Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD08-00213
StatusVoid/No Violation
Name THE STUDIO CORP
Site Address 528 S AMERICANA BLVD
Project Name 
Customer Number 
ePlanReviewNo
Description
(THE STUDIO CORP.) This building is NOT fire sprinklered. To remodel the interior of an existing 9,538 square foot tenant space. Photography studios, storage rooms, and offices will be created. A 1-hr fire-resistance-rated exit vestibule (1-hr walls, 1-hr ceiling, 45 minute door) will be created at the back alley. A portion of the alley wall will be removed and a portion of the existing concrete floor slab will be removed. Where the concrete slab is removed, a new concrete floor slab will be placed 7 inches below the rest of the floor level. Work is to include interior nonbearing walls, interior doors, upgrades to a 3-hr fire-resistance property line wall (i.e. party wall), hallways, minor accessible upgrades to an existing restroom, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  9/14/2009 DONE
Drawings discarded
VOIDED CHANGE STATUS  5/28/2009 DONE
DetailsTisha Gallop
void permit per architect Matt Rhees per this tenant is not moving in
BLD-Aging Inspection11/12/200811/12/200811/13/2008 PART
DetailsDave Hannah
exps 02/09/09
Issue PAID IN FULL permit  8/13/2008 DONE
Telephone call  8/6/2008 DONE
Details
t/c w john price at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  8/6/2008 DONE
Details
Routing - PLAN CHECK8/5/2008 8/5/2008 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  8/5/2008 DONE
Print Occupancy Form  8/5/2008 DONE
Plan assigned to (CJW)2/19/2008 8/5/2008 PASS
DetailsCarl Westfall
8/5/2008 14:51:06 CJW - activity updated through activity BLDA022 from case BLD08-00213.
Routing - PLANNING8/4/2008 8/5/2008 PASS
DetailsSarah Schafer
Gave to Sarah. Approved for minor exterior changes.
Routing - FIRE8/1/20088/1/20088/4/2008 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Route to Impact Fee Review8/1/20088/6/20088/1/2008 PASS
DetailsCindy M. Gould
Tenant improvements no fees
Routing - PLAN CHECK3/21/2008 8/1/2008 PASS
DetailsCarl Westfall
(6-24-08) Completed the 1st resubmittal review. Revised drawings requried. (7-10-08) Completed the 2nd resubmittal review. Revised drawings are required. Called the Architect and followed up with an E-mail. (7-23-08) Looked at the resubmittal. Cannot validate that the alley has been vacated. Called the Architect and left a message. (8-1-08) Approved the drawings, with "red lines" after the 4th resubmittal review.
Plan resubmittals received  7/28/2008  
received project letter from the arch office & "2" sheets each of A1.O --took plans to Carl Westfall
Plan resubmittals received  7/18/2008  
DetailsCarl Westfall
Received project letter, "Vacation of Public Right-Of-Way", 8 1/2" x 11" site picture, and two copies of sheet A1.0; taken to Carl Westfall
Plan resubmittals received  7/8/2008  
received project letter from the architects office (2) pages, & "2" sheets each of A1.O-- plans taken to Carl Westfall
Plan resubmittals received  6/16/2008  
received comments sheet from the architects office (3) pages & "2" sets of plans with each sheet AO.O, A1.O, & A2.O --plans taken to Carl Westfall
Route to Impact Fee Review5/13/20085/16/20085/15/2008 PASS
DetailsCindy M. Gould
No fees tenet improvement
Routing - FIRE3/19/20083/19/20083/21/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  3/21/2008 FAIL
Failed Plan Check, Fire
Routing - PLAN CHECK2/20/2008 3/19/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on March 18, 2008 and was finished the next day. Revised drawings were required. See the plan review report.
Routing PW Sewer Rating2/20/2008 2/20/2008 PASS
DetailsLouise Waldorf
Routing - PUBLIC WORKS2/19/2008 2/20/2008 PASS
DetailsBeverly Hall
Pending Assignment by MYS2/5/2008 2/19/2008 DONE
DetailsMarlene Southard
2/19/2008 16:12:08 MYS - activity updated through activity BLDA172 from case BLD08-00213.
Plans ACCEPTED BY PLAN TECH  2/6/2008  
Recd Pcfee & Taken To Pln CK  2/5/2008  
Application received  2/5/2008