Third Notice BLD | 9/22/2008 | 9/22/2008 | 3/20/2018 | | DONE |
Cathy Brown
|
|
|
This permit finaled on the web by Garrett Bailey
|
Case Summary (BLD) | | | 12/17/2008 | | |
|
|
|
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/18/2008 | 8/11/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/28/2008 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 7/18/2008 | | DONE |
Barbara Stitt
|
|
|
Ok per Bob Jue with Central District Health to give perm occ///7-18-08 BAS
|
BLD-Final | 7/14/2008 | 7/16/2008 | 7/16/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/14/2008 at 12:29:05 PM. Contact: ###-####. - please call 1/2 hr prior to inspection. Ok for perm occ.
|
BLD-Final | 7/10/2008 | 7/11/2008 | 7/11/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/10/2008 at 12:41:41 PM. Contact: ###-####. Ok for temp occ...Needs to install tactile exit sighns at enterance/exits.
|
FIRE-Final Inspection | 7/10/2008 | 7/11/2008 | 7/11/2008 | A | PASS |
Troy Cobbley
|
|
|
fire life safety passed
|
Telephone call | | | 7/11/2008 | | DONE |
|
|
|
Mike Salyer, contractor, called concerning CDHD signature requirements. Letter recieved on 4/28 from architect and approval from field inspector for mechnaical stating will be treated like residential range hood and only preparing food for EMT on duty, the need for CDHD approval is not required. Unchecked the inspection box for CDHD and called Mike to let him know.
|
Temporary Occupancy UNPAID FEE | | | 7/11/2008 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 7/9/2008 | 7/10/2008 | 7/10/2008 | P | FAIL |
Forrest France
|
|
|
No approved city plan on site, egress lights at front and back entrances did not function and front door hardware was in correct.KR
|
BLD-Final | 7/7/2008 | 7/8/2008 | 7/8/2008 | P | CANC |
Mike Jordan
|
|
|
A.J Phone #: ###-####
|
BLD-Other | 7/8/2008 | 7/8/2008 | 7/8/2008 | P | PASS |
Mike Jordan
|
|
|
A.J Phone #: ###-####. Ceiling grid ok.
|
BLD-Framing/Rough-in | 5/22/2008 | 5/23/2008 | 5/23/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/22/2008 at 3:49:15 PM. Contact: ###-####.. Interior walls and harlids ok. no grid. Will call back on 1hr wall.
|
BLD-Framing/Rough-in | 5/5/2008 | 5/6/2008 | 5/6/2008 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/5/2008 at 1:14:06 PM. Contact: ###-####. Stiil needs plumbing and mech ri insp. prior to framing insp.
|
Issue PAID IN FULL permit | | | 4/18/2008 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/10/2008 | | DONE |
|
|
|
|
Telephone call | | | 4/8/2008 | | DONE |
|
|
|
Called talked with Ken Pertmit ready and fees given Need GC $ RCE # , RP,and ACHD
|
Routing - PLAN CHECK | 4/4/2008 | | 4/7/2008 | | PASS |
Dan Stuart
|
|
|
Plans routing to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2008 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/7/2008 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 2/25/2008 | | 4/7/2008 | | PASS |
Dan Stuart
|
|
|
4/7/2008 06:09:50 DRS - activity updated through activity BLDA022 from case BLD08-00277.
|
Routing - PLAN CHECK | 4/2/2008 | | 4/4/2008 | | PEND |
Dan Stuart
|
|
|
Inserted plan resubmittal sheets. No further submittals required. Routing back to public works to re-evauate fees for added drinking fountains.
|
Plan resubmittals received | | | 4/4/2008 | | DONE |
|
|
|
received "2" sheets each of M1.1, M3.1, & EO.O-- also "2" sheets of A2.1--plans taken to Dan Stuart
|
Routing - PUBLIC WORKS | 4/4/2008 | | 4/4/2008 | | PASS |
|
|
|
Reviewed for additional fee's for added drinking fountains. Routed back to Dan Stuart.
|
Routing - PLAN CHECK | 3/28/2008 | | 4/2/2008 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required.
|
Plan resubmittals requested | | | 4/2/2008 | | DONE |
|
|
|
E-mailed correction / plan review to Scott Wendell, LCA.
|
1st review completed | | | 3/28/2008 | | PASS |
|
|
|
|
Routing - FIRE | 3/21/2008 | | 3/28/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 2/28/2008 | | 3/21/2008 | | PEND |
Dan Stuart
|
|
|
Routed for fire code analyst review while out of office on vacation.
|
Routing - PLANNING | 2/27/2008 | | 2/28/2008 | | PASS |
Sue Hansen
|
|
|
Sue Hansen CUP07-00143
|
Routing - Erosion and Sediment | 2/26/2008 | | 2/27/2008 | | PASS |
Steven Webb
|
|
|
ESC plan waiver request approved with attached conditions.
|
Routing - PLUMBING | 2/27/2008 | | 2/27/2008 | | PASS |
Bill VanDegrift
|
|
|
the vapor compartment vent must be extended independently to the exterior. trench drain vent may not connect to the sanitary sewer venting system. eye wash may require cross connection protection, PVB.
|
Routing - PUBLIC WORKS | 2/25/2007 | | 2/26/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 2/26/2008 | | 2/26/2008 | | PASS |
Louise Waldorf
|
|
|
|
Office Staff conference/action | | | 2/25/2008 | | DONE |
|
|
|
Received ESC application and waiver letter///2-28-08 @ 3:23pm BAS
|
Plans ACCEPTED BY PLAN CHECK | | | 2/25/2008 | | PASS |
|
|
|
ESC application and waiver request letter received. Routing began.
|
Telephone call | | | 2/21/2008 | | DONE |
|
|
|
Called Scott Wendell (LCA Architects)and left a voice message to inform him that an ESC application is required on this project, they can also apply for a waiver///2-21-08 @ 3:20pm BAS
|
Application received | | | 2/19/2008 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/19/2008 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/19/2008 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 2/19/2008 | | FAIL |
|
|
|
PLANS/APPLICATION CANNOT BE PROCESSED. Incomplete information provided to begin routing plans. No ESC application or plans brought in with building application. On hold.
|
Pending Assignment by MYS | 2/19/2008 | | | | |
|
|
|
2/19/08 - CANNOT BEGIN ROUTING until ESC application and waiver request for ESC plan is submitted. (msouthard)
|