Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-00280
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 9196 W EMERALD ST Unit: 130
Project NamePINNACLE SQUARE
Customer Number 
ePlanReviewNo
Description
*(XVITA LLC / JUS T.I.)* - (PINNACLE SQUARE - STE 130) To construct a 5,162 sq.ft. office tenant in an existing shell building (BLD07-02611) per approved plans. This office building allowed in M-1D zone under CUP99-00166. Work to include construction of two accessible restrooms, installation of a suspended ceiling system, construction of interior partitions, and interior finishes in compliance with Ch. 8 of the 2006 IBC. PARTIAL PERMIT ISSUED 3/10/2008. This building is fully fire sprinklered for area increase, any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department.**TLW** (PLAN MODIFICATION 4-21-08) - Modifiacation is to change two offices shown on approved plans to three offices by rearranging interior non-bearing partition walls and adding 1 more door.**TLW
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/11/20088/11/20089/4/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 6/3/20088/11/2008 DONE
Case Summary (BLD)  6/18/2008 DONE
BLD-Final6/2/20086/3/20086/3/2008APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/2/2008 at 2:11:50 PM. Contact: ###-####. Vertical grabbars installed at correct height, and tempered glazing installed. ok for perm occ.
Permanent Occupancy  6/3/2008 DONE
DetailsCathy Weisshaupt
BLD-Final5/21/20085/22/20085/22/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/21/2008 at 3:01:19 PM. Contact: ###-####. ok for temp. occ. Needs to mount the vertical grab bars at correct height. Install remaing safety glazing.
FIRE-Final Inspection5/21/20085/22/20085/22/2008APASS
DetailsTroy Cobbley
Life safety passed
Temporary Occupancy5/22/20088/20/20085/22/2008 DONE
DetailsCathy Weisshaupt
BLD-Other5/13/20085/14/20085/14/2008PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/13/2008 at 4:27:32 PM. Contact: ###-####.
Extend Permit 180 days5/14/20085/14/20085/14/2008ACANC
DetailsMike Jordan
BLD-Other5/14/20085/14/20085/14/2008APASS
DetailsMike Jordan
Ceiling grid ok.
BLD-Other5/13/20085/13/20085/14/2008PDEFR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/13/2008 at 7:54:37 AM. Contact: ###-####.
(F) Reprint permit  4/24/2008 DONE
CHANGE STATUS TO (ISS)  4/24/2008  
plan mod - already issued previously
PLANS/APPL TAKEN TO FRONT DESK  4/22/2008 DONE
the plan mod was done under bld08-00281 should have been on bld08-00280
Case Summary (BLD)  4/22/2008 DONE
Case Summary (BLD)  4/22/2008 DONE
Print Occupancy Form  4/22/2008 DONE
Telephone call  4/22/2008 DONE
t/c w marv at ###-#### - permit ready and fees given
Permit Ready to Issue  4/22/2008 DONE
BLD-Energy code compliance4/8/20084/9/20084/9/2008APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/8/2008 at 7:31:11 PM. Contact: ###-####.
BLD-Framing/Rough-in4/8/20084/9/20084/9/2008APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/8/2008 at 7:30:35 PM. Contact: ###-####. Interior framed walls and hardlid only. no grid.
Issue PAID IN FULL permit  4/8/2008 DONE
Print Occupancy Form  4/7/2008 DONE
Telephone call  4/7/2008 DONE
t/c w dawn jenkins at ###-#### - permit ready and fees given
Permit Ready to Issue  4/7/2008 DONE
1st review completed  4/4/2008 PASS
Routing - PLAN CHECK4/4/2008 4/4/2008 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  4/4/2008 DONE
Plan assigned to (TLW)2/21/2008 4/4/2008 PASS
DetailsTim L. Woodard
4/4/2008 15:43:52 TLW - activity updated through activity BLDA022 from case BLD08-00280.
Routing - FIRE3/30/2008 4/4/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK2/22/2008 3/30/2008 PASS
DetailsTim L. Woodard
Approval per approved plans and attached plan review report.
Plan Reviewer's activity  3/10/2008 DONE
PARTIAL PERMIT issued at the request of Jonathan Seel who represents the parcel owner. See CONDITION attached to this permit.
Early Start Permit  3/10/2008 DONE
DetailsTisha Gallop
Telephone call  3/10/2008 DONE
DetailsTisha Gallop
called Jonathan Seel and told him partial permit is ready for pick up
Routing PW Sewer Rating2/22/2008 2/22/2008 PASS
DetailsLouise Waldorf
Routing - PUBLIC WORKS2/22/2008 2/22/2008 PASS
DetailsBeverly Hall
Pending Assignment by MYS2/19/2008 2/21/2008 DONE
DetailsMarlene Southard
2/21/2008 15:43:03 MYS - activity updated through activity BLDA185 from case BLD08-00280.
Plans ACCEPTED BY PLAN TECH  2/20/2008  
Recd Pcfee & Taken To Pln CK  2/20/2008  
Application received  2/19/2008