Print Occupancy Form | | | 8/5/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/5/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 7/25/2011 | 7/26/2011 | 7/26/2011 | P | PASS |
Tony Young
|
|
|
dan Phone #: ###-####
|
FIRE-Final Inspection | 7/25/2011 | 7/26/2011 | 7/26/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Zoning Approval | 7/26/2011 | 7/26/2011 | 7/26/2011 | | DONE |
Andrea Tuning
|
|
|
All landscaping is complete.
|
BLD-Energy code compliance | 6/17/2011 | 6/20/2011 | 6/20/2011 | A | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####
|
BLD-Framing/Rough-in | 6/16/2011 | 6/17/2011 | 6/17/2011 | A | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####,, seal pack ok,, insulated now,, ok to cover
|
BLD-Framing/Rough-in | 6/16/2011 | 6/16/2011 | 6/16/2011 | P | PART |
Tony Young
|
|
|
dan Phone #: ###-####,, ok to insulate,, verify seal package
|
FIRE-Hydro test above ground | 5/23/2011 | 5/23/2011 | 5/23/2011 | P | PASS |
Troy Cobbley
|
|
|
Todays inspection was for the flushing of the underground supply piping feeding the future fire sprinkler system.
|
Plan Reviewer's activity | | | 5/20/2011 | | DONE |
Tim Frost
|
|
|
Per discussion with myself, Sam and Jayson. This permit has been kept open since 2008 due to aging permits. Therefore, the sprinkler permit will be reviewed under the 2006 IFC. The letter from George Slane of 01-28-2008 would therefore still apply. The sprinkler system per this aggreement will be review to comply with NFPA 13D for both levels.
|
CHANGE STATUS TO (ISS) | | | 5/17/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (SRZ) | 5/13/2011 | 5/13/2011 | 5/16/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/13/2011 | | 5/16/2011 | | PASS |
Sam Zahorka
|
|
|
Plan review for a modification of the previously approved plans.
|
Case Summary (BLD) | | | 5/16/2011 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2011 | | DONE |
Sam Zahorka
|
|
|
|
Permit Ready to Issue | | | 5/16/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 5/16/2011 | | DONE |
Tisha Gallop
|
|
|
e-mailed Dave McKinnon and told him permit is ready and fee.
|
Plan resubmittals received | | | 5/13/2011 | | DONE |
Christina Prado
|
|
|
Received three copies of plan mod application and three sets of second florr plan. Routed to Sam Z for review
|
BLD-Aging Inspection | 3/28/2011 | 3/28/2011 | 3/29/2011 | | PEND |
Tony Young
|
|
|
|
BLD-Wall cover | 1/20/2011 | 1/24/2011 | 1/24/2011 | P | PART |
Jim Sly
|
|
|
Dan Phone #: ###-#### Common walls only......OK
|
BLD-Framing/Rough-in | 1/5/2011 | 1/5/2011 | 1/5/2011 | P | NR |
Jim Storey
|
|
|
dan - partial cover Phone #: ###-####
|
BLD-Aging Inspection | 12/28/2010 | 12/28/2010 | 1/5/2011 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/26/2010 | 10/26/2010 | 10/27/2010 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 8/24/2010 | 8/24/2010 | 8/24/2010 | | PASS |
Tony Young
|
|
|
|
BLD - Request for Extension | 6/21/2010 | 6/22/2010 | 6/22/2010 | A | PASS |
Tony Young
|
|
|
Dave- call prior to going Phone #: ###-####
|
BLD-Aging Inspection | 6/17/2010 | 6/17/2010 | 6/21/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/15/2010 | 4/15/2010 | 4/19/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 2/4/2010 | 2/9/2010 | 2/9/2010 | A | PASS |
Tony Young
|
|
|
ok to keep active
|
BLD-Framing/Rough-in | 5/22/2009 | 5/22/2009 | 5/22/2009 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jessica Noland conf only
|
BLD-Wall cover | 3/24/2009 | 3/25/2009 | 3/25/2009 | A | PASS |
Mike Jordan
|
|
|
need ok to cover exterior (siding) Phone #: ###-#### Internet Inspection Request from: Jessica Noland. shear nailing ok.
|
BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 | A | PART |
Tony Young
|
|
|
ben - ###-#### - party wall ok
|
Override - Parcel Holds | | | 2/10/2009 | | |
|
|
|
|
Elevation Cert Rec'd-Final | | | 1/27/2009 | | DONE |
|
|
|
Received Elevation Certificate dcumenting compliance with Floodplain Ordinance. Okay to schedule framing inspection. Jim Wyllie / ###-####
|
BLD-Concrete | 10/9/2008 | 10/10/2008 | 10/10/2008 | A | PASS |
Tony Young
|
|
|
rebar inspection pouring concrete AM Phone #: ###-#### Internet Inspection Request from: Jessica Noland rebar in walls ok
|
BLD-Concrete | 9/26/2008 | 9/29/2008 | 9/29/2008 | P | PASS |
Tony Young
|
|
|
rebar inspection Phone #: ###-#### Internet Inspection Request from: Jessica Noland footings ok,, corners surveyed in
|
Override - Parcel Holds | | | 8/11/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 8/11/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/11/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/7/2008 | | 8/8/2008 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2008 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 8/8/2008 | | DONE |
|
|
|
|
Telephone call | | | 8/8/2008 | | DONE |
|
|
|
t/c w amanda swails at ###-#### x312 - permit ready and fees given
|
Override - Parcel Holds | | | 8/8/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 8/8/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 8/8/2008 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 4/24/2008 | | 8/8/2008 | | PASS |
Sam Zahorka
|
|
|
8/8/2008 09:38:02 SRZ - activity updated through activity BLDA022 from case BLD08-00227.
|
Routing - PLAN CHECK | 8/4/2008 | | 8/7/2008 | | FAIL |
Sam Zahorka
|
|
|
Emailed 2nd correction to the architect. Pending resubmittals.
|
Case Summary (BLD) | | | 8/7/2008 | | DONE |
|
|
|
|
Routing - FIRE | 8/1/2008 | 8/1/2008 | 8/4/2008 | | PASS |
Kenneth R Roule
|
|
|
See attached IFC plan review notes.
|
1st review completed | | | 8/4/2008 | | FAIL |
|
|
|
Public works, PW flood plain and plan check.
|
Plan resubmittals received | | | 8/4/2008 | | |
Sam Zahorka
|
|
|
Received transmittal, response letter and two copies of sheets A0.0, A0.1, A1.0, A1.1, A3.0, A3.1, A3.2, A5.0, A5.1, A5.2, A6.0, A6.1, A7.0, A7.2, A8.0, A8.1, A9.0, A10.0, S0.1, S4.01, S5.01, E2.1M; inserted by arch. rep. and taken back to Sam Zahorka
|
Route to Impact Fee Review | 8/1/2008 | 8/6/2008 | 8/1/2008 | | PASS |
Cindy M. Gould
|
|
|
Impact fee applied by LEG
|
Routing - PLAN CHECK | 7/15/2008 | | 8/1/2008 | | FAIL |
Sam Zahorka
|
|
|
Emailed correction letter to the architect. Routed to fire.
|
Case Summary (BLD) | | | 8/1/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/1/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/15/2008 | | |
|
|
|
Received 6 copies of sheet A6.1 and inserted into plans by Modus Architects///7/15/08 @ 11:48am BAS
|
Routing - PUBLIC WORKS | 7/15/2008 | | 7/15/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Flood Plain | 7/15/2008 | | 7/15/2008 | | PASS |
Jim Wyllie
|
|
|
|
Routing PW Flood Plain | 7/8/2008 | | 7/8/2008 | | FAIL |
Jim Wyllie
|
|
|
Show flood vents on building elevation. Jim Wyllie / ###-####
|
Routing PW Flood Plain | 6/19/2008 | | 6/23/2008 | | FAIL |
Jim Wyllie
|
|
|
Elevation Certificate shows attached garage below Base Flood Elevation without flood vents. Elevation Certificate needs to be modified to show placement of flood vents as per FEMA Technical Bulletin 1-93. Address shown on Elevation Certificate is not correct. Correct address is 3853 N. Garden Center Way. Jim Wyllie / ###-####
|
Routing - PUBLIC WORKS | 6/18/2008 | | 6/23/2008 | | FAIL |
Louise Waldorf
|
|
|
Plans are so large that they are in office with Carl & Ben waiting re-submittals.
|
Routing - PLANNING | 6/18/2008 | | 6/18/2008 | | PASS |
Matthew A Halitsky
|
|
|
Routed to Public Works
|
Plan resubmittals received | | | 6/12/2008 | | |
|
|
|
Received 6 copies of sheet A6.0 and A6.1 and taken to Matt Halitsky 6-12-08 @ 11:44am BAS
|
Plan resubmittals received | | | 6/9/2008 | | |
Tisha Gallop
|
|
|
Received two copies of sheet LS1.0; taken to Matt H. to insert into plans
|
Pending Assignment by SRZ | 2/8/2008 | | 4/24/2008 | | DONE |
Marlene Southard
|
|
|
4/24/2008 11:14:54 MYS - activity updated through activity BLDA160 from case BLD08-00227.
|
Routing - PLANNING | 2/9/2008 | | 2/14/2008 | | FAIL |
Matthew A Halitsky
|
|
|
Drh07-00466 Matt Halitsky; Cup07-00121 Susan Riggs
Conditions of DR approval not met. Email sent 2/13/2008.
Plans in my office.
|
Routing - Addressing | 2/8/2008 | | 2/8/2008 | | PASS |
Chris Pichardo
|
|
|
|
Application received | | | 2/8/2008 | | |
|
|
|
|
PubWorks Occupancy Approval | 5/22/2009 | 5/22/2009 | | | PASS |
Brian Murphy
|
|
|
ok for perm occupancy per BGM
|