN CHECK3/3/2008 3/4/2008 PASS
DetailsTim L. Woodard
Plans approved per redlines on plans.
PLANS/APPL TAKEN TO FRONT DESK  3/4/2008 DONE
DetailsTim L. Woodard
Case Summary (BLD)  3/4/2008 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)2/28/2008 3/4/2008 DONE
DetailsTim L. Woodard
Reassigned to Tim by MSouthard on 2/28/08.
1st review completed  3/3/2008 PASS
Routing - FIRE2/28/2008 3/3/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan assigned to (JCM)2/15/2008 2/28/2008 ----
DetailsMarlene Southard
Reassigned to Tim by MSouthard on 2/28/08.
Routing - PLAN CHECK2/19/2008 2/28/2008 PASS
DetailsTim L. Woodard
Routing - PUBLIC WORKS2/15/2008 2/19/2008 PASS
DetailsBeverly Hall
Pending Assignment by MYS2/5/2008 2/15/2008 DONE
DetailsMarlene Southard
2/15/2008 09:49:27 MYS - activity updated through activity BLDA166 from case BLD08-00205.
Routing PW Sewer Rating2/15/2008 2/15/2008 PASS
DetailsLouise Waldorf
Recd Pcfee & Taken To Pln CK  2/5/2008 DONE
Plans ACCEPTED BY PLAN TECH  2/5/2008  
Application received  2/5/2008