Code Occupancy Approval | 7/9/2008 | 7/9/2008 | 7/9/2008 | P | PASS |
Dena Gambrel
|
|
|
|
DOC - Permit Finaled | 7/2/2008 | 7/2/2008 | 7/2/2008 | P | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 7/1/2008 | 7/1/2008 | 7/2/2008 | P | PASS |
Tom Arcoraci
|
|
|
Richard Phone #: ###-#### ok pending zoning sign off
|
Code Occupancy Approval | 7/1/2008 | 7/1/2008 | 7/1/2008 | P | FAIL |
Dena Gambrel
|
|
|
7-1-08 1415 Failed Occupancy. Need updated landscape plan on location. Fence needs to be completed. A verbal correction was given. Richard will locate an update landscape plan and the fence should be done later today. He will call me back tomorrow when fence is done and plans are on location.
|
BLD-Wall cover | 4/20/2008 | 4/21/2008 | 4/21/2008 | A | PASS |
Dave Hannah
|
|
|
There was an inspection conducted Friday 4/18 by Dave H. but I did not find a sticker in the window indicating it was ok to cover (Sheetrock) which is scheduled for Monday at 8:00 am. Phone #: ###-#### Internet Inspection Request from: Richard Besendorfer
|
BLD-Framing/Rough-in | 4/18/2008 | 4/18/2008 | 4/18/2008 | P | PASS |
Dave Hannah
|
|
|
richard Phone #: ###-####
|
BLD-Framing/Rough-in | 4/16/2008 | 4/16/2008 | 4/16/2008 | P | PART |
Tom Arcoraci
|
|
|
richard Phone #: ###-#### ok pending plumbing ok
|
BLD-Energy code compliance | 4/16/2008 | 4/16/2008 | 4/16/2008 | P | NR |
Tom Arcoraci
|
|
|
richard Phone #: ###-####
|
BLD-Framing/Rough-in | 4/11/2008 | 4/11/2008 | 4/11/2008 | P | PART |
Tom Arcoraci
|
|
|
richard Phone #: ###-####
|
BLD-Foundation | 3/10/2008 | 3/10/2008 | 3/10/2008 | P | PASS |
Tom Arcoraci
|
|
|
logan Phone #: ###-####
|
BLD-Footing | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Tom Arcoraci
|
|
|
logan Phone #: ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/7/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/7/2008 | | DONE |
|
|
|
customer was here to pick up the permits
|
Permit Ready to Issue | | | 3/7/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/7/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 3/6/2008 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 2/29/2008 | 2/29/2008 | 2/29/2008 | | DONE |
Carl D Madsen
|
|
|
|
Pending Assignment by SRZ | 2/21/2008 | | 2/29/2008 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | 2/22/2008 | | 2/25/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PLAN CHECK | 2/25/2008 | | 2/25/2008 | | FAIL |
Carl D Madsen
|
|
|
Resubmittals required
1) 1hour fire rated wall and eve assembly required on side with 3' setback. Maximum eve projection can only be 12".
2) 1 hour fire rated eve assembly on side with 5' setback
3) New res check that reflects building construction
4) Alternate wall bracing to be per code Conditions are n longer applicable
|
Routing - Addressing | 2/21/2008 | | 2/22/2008 | | PASS |
Chris Pichardo
|
|
|
|
Routing - PLANNING | 2/22/2008 | | 2/22/2008 | | PASS |
Josh Wilson
|
|
|
Routed to Josh Wilson - DRH07-00560
|
Application received | | | 2/21/2008 | | |
|
|
|
|