Second Notice | | 7/22/2009 | 7/22/2009 | | DONE |
|
|
|
This permit finaled on the web by Brandon Byington
|
First Notice | | 5/29/2009 | 7/22/2009 | | DONE |
|
|
|
|
First Notice | | 5/29/2009 | 7/22/2009 | | DONE |
|
|
|
|
Zoning Approval | 5/29/2009 | 5/29/2009 | 5/29/2009 | | DONE |
Joshua Johnson
|
|
|
All Design Review and Current Planning Conditions met
|
Permanent Occupancy | | | 5/29/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 5/26/2009 | 5/28/2009 | 5/28/2009 | A | PASS |
Tom Arcoraci
|
|
|
Jan Phone #: ###-#### ok for perm occ
|
BLD-Aging Inspection | 5/20/2009 | 5/20/2009 | 5/20/2009 | | DEFR |
Tom Arcoraci
|
|
|
zoning issue
|
BLD-Conference | 3/18/2009 | 3/18/2009 | 3/18/2009 | A | PASS |
Tom Arcoraci
|
|
|
on temp
|
BLD-Aging Inspection | 3/18/2009 | 3/18/2009 | 3/18/2009 | | PASS |
Tom Arcoraci
|
|
|
|
Temporary Occupancy UNPAID FEE | | | 2/5/2009 | | |
|
|
|
The remaining improvements must be complete for permanent occupancy to be granted.
ANT and JRJ
|
Temporary Occupancy UNPAID FEE | | | 2/5/2009 | | DONE |
|
|
|
|
Zoning Approval Temp | 1/26/2009 | 1/26/2009 | 1/26/2009 | | PASS |
Andrea Tuning
|
|
|
The applicant has posted abond for the remaining improvements. The applicant has been granted temporary occupancy for 90 days. The remaining improvements must be complete for permanent occupancy to be granted.
ANT and JRJ
|
BLD-Final | 1/15/2009 | 1/16/2009 | 1/16/2009 | A | PART |
Tom Arcoraci
|
|
|
jan Note: late morning please Phone #: ###-#### pending zoning sign off
|
FIRE-Final Inspection | 1/15/2009 | 1/16/2009 | 1/16/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval | 1/16/2009 | 1/16/2009 | 1/15/2009 | | FAIL |
Andrea Tuning
|
|
|
The applicant has requested occupancy of the new building but has not removed the protable classrooms, installed the new parking area adjacent to Liberty Street, has not restriped the parkking located behind the original building and has not installed the required planters and improvments throughout the entire site. As such, the applicant has been given two options. 1 - The applicant may complete of the improvements and then schedule a new inspection or 2 - The applicant may obtain a temporary parking agreement that is offsite AND must bond for the remaining improvments. ANT 1-15-09
|
FIRE-Final Inspection | 1/13/2009 | 1/14/2009 | 1/14/2009 | A | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm permit finaled. Need approved hardware installed on the pocket doors, approved hardware on the south exit door and the east exit door. Need the exit discharge light repaired at the main north exit. Curbing needs painted for fire dept access. One additional fire extinguisher is needed in the second floor corridor.
|
BLD-Conference | 1/8/2009 | 1/8/2009 | 1/8/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 1/8/2009 | 1/8/2009 | 1/8/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 11/20/2008 | 11/21/2008 | 11/21/2008 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/20/2008 at 12:58:03 PM. Contact: ###-####. grid ok
|
BLD-Wall cover | 10/31/2008 | 11/3/2008 | 11/3/2008 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/31/2008 at 1:17:29 PM. Contact: ###-####.
|
BLD-Energy code compliance | 10/7/2008 | 10/7/2008 | 10/7/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/7/2008 at 10:49:30 AM. Contact: ###-####.ok to cover ext walls
|
BLD-Energy code compliance | 9/19/2008 | 9/19/2008 | 9/19/2008 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/19/2008 at 7:10:14 AM. Contact: ###-####.
|
BLD-Wall cover | 9/16/2008 | 9/17/2008 | 9/17/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/16/2008 at 5:30:10 PM. Contact: ###-####. Verified vapor barrier at 2nd floor ceiling, north half. ok to cover.
|
BLD-Wall cover | 9/16/2008 | 9/17/2008 | 9/17/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/16/2008 at 1:57:41 PM. Contact: ###-####. Interior and exterior nailing for shear (at stair towers) ..... and both stair tower walls OK ......OK to insulate, rock and stucco.
|
BLD-Energy code compliance | 9/12/2008 | 9/15/2008 | 9/15/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/12/2008 at 12:46:28 PM. Contact: ###-####. 2-3 b-c attic blowen full.
|
BLD-Framing/Rough-in | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/4/2008 at 7:49:25 AM. Contact: ###-####. Nailing and straps for roof diaphragm between grids 1-4 and C-D.
|
BLD-Wall cover | 9/2/2008 | 9/3/2008 | 9/3/2008 | P | DONE |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/2/2008 at 10:54:35 AM. Contact: ###-####.
|
BLD-Wall cover | 9/2/2008 | 9/2/2008 | 9/2/2008 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/2/2008 at 7:50:48 AM. Contact: ###-####. (2) Interior shear walls.... Lobby rm 151 and near West stair tower..... OK
|
BLD-Other | 8/28/2008 | 8/29/2008 | 8/29/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/28/2008 at 1:47:12 PM. Contact: ###-####. Inspected nailing for roof diaphragm and verified required straps between gris 1-7 and a-b
|
BLD-Wall cover | 8/25/2008 | 8/26/2008 | 8/26/2008 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/25/2008 at 4:53:18 PM. Contact: ###-####. Roof framing OK
|
BLD-Framing/Rough-in | 8/26/2008 | 8/26/2008 | 8/26/2008 | P | PART |
Jim Sly
|
|
|
Scheduled by ###-#### OK to totally fill roof joist bays in leiu of installing sprinklers.....roof framing ok
|
BLD-Energy code compliance | 8/26/2008 | 8/26/2008 | 8/26/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/26/2008 at 6:46:22 AM. Contact: ###-####. 1st floor select Ext. walls
|
BLD-Framing/Rough-in | 8/21/2008 | 8/22/2008 | 8/22/2008 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/21/2008 at 5:14:27 PM. Contact: ###-####. !st floor appears OK........Needs firestop on a few through electrical box penitrations at 1hr walls.
|
BLD-Conference | 7/31/2008 | 8/1/2008 | 8/1/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/31/2008 at 3:34:26 PM. Contact: ###-####.
|
BLD-Conference | 7/30/2008 | 7/31/2008 | 7/31/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/30/2008 at 3:27:30 PM. Contact: ###-####.
|
BLD-Conference | 7/29/2008 | 7/30/2008 | 7/30/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/29/2008 at 2:15:35 PM. Contact: ###-####. easr side is afull fill of insulation in ceiling
|
BLD-Framing/Rough-in | 7/24/2008 | 7/25/2008 | 7/25/2008 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/24/2008 at 8:19:04 AM. Contact: ###-####. lid ok pending other inspections
|
CHANGE STATUS TO (ISS) | | | 6/20/2008 | | |
|
|
|
previously issued- plan mod
|
(F) Reprint permit | | | 6/20/2008 | | |
|
|
|
|
OVERRIDE | | | 6/19/2008 | | |
|
|
|
|
Print Occupancy Form | | | 6/19/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/19/2008 | | DONE |
Barbara Stitt
|
|
|
Called Eric Packer and left voice message that plan mod is ready and fees due///6-19-08 @ 10:52am BAS
|
Permit Ready to Issue | | | 6/19/2008 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (JCM) | 6/13/2008 | 6/13/2008 | 6/18/2008 | | PASS |
John Menard
|
|
|
6/18/2008 16:18:37 JCM - activity updated through activity BLDA022 from case BLD08-00234.
|
Routing - PLUMBING | 6/17/2008 | | 6/18/2008 | | PASS |
Bill VanDegrift
|
|
|
no plumbing
|
Routing - PLAN CHECK | 6/18/2008 | | 6/18/2008 | | PASS |
John Menard
|
|
|
Plan modification to relocate a parking lot drainage field location.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2008 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 6/16/2008 | | 6/17/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 6/16/2008 | | 6/17/2008 | | PASS |
Brian Murphy
|
|
|
|
Plan Modification Accepted | | | 6/13/2008 | | |
John Menard
|
|
|
plan modification excepted for Bld08-00234 for the redesign to construct a new seepage bed to relocate & replace an existing parking lot seepage bed. the existing seepage bed over laps the building foundation & will require to be moved. a new bed will be constructed further south. the exising catch basin location will direct storn via pipe to the new basin on sheets C2 of C4 (paving & landscaping no affected)routed to John Menard.
|
BLD-Foundation | 5/29/2008 | 5/30/2008 | 5/30/2008 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/29/2008 at 3:10:32 PM. Contact: ###-####.
|
BLD-Footing | 5/23/2008 | 5/27/2008 | 5/27/2008 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/23/2008 at 12:38:23 PM. Contact: ###-####. spec insp on site
|
(F) Reprint permit | | | 5/7/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/6/2008 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 4/28/2008 | | 4/28/2008 | | PASS |
Louise Waldorf
|
|
|
Original sign off was on 2-27-08.
|
Print Occupancy Form | | | 4/25/2008 | | DONE |
|
|
|
|
Telephone call | | | 4/25/2008 | | DONE |
|
|
|
left vm for zack lester at ###-#### - permit ready and fees given - also need gc name, rce#, rp name and ACHD receipt
|
Permit Ready to Issue | | | 4/25/2008 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 2/11/2008 | | 4/24/2008 | | PASS |
John Menard
|
|
|
4/24/2008 13:52:56 JCM - activity updated through activity BLDA022 from case BLD08-00234.
|
Routing - PLANNING | 3/4/2008 | | 4/24/2008 | | FAIL |
Andrea Tuning
|
|
|
The applicant has not submitted revised drawings to DR or CU staff addressing the conditions of approval. The applicant was also required to provide a shared parking agreement. This document has not been submitted at this time. ANT ###-#### 3-4-08.
drh07-00551 Andrea Tuning & cup07-00163 for Josh Wilson
|
Routing - PLANNING | 4/23/2008 | | 4/24/2008 | | PASS |
Joshua Johnson
|
|
|
Approved per DRH07-00551 4-24-08 ANT.
Approoved per CUP07-00163. 4-24-08 JRJ
Routed to John Menard
|
Routing - PLAN CHECK | 4/24/2008 | | 4/24/2008 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2008 | | DONE |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 4/23/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved revised plans with red lined notes and attached comment list. JCM
|
Routing - PLAN CHECK | 4/11/2008 | | 4/23/2008 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 4/18/2008 | | |
|
|
|
Received 1 cover transmittal, 1 copy of response dated 4-16-08 from CTA, 1 copy of 2006 Envelope Compliance, 1 copy of cover transmittal from CTA dated 4-15-08, , 1 copy of plan review comments, 2 sets of sheets EC101, F101, sheet C1 of C4, sheet C2 of C4, sheet C3 of C4, sheet C4 of C4, L303, A001, A002, A003, A004, A006, A102, A401, A403, A501, A502, A701, A801, A802, A804, A901, A902, inserted into plans and taken back to John Menards desk///4-18-08 @ 10:00am BAS
|
1st review completed | | | 4/11/2008 | | FAIL |
|
|
|
Failed PW, Structural, Plumbing, Planning, Plan Check
|
Routing - FIRE | 4/7/2008 | | 4/11/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 3/4/2008 | | 4/7/2008 | | FAIL |
John Menard
|
|
|
John Menard
|
Plan Reviewer's activity | | | 4/7/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved structural calculation revisions. JCM
|
Plan resubmittals requested | | | 4/7/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLUMBING | 4/7/2008 | | 4/7/2008 | | PASS |
Bill VanDegrift
|
|
|
per resubmitted plans dated 3/11/08 and 2003 upc
|
Plan resubmittals received | | | 3/26/2008 | | |
|
|
|
Received 1 cover transmittal, and 3 copies of sheets L301, L302, L303, L401, L402, L403 and inserted by CTA runner and taken back to John Menard's desk 3-26-08 @ 4:10pm BAS
|
Plan resubmittals received | | | 3/21/2008 | | |
|
|
|
Received 1 cover transmittal, 4 copies of sheets c1 of c4, c2 of c4, c3 of c4, c4 or c4, A0001, A0002, A0003, A00004, F102 and inserted by CTA and taken to John Menard///3-21-08 @ 4:34pm BAS
|
Plan resubmittals received | | | 3/11/2008 | | |
|
|
|
Received transmittal, three copies of sheets P300, P302, and two copies of three page plumbing details; inserted by arch. rep. and taken back to John Menard
|
Routing - PLUMBING | 2/28/2008 | | 3/4/2008 | | FAIL |
Bill VanDegrift
|
|
|
each dental chair with water will require it's own reduced pressure backflow preventor located over a floor sink. provide a new detail. notes 3&4 page P302- pipe intake for the air compressor and the exhaust for the vacuum pump to the exterior, terminate per NFPA 99C. additional cross connection protection may be required.
|
Routing - Erosion and Sediment | 2/27/2008 | | 2/28/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. Refer to ESC08-00234.
|
Routing PW Solid Waste | 2/26/2008 | | 2/27/2008 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PUBLIC WORKS | 2/22/2008 | | 2/27/2008 | | PASS |
Beverly Hall
|
|
|
per Brian Murphy route to public works
|
Routing PW Street Lights | | | 2/26/2008 | | PASS |
Bill Colson
|
|
|
|
Routing PW Sewer Rating | 2/26/2008 | | 2/26/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Drainage | 2/25/2008 | | 2/25/2008 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals requested | | | 2/22/2008 | | DONE |
John Menard
|
|
|
Faxed the architect a copy of the structural review requesting revisions. JCM
|
Plan resubmittals received | | | 2/22/2008 | | |
|
|
|
received "5" sheets each of Cz of C4 --plans re-routed to public works
|
Routing Off Site - STRUCTURAL | 2/11/2008 | | 2/22/2008 | | FAIL |
John Menard
|
|
|
called action couries at ###-#### for pickup - Received comment list from the consulting structural engineer requesting revisions. JCM
|
Routing PW Drainage | 2/12/2008 | | 2/21/2008 | | FAIL |
Brian Murphy
|
|
|
Need 20% drainrock on swale bottom.BRIAN MURPHY ###-####
|
(F) Reprint permit | | | 2/12/2008 | | |
|
|
|
|
Routing - PUBLIC WORKS | 2/12/2008 | | 2/12/2008 | | PASS |
Dave Abo
|
|
|
|
Routing - PLANNING Land Div | 2/12/2008 | | 2/12/2008 | | PASS |
Dave Abo
|
|
|
Legal parcel existed prior to October 30, 1965. (Combined parcel comprised of parts of 4 original lots)
|
Plans ACCEPTED BY PLAN TECH | | | 2/11/2008 | | |
|
|
|
|
Application received | | | 2/11/2008 | | |
|
|
|
|
Pending Assignment by MYS | 2/11/2008 | | 2/11/2008 | | DONE |
John Menard
|
|
|
2/11/2008 13:48:35 JCM - activity updated through activity BLDA166 from case BLD08-00234.
|
Recd Pcfee & Taken To Pln CK | | | 2/11/2008 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/11/2008 | | |
|
|
|
|
PubWorks Occupancy Approval | 1/15/2009 | 1/15/2009 | | | |
|
|
|
Signed final occupancy 01/13/09
|