Third Notice BLD | 9/22/2008 | 9/22/2008 | 12/30/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/20/2008 | 8/11/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/17/2008 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 5/20/2008 | | DONE |
|
|
|
|
BLD-Final | 4/10/2008 | 4/11/2008 | 4/11/2008 | A | PASS |
Jim Sly
|
|
|
Brian, late a.m. if possible = ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt OK for Perm Occ. :)
|
FIRE-Final Inspection | 4/10/2008 | 4/11/2008 | 4/11/2008 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 4/9/2008 | 4/10/2008 | 4/10/2008 | P | CANC |
Jim Sly
|
|
|
Brian = ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt Canc by Contr.....
|
FIRE-Final Inspection | 4/9/2008 | 4/10/2008 | 4/10/2008 | A | FAIL |
Troy Cobbley
|
|
|
Remove thumbturn from the main exit as discussed.
|
Plan Reviewer's activity | | | 4/10/2008 | | DONE |
|
|
|
After discussion with Scott Arellano (fire) the determination was made that both front doors opening into reception area were main doors and allowed key locking hardware from the inside. The reasoning was there close proximity and the fact that they opened into the same space.
|
Meeting | | | 4/10/2008 | | DONE |
Scott Arellano
|
|
|
Keyed locking hardware will be allowed to remain on the two main entry doors shown on plans; per IBC plan reviewer Tim Woodward. Each door shall have the approved signage in acordance with 2006 IBC section 1008.1.8.3.
|
BLD-Other | 4/3/2008 | 4/4/2008 | 4/4/2008 | P | PASS |
Jim Sly
|
|
|
bryan - ceiling grid Phone #: ###-####
|
BLD-Energy code compliance | 3/13/2008 | 3/14/2008 | 3/14/2008 | A | PASS |
Jim Sly
|
|
|
bryan - cover Phone #: ###-####
|
BLD-Framing/Rough-in | 3/11/2008 | 3/12/2008 | 3/12/2008 | A | PASS |
Jim Sly
|
|
|
brian Phone #: ###-####
|
Plan assigned to (TLW) | 2/28/2008 | | 3/11/2008 | | PASS |
Tim L. Woodard
|
|
|
3/11/2008 09:55:19 TLW - activity updated through activity BLDA022 from case BLD08-00273.
|
Routing - PLAN CHECK | 3/10/2008 | | 3/11/2008 | | PASS |
Tim L. Woodard
|
|
|
Cut-sheet resubmitted drinking fountains now comply
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/11/2008 | | 3/11/2008 | | PASS |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 3/11/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/11/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/11/2008 | | DONE |
|
|
|
left vm for larry knopp at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/11/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/11/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/6/2008 | | 3/10/2008 | | FAIL |
Tim L. Woodard
|
|
|
Resubmittals didn't cover all corrections needed. Spoke with Oscar from LRK architects he is addressing drinking fountain issues.
|
Plan resubmittals received | | | 3/7/2008 | | DONE |
|
|
|
received 1 response,1 spec water cooler,and 2 copies of sheets A2.0, A3.0 taken to Tim W.
|
1st review completed | | | 3/6/2008 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - FIRE | 3/5/2008 | | 3/6/2008 | | PASS |
Scott Arellano
|
|
|
Plans are approved with red line annotations. Attached IFC comments to plans
|
Routing - PLAN CHECK | 2/22/2008 | | 3/5/2008 | | FAIL |
Tim L. Woodard
|
|
|
Corrections noted on plan review report.
|
Plan assigned to (CJW) | 2/20/2008 | | 2/28/2008 | | ---- |
Marlene Southard
|
|
|
PARTIAL PERMIT GRANTED 2/21/08.
Reassigned to Tim by MSouthard on 2/28/08.
|
Routing - PLUMBING | 2/20/2008 | | 2/22/2008 | | PASS |
Bill VanDegrift
|
|
|
whirlpool to be filled and drained at the mop sink. per plans and 2003 upc.
|
Routing - PUBLIC WORKS | 2/20/2008 | | 2/20/2008 | | PASS |
Beverly Hall
|
|
|
|
Early Start Permit | | | 2/20/2008 | | DONE |
|
|
|
Per Marlene ok to have early start only for r/i of elec, plm, and mech, no framing inspection allowed until full permit is issued; no fees to be collected at this time.
|
Telephone call | | | 2/20/2008 | | |
|
|
|
called Brian (GC) and told him early start is ready, no fees due
|
Routing PW Sewer Rating | 2/20/2008 | | 2/20/2008 | | PASS |
Louise Waldorf
|
|
|
|
Pending Assignment by MYS | 2/15/2008 | | 2/20/2008 | | DONE |
Marlene Southard
|
|
|
2/20/2008 09:28:26 MYS - activity updated through activity BLDA172 from case BLD08-00273.
|
Plan Reviewer's activity | | | 2/20/2008 | | DONE |
|
|
|
PARTIAL PERMIT ISSUED 2/21/08 AT THE REQUEST OF THE CONTRACTOR. By policy this allows the rough in of elect., plumbing and mechanical but NO FRAMING until full permit is issued. (A partial permit is issued for construction to the framing stage including rough-in electrical, plumbing and mechanical while the plans for the space are being reviewed. Any construction not meeting code must be removed prior to framing inspection approval and any further construction being authorized. BCC resolution 13535 9/12/95)
|
Application received | | | 2/15/2008 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/15/2008 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/15/2008 | | |
|
|
|
|