BLD-Aging Inspection | 2/18/2010 | 2/18/2010 | 2/25/2010 | | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 2/25/2010 | 2/25/2010 | 2/25/2010 | A | PASS |
Tony Young
|
|
|
|
BLD-Final | 5/20/2009 | 5/22/2009 | 5/22/2009 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
|
Zoning Approval | 5/22/2009 | 5/22/2009 | 5/22/2009 | | DONE |
Sarah Schafer
|
|
|
Meets all of the DR requirements.
|
BLD-Final | 5/20/2009 | 5/20/2009 | 5/20/2009 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jessica Noland conf on final,, need fire caulking in garage area,, need zoning final
|
FIRE-Final Inspection | 5/20/2009 | 5/20/2009 | 5/20/2009 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. The fire alarm system as shown on the approved drawings has not been installed but it is not required either as per the project scope of work. This was discussed with Scott Arlenno.
|
BLD-Final | 4/30/2009 | 5/1/2009 | 4/30/2009 | A | CANC |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jessica Noland Inspection cancelled from web by: Jessica Noland
|
BLD-Other | 4/21/2009 | 4/21/2009 | 4/21/2009 | P | PASS |
Tony Young
|
|
|
ceiling grid inspection Phone #: ###-#### Internet Inspection Request from: Jessica Noland
|
BLD-Conference | 3/31/2009 | 3/31/2009 | 3/31/2009 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
|
BLD-Conference | 3/30/2009 | 3/31/2009 | 3/31/2009 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jessica Noland ducts from garage to office ok,, 26 gauge,, fire caulk around per code
|
BLD-Conference | 3/30/2009 | 3/30/2009 | 3/30/2009 | P | PEND |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jessica Noland need to review firewall ?s w// plan review
|
BLD-Energy code compliance | 3/10/2009 | 3/11/2009 | 3/11/2009 | A | PASS |
Tony Young
|
|
|
Phone #: ###-####
|
BLD-Framing/Rough-in | 3/5/2009 | 3/6/2009 | 3/6/2009 | P | PART |
Jim Sly
|
|
|
need ok to insulate and cover Phone #: ###-#### Internet Inspection Request from: Jessica Noland C/N Repair 5/8 rock removed to allow for continuious roof vent at ridge. Call for insp of 5/8 rock membrane on E. 1hr wall. OK to Insulate.
|
BLD-Framing/Rough-in | 3/4/2009 | 3/5/2009 | 3/5/2009 | A | NR |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jessica Noland Need to post address.....Need Plm R/I approved....Need approved plans ..... Talked to Bldr.....
|
BLD-Framing/Rough-in | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | NR |
Tony Young
|
|
|
Dan Phone #: ###-#### need trades 1st
|
FIRE-Conference | 2/18/2009 | 2/19/2009 | 2/20/2009 | A | DONE |
Troy Cobbley
|
|
|
This was for a conference covering the sprinkler monitoring. It also included flushing the underground sprinkler supply
|
Override - Parcel Holds | | | 2/18/2009 | | |
|
|
|
|
Override - Parcel Holds | | | 2/18/2009 | | |
|
|
|
|
Case Summary (BLD) | | | 1/28/2009 | | DONE |
|
|
|
|
Elevation Cert Rec'd-Final | | | 1/27/2009 | | DONE |
|
|
|
Received Elevation Certificate documenting compliance with Floodplain Ordinance. Okay to schedule framing inspection. Jim Wyllie / ###-####
|
BLD-Framing/Rough-in | 1/14/2009 | 1/15/2009 | 1/15/2009 | A | CANC |
Tony Young
|
|
|
dan Phone #: ###-#### needs eval sheet from Jim Wylie PW first
|
BLD-Framing/Rough-in | 12/30/2008 | 12/31/2008 | 12/31/2008 | A | PASS |
Tony Young
|
|
|
fire wall inspection Phone #: ###-#### Internet Inspection Request from: Jessica Noland firewall ok in between
|
BLD-Concrete | 10/9/2008 | 10/10/2008 | 10/10/2008 | A | PART |
Tony Young
|
|
|
rebar inspection pour concrete AM Phone #: ###-#### Internet Inspection Request from: Jessica Noland rock placement in courtyard,, concrete under rocks
|
BLD-Concrete | 9/26/2008 | 9/29/2008 | 9/29/2008 | P | PASS |
Tony Young
|
|
|
rebar inspection Phone #: ###-#### Internet Inspection Request from: Jessica Noland footings ok,, corners surveyed in
|
Override - Parcel Holds | | | 8/11/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 8/11/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/11/2008 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 8/8/2008 | | DONE |
|
|
|
|
Telephone call | | | 8/8/2008 | | DONE |
|
|
|
t/c w amanda swails at ###-#### x312 - permit ready and fees given
|
Override - Parcel Holds | | | 8/8/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 8/8/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 8/8/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/6/2008 | | 8/7/2008 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2008 | | DONE |
Sam Zahorka
|
|
|
|
Plan assigned to (SRZ) | 4/24/2008 | | 8/7/2008 | | PASS |
Sam Zahorka
|
|
|
8/7/2008 14:16:52 SRZ - activity updated through activity BLDA022 from case BLD08-00224.
|
Case Summary (BLD) | | | 8/6/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/6/2008 | | |
Sam Zahorka
|
|
|
Received response letter, wall detail, Res Check, two copies of sheets A3.0, A3.2, A6.1; inserted by arch. rep. and taken back to Sam Zahorka
|
Routing - PLAN CHECK | 7/29/2008 | | 8/6/2008 | | FAIL |
Sam Zahorka
|
|
|
Sent 2nd correction letter. Pending resubmittals.
|
Plan resubmittals received | | | 8/4/2008 | | |
Sam Zahorka
|
|
|
Received transmittal, response letter and two copies of sheets A0.0, A0.1, A1.0, A1.1, A3.0, A3.1, A3.2, A5.0, A5.1, A6.0, A6.1, A7.0, A8.0, A8.1, A9.0, A10.0, S0.1, S4.01, S5.01, E2.1M; inserted by arch. rep. and taken back to Sam Zahorka
|
Route to Impact Fee Review | 7/28/2008 | 7/31/2008 | 7/29/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 7/28/2008 | 7/28/2008 | 7/29/2008 | | PASS |
Kenneth R Roule
|
|
|
See attached IFC fire review notes.
|
Case Summary (BLD) | | | 7/29/2008 | | DONE |
Sam Zahorka
|
|
|
|
1st review completed | | | 7/29/2008 | | FAIL |
|
|
|
Failed, Public works, Planning, Flood Plain and Plan check
|
Routing - PLAN CHECK | 7/15/2008 | | 7/28/2008 | | FAIL |
Sam Zahorka
|
|
|
Emailed Plan review report and corrections to the Architect and applicant. (SRZ)
|
Case Summary (BLD) | | | 7/28/2008 | | DONE |
Sam Zahorka
|
|
|
|
Meeting | | | 7/28/2008 | | DONE |
Sam Zahorka
|
|
|
Meeting wtih George Slain, Boise cities Building Official, about the alternate agreement for this project. He has decided and stated the dwelling units are to comply with the 2006 IRC as R-3 occupancies. The non-residential areas are to comply with the IBC 2007 Supplement section 419 as R-2 occupancies and a NFPA 13D automatic sprinkler system throughout the live/work unit is required.
|
Telephone call | | | 7/28/2008 | | DONE |
Sam Zahorka
|
|
|
Called the Architect and Dave Mckinnon and advised them about the building officials desicion on how to review the live work units. He has agreed to review the dwelling units as R-3 occupancies under the 2006 IRC and the non-dwelling areas per the IBC 2007 Supplement.
|
Meeting | | | 7/23/2008 | | DONE |
Sam Zahorka
|
|
|
Meeting requested by Plan review to meet with the architect and applicant to talk about the Design and the alternate agreements. Plan review offered possible solutions and asked the architect to resubmit a letter to clarify his Alternate agreement. The design (as is) does not comply with means of egress per section 419 of the 2007 supplement. (SRZ)
|
Plan resubmittals received | | | 7/15/2008 | | |
|
|
|
Received 4 copies of sheet A6.1 and inserted into plans by Modus Architects///7/15/08 @ 11:48am BAS
|
Routing - PUBLIC WORKS | 7/15/2008 | | 7/15/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Flood Plain | 7/15/2008 | | 7/15/2008 | | PASS |
Jim Wyllie
|
|
|
|
Routing PW Flood Plain | 7/8/2008 | | 7/8/2008 | | FAIL |
Jim Wyllie
|
|
|
Show flood vents on building elevation. Jim Wyllie / ###-####
|
Routing PW Flood Plain | 6/19/2008 | | 6/23/2008 | | FAIL |
Jim Wyllie
|
|
|
Building is in a regulatory floodplain. An Elevation Certificate conforming to the City's Floodplain Ordinance must be provided prior to issuance of a building permit. A second Elevation Certificate for the buiding based upon as-built conditions must be received by City prior to Builder request for framing inspection. Jim Wyllie / ###-####
|
Routing - PUBLIC WORKS | 6/19/2008 | | 6/23/2008 | | FAIL |
Louise Waldorf
|
|
|
Plans are so large that they are in office with Carl & Ben waiting re-submittals.
|
Plan resubmittals received | | | 6/19/2008 | | |
Tisha Gallop
|
|
|
Received four copies of sheet A6.0; inserted by arch. and taken plans back to Matt H.
|
Routing - PLANNING | 6/19/2008 | | 6/19/2008 | | PASS |
Matthew A Halitsky
|
|
|
Routed to Public Works.
|
Pending Assignment by SRZ | 2/8/2008 | | 4/24/2008 | | DONE |
Marlene Southard
|
|
|
4/24/2008 11:13:14 MYS - activity updated through activity BLDA160 from case BLD08-00224.
|
Routing - PLANNING | 2/9/2008 | | 2/14/2008 | | FAIL |
Matthew A Halitsky
|
|
|
Drh07-00466 Matt Halitsky, CUP07-00121 Susan Riggs
Conditions of DR approval not met. Email sent 2/13/2008.
Plans in my office.
|
Routing - Addressing | 2/8/2008 | | 2/8/2008 | | PASS |
Chris Pichardo
|
|
|
|
Application received | | | 2/8/2008 | | |
|
|
|
|