Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD08-00360
StatusFinaled
Name COLE VILLAGE LLC
Site Address 3423 N COLE RD
Project NameCOLE VILLAGE
Customer Number 
ePlanReviewNo
Description
(EL TENAMPA RESTAURANT - COLE VILLAGE SHOPPING CENTER) The fire sprinklers are used for building area increase and for fire area. To remodel the inside of a 4,692 square foot restaurant tenant space for a new restaurant tenant. Work is to include interior nonbearing walls, two Class II hood and duct systems, suspended ceilings, booths, and finishes. The grease hood and duct system is existing and will be maintained. The Men's restroom and the employee's restroom will be upgraded to be more accessible to the disabled. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  8/25/2010  
FIRE-Final Inspection8/28/20088/29/20088/29/2008APASS
DetailsTroy Cobbley
Fire life safety completed. KR
BLD-Final8/29/20088/29/20088/29/2008PPASS
DetailsJim Sly
Phone #: ###-####
OK for Perm Occ.
Temporary Occupancy UNPAID FEE  8/29/2008 DONE
DetailsTisha Gallop
FIRE-Final Inspection8/25/20088/26/20088/26/2008ACANC
DetailsTroy Cobbley
Ken contacted Sergio and let him know that the fire life safety can not be completed until the project related FIR for the hood suppression system is completed and a FIR permit is aquired for the hood suppression interconnection with the existing facp.
BLD-Final8/25/20088/25/20088/25/2008ACANC
DetailsJim Sly
FIRE-Final Inspection8/13/20088/14/20088/14/2008AFAIL
DetailsTroy Cobbley
Provide current certification for the hood suppression system ( currently the appliances will not fit under the hood and are too low), remove the dead bolt from the rear exit door and provide single action hardware as per the approved drawings, provide sprinkler protection in the areas where heads are missing and/or overspaced, replace the painted sprinkler heads, repair and test all exit signs and emergency lights and install additional signage as shown on drawing sheets A1.1 and E1, provide verification that the sprinkler system has had itsw annual inspection, provide fire extinguishers throughout the tenant as per the review comments, post the occupant load sign as per the review comments (193), remove dead bolts from the inactive leaf of the main exit/entrance door, provide verification that the hood suppression system is interconnected with the building fire alarm system.
(F) Reprint permit  8/14/2008  
Case Summary (BLD)  8/14/2008  
Meeting  8/14/2008 DONE
Walk-in meeting held with Reuben Pedraza, new tenant owner. Explained each of the fire inspection correction items to him, and how to go about resolving them. Also gave him an alternative design from Carl Westfall to install a keyed deadbolt at the base of each leaf of the double front doors, (inconjunction with the required signage for keyed locks, indicating both doors to remain unlocked when building is occupied), as an approved solution to the currently existing vertical deadbolts on the inactive leaf. I had to deny his request for a TOC while he got the sprinkler deficiencies corrected.
(F) Reprint permit  5/28/2008 DONE
BLD-Conference5/27/20085/27/20085/27/2008PDONE
DetailsJim Sly
bill Phone #: ###-####
Met with Arch and owner.......Need all Req. permits....ie. Mech, Plumb, Electr...Obtain all Req. signatures for finals.
BLD-Conference5/23/20085/27/20085/27/2008ACANC
DetailsJim Sly
bill - 10:30 at site Phone #: ###-####
Print Occupancy Form  5/23/2008 DONE
Print Occupancy Form  4/22/2008 DONE
Telephone call  4/22/2008 DONE
left vm for rocky towle at ###-#### - permit ready and fees given - also need gc name and rce#
Telephone call  4/22/2008 DONE
left message w chuck for ruben pedraza at ###-#### - left vm for rocky towle at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  4/22/2008 DONE
Issue PAID IN FULL permit  4/22/2008 DONE
Routing - PLAN CHECK4/7/2008 4/21/2008 PASS
DetailsCarl Westfall
Drawings approved after the resubmittal review.
Plan assigned to (CJW)3/10/2008 4/21/2008 PASS
DetailsCarl Westfall
4/21/2008 16:14:11 CJW - activity updated through activity BLDA022 from case BLD08-00360.
PLANS/APPL TAKEN TO FRONT DESK  4/21/2008 DONE
Plan resubmittals received  4/17/2008  
DetailsCarl Westfall
Recieved 1 response letter from Rocky Towle dated 4-14-08, A1.1, A2.0, A2.1 and taken to Carl Westfall's desk///4-17-08 @ 11:35am BAS
Plan resubmittals received  4/11/2008  
Received response letter and two copes of sheets COVER, A1.1, A2.0, A2.1, E1; taken to Carl Westfall
1st review completed  4/7/2008 FAIL
Failed Plan Check
Routing - FIRE4/2/2008 4/7/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK3/18/2008 4/2/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on March 31, 2008 and was finished on April 2, 2008. Revised drawings were required. See the plan review report.
Routing - PLUMBING3/11/2008 3/18/2008 PASS
DetailsBill VanDegrift
new fixtures and equipment on existing plumbing. backflow preventors with water discharge must be installed in an accessable location over a floor sink.
Routing - PUBLIC WORKS3/10/2008 3/11/2008 PASS
DetailsBeverly Hall
Routing PW Environmental3/11/2008 3/11/2008 PASS
DetailsWalt Baumgartner
existing grease trap from Asiago's operation.
Routing PW Sewer Rating3/11/2008 3/11/2008 PASS
DetailsLouise Waldorf
Pending Assignment by MYS2/28/2008 3/10/2008 DONE
DetailsMarlene Southard
3/10/2008 16:37:20 MYS - activity updated through activity BLDA172 from case BLD08-00360.
Application received  2/28/2008  
Plans ACCEPTED BY PLAN TECH  2/28/2008  
Recd Pcfee & Taken To Pln CK  2/28/2008 DONE