Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD08-00374
StatusFinaled
Name CBH
Site Address 1046 N JULLION AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
This permit is for the construction of a new single family dwelling with two stories that total 2252 Square Feet. The first story is 928 sq. ft. with an attached garage of 441 sq. ft. The second story consists of three bedrooms and two bathrooms and is a total of 1324 sq. ft. THE PERMIT HOLDER is responsible to comply with R602.10 for wall bracing or use an engineered design. The sides of the property have five foot setbacks which require the eaves to be fire rated to one hour. Built per all approved plans, red-lining, and plan review report. R-1C zoning district and building setbacks per Planning and Zoning. (BSP)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/25/20084/25/20084/25/2008PDONE
DetailsMike Jordan
DOC - Permit Finaled4/25/20084/25/20084/25/2008PPASS
DetailsMike Jordan
BLD-Final4/23/20084/24/20084/24/2008PNR
DetailsMike Jordan
ray Phone #: ###-####. Needs plumbing final.
BLD-Framing/Rough-in3/27/20083/28/20083/28/2008APASS
DetailsMike Jordan
Phone #: ###-####. All issues resolved. ok to cover.
BLD-Energy code compliance3/27/20083/27/20083/27/2008PPART
DetailsMike Jordan
ray Phone #: ###-####. all issues resolved. ok to cover except for garage wall, south wall Still needs to add studs.
BLD-Energy code compliance3/26/20083/27/20083/27/2008AFAIL
DetailsMike Jordan
Ray; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Needs to remove sheetrock for energy code insp. Also all frami ng issues have not been repaired. called Ray with CBH to inform him . Will reschedule insp.
BLD-Framing/Rough-in3/25/20083/25/20083/25/2008PFAIL
DetailsMike Jordan
ray Phone #: ###-####. Complete lateral bracing on a3 and a3a trusses. Justify 2x4 exterior bearing wall supporting one floor and roof. (2x4 studs spaced at 2ft. oc.)
BLD-Framing/Rough-in3/24/20083/24/20083/24/2008PFAIL
DetailsMike Jordan
ray Phone #: ###-####. Needs to complete airseal package and provide truss engineering for framing insp. Needs to complete fir rated soffit construction on sides of house. Installation of weather barrier not completed, also needs to be installed horizontally, not verticall as per sec. 703.2 of IRC. Also lap seams min 2 inches. c/n posted. not ok to cover.
BLD-Foundation3/12/20083/12/20083/12/2008APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/12/2008 at 6:10:29 AM. Contact: ###-####.
BLD-Footing3/11/20083/11/20083/11/2008PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/11/2008 at 6:06:57 AM. Contact: ###-####.
Issue PAID IN FULL permit  3/7/2008 DONE
Telephone call  3/6/2008 DONE
left vm for carrie at ###-#### - permit ready and fees given
Permit Ready to Issue  3/6/2008 DONE
Plan assigned to (BSP)3/5/20083/5/20083/5/2008 PASS
DetailsBen S. Pavelka
3/5/2008 09:38:13 BSP - activity updated through activity BLDA022 from case BLD08-00374.
Case Summary (BLD)  3/5/2008  
PLANS/APPL TAKEN TO FRONT DESK  3/5/2008 DONE
Inspection Record Card- Bld  3/5/2008 DONE
Pending Assignment by SRZ2/29/2008 3/5/2008 DONE
DetailsBen S. Pavelka
Routing - PLAN CHECK3/4/2008 3/5/2008 PASS
DetailsBen S. Pavelka
Routing - PLANNING2/29/2008 3/4/2008 PASS
DetailsLucinda Grames
Routing - PUBLIC WORKS3/4/2008 3/4/2008 PASS
DetailsLouise Waldorf
Plans ACCEPTED BY PLAN CHECK  3/4/2008 PASS
DetailsBen S. Pavelka
Application received  2/29/2008  
Routing - Addressing2/29/2008 2/29/2008 PASS
DetailsLucinda Grames