Permit Information
Permit NumberBLD08-00272
StatusFinaled
Name GENE O'DELL
Site Address 110 S PEASLEY ST
Project Name 
Customer Number 
ePlanReviewNo
Description
12-9-08 new owner to take over building permit see attached sheets inspections just to the footing stage. ///DLD To construct a new 1338s.f. 3-story single family dwelling with 380s.f. in the basement; main level 2nd level and 198s.f. on the 3rd level loft area. R-2 approved through DRH06-00027 by Sarah M Schafer. All per the approved plans as marked Rescheck and the plan review notes. pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/18/20103/18/20103/18/2010PPASS
DetailsTom Arcoraci
co left on counter
BLD-Final3/17/20103/18/20103/18/2010ANR
DetailsTom Arcoraci
or ###-#### Gene Phone #: ###-#### locked
DOC - Permit Finaled3/18/20103/18/20103/18/2010PPASS
DetailsTom Arcoraci
BLD-Final3/12/20103/15/20103/15/2010PFAIL
DetailsTom Arcoraci
gene Phone #: ###-####
BLD-Final3/10/20103/10/20103/10/2010PFAIL
DetailsTom Arcoraci
needs handrails on stairs
BLD-Final3/9/20103/10/20103/10/2010AFAIL
DetailsTom Arcoraci
needs hand rails on stairs
BLD-Final3/9/20103/9/20103/9/2010PNR
DetailsTom Arcoraci
needs plumbing
BLD-Final3/8/20103/9/20103/9/2010ANR
DetailsTom Arcoraci
gene Phone #: ###-####
Zoning Approval3/9/20103/9/20103/9/2010 DONE
DetailsSarah Schafer
Meets DR and CVA requirements.
BLD-Aging Inspection3/3/20103/3/20103/3/2010 NR
DetailsTom Arcoraci
BLD-Aging Inspection1/1/20101/1/20101/4/2010 NR
DetailsTom Arcoraci
BLD-Energy code compliance9/1/20099/2/20099/2/2009APASS
DetailsMike Jordan
Gene Phone #: ###-####
BLD-Framing/Rough-in8/27/20098/28/20098/28/2009APASS
DetailsMike Jordan
Gene Phone #: ###-####. All framing issues were resolved. wip on front elevation of house to comply with approved plans. Noted to contractor that exterior work needs to be completed before energycode insp.
BLD-Framing/Rough-in8/3/20098/4/20098/4/2009AFAIL
DetailsDave Hannah
Gene Phone #: ###-#### do not cover c/n on site ext of bldg not per approved plans along with other framing corrections
BLD-Other8/4/20098/4/20098/4/2009AFAIL
DetailsJim Sly
Site review of structure. CN issued for violations of minimum code provisions (framing).
Routing Walk-In (BLD)5/28/20095/28/20095/28/2009PPASS
DetailsPerry Paine
explained to Mr O'dell that a non-buildagreement with the parks department would be the only way to keep any openings.
BLD-Conference4/30/20094/30/20094/30/2009PFAIL
DetailsTom Arcoraci
correction notice posted to return to plan review for any new requirements due reduced set back
Case Summary (BLD)  4/6/2009  
BLD-Other1/14/20091/14/20091/14/2009AFAIL
DetailsTom Arcoraci
needs pins and string lines set for insp
Case Summary (BLD)  12/18/2008  
BLD-Foundation12/11/200812/12/200812/12/2008APASS
DetailsTom Arcoraci
mark Phone #: ###-####
BLD-Conference12/9/200812/9/200812/9/2008AFAIL
DetailsTom Arcoraci
no further work to be done until esc and bld have been transfered to new owner
BLD-Footing12/8/200812/9/200812/9/2008APASS
DetailsTom Arcoraci
justin Phone #: ###-####
Inspection Record Card- Bld  12/9/2008 DONE
(F) Reprint permit  12/9/2008 DONE
Extend Permit 180 days 9/11/20089/11/2008 PASS
per jim storey ok to extend 180 days-customer Angile Wood working on bench swr district approval...
Issue PAID IN FULL permit  4/8/2008 DONE
Routing - PLAN CHECK  2/25/2008 PASS
Case Summary (BLD)  2/25/2008  
PLANS/APPL TAKEN TO FRONT DESK  2/25/2008 DONE
Inspection Record Card- Bld  2/25/2008 DONE
Telephone call  2/25/2008 DONE
left vm for mike wood at ###-#### - permit ready and fees given - also need gc name, rce# and rp license is expired
Permit Ready to Issue  2/25/2008 DONE
Routing - PLANNING2/15/2008 2/21/2008 FAIL
DetailsSarah Schafer
Routed to Sarah Schafer-DRH06-00027

The building plans did not contain an accurate site plan showing porches, dimensions and vegetation. I left a message for Mike Wood, listed as the contact person on the application. Let him know we would need this information prior to planning signing off. I will hold the plans in my office until I hear from him as to a time line for the submittal of the site plan.
Routing - PLANNING2/21/2008 2/21/2008 PASS
DetailsSarah Schafer
Spoke with Angela Wood regarding site plan. She said to pull the site plan from the Design Review application to attach to the Building Permit plans. This plan has been copied, signed and attached to the documents. Staff has approved the plans per DRH06-00027. The Design Review 18 month approval period expired on February 15, 2008 however the applicant had the building permit request into the city on February 13, 2008 beating the deadline.
Application received  2/15/2008  
Routing - Addressing2/15/2008 2/15/2008 PASS
DetailsChris Pichardo
Routing - PUBLIC WORKS2/15/2008 2/15/2008 PASS
DetailsLouise Waldorf
Routing - PUBLIC WORKS2/21/2008