Code Occupancy Approval | 7/9/2008 | 7/9/2008 | 7/9/2008 | P | PASS |
Dena Gambrel
|
|
|
|
DOC - Permit Finaled | | | 7/9/2008 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 7/1/2008 | 7/1/2008 | 7/2/2008 | P | PASS |
Tom Arcoraci
|
|
|
Richard Phone #: ###-#### ok pending zoning
|
Code Occupancy Approval | 7/1/2008 | 7/1/2008 | 7/1/2008 | P | FAIL |
Dena Gambrel
|
|
|
7-1-08 1415 Failed Occupancy. Need updated landscape plan on location. Fence needs to be completed. A verbal correction was given. Richard will locate an update landscape plan and the fence should be done later today. He will call me back tomorrow when fence is done and plans are on location.
|
BLD-Framing/Rough-in | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | PASS |
Tom Arcoraci
|
|
|
Richard; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Energy code compliance | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | PASS |
Tom Arcoraci
|
|
|
Richard; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Framing/Rough-in | 4/3/2008 | 4/3/2008 | 4/3/2008 | P | PASS |
Tom Arcoraci
|
|
|
richard Phone #: ###-####
|
BLD-Wall cover | 3/31/2008 | 4/1/2008 | 4/1/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 3/31/2008 | 3/31/2008 | 3/31/2008 | P | PART |
Tom Arcoraci
|
|
|
richard Note: fire safety sheet rock Phone #: ###-####
|
BLD-Foundation | 3/10/2008 | 3/10/2008 | 3/10/2008 | P | PASS |
Tom Arcoraci
|
|
|
logan Phone #: ###-####
|
BLD-Footing | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Tom Arcoraci
|
|
|
logan Phone #: ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/7/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/7/2008 | | DONE |
|
|
|
customer was here to pick up the permit
|
Permit Ready to Issue | | | 3/7/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/7/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/6/2008 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 2/29/2008 | 2/29/2008 | 2/29/2008 | | DONE |
Carl D Madsen
|
|
|
|
Pending Assignment by SRZ | 2/21/2008 | | 2/29/2008 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | 2/22/2008 | | 2/25/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - Addressing | 2/22/2008 | | 2/22/2008 | | PASS |
Chris Pichardo
|
|
|
|
Routing - PLANNING | 2/22/2008 | | 2/22/2008 | | PASS |
Josh Wilson
|
|
|
Routed to Josh Wilson - DRH07-00560
|
Application received | | | 2/21/2008 | | |
|
|
|
|
Routing - PLAN CHECK | 2/25/2008 | | | | FAIL |
|
|
|
Re-submittals required
1) One hour fire rated wall and eve projection assembly required for wall with the 3' property line setback
2) One hour fire rated eve projection assembly on side with 5' property line setback
3) Alternate wall braced panels need to be per code, conditions listed on the plans are no longer applcable
4) Res check needs to reflect the hous construction details
2-29-2008
|