First Notice | 8/26/2014 | 8/26/2014 | 10/6/2014 | | DONE |
Candy A. Nichols
|
|
|
sent in mail 10-6-14
|
BLD-Aging Inspection | 8/22/2014 | 8/22/2014 | 8/26/2014 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 8/26/2014 | 8/26/2014 | 8/26/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 5/14/2014 | 5/14/2014 | 5/22/2014 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 2/11/2014 | 2/12/2014 | 2/12/2014 | A | PASS |
Dave Hannah
|
|
|
Boyd Phone #: ###-####
|
BLD-Final | 2/7/2014 | 2/10/2014 | 2/12/2014 | A | PEND |
Dave Hannah
|
|
|
Boyd Phone #: ###-#### need city approved plans on site
|
Zoning Approval | 2/6/2014 | 2/6/2014 | 2/6/2014 | | DONE |
Matthew A Halitsky
|
|
|
Door and window changes per DRH08-00168 approved.
|
FIRE-Final Inspection | 2/5/2014 | 2/5/2014 | 2/5/2014 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 9/9/2013 | 9/11/2013 | 9/12/2013 | P | NR |
Dave Hannah
|
|
|
call to meet // Nick Guho Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 9/9/2013 | | DONE |
|
|
|
plan mod issued
|
Inspection Record Card- Bld | | | 8/27/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 8/27/2013 | | DONE |
Christina Prado
|
|
|
called Jessica to advise permit is ready for pick up
|
Permit Ready to Issue | | | 8/27/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 8/8/2013 | 8/8/2013 | 8/23/2013 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 8/8/2013 | | 8/23/2013 | | PASS |
Carl Westfall
|
|
|
Some work moved to permit BLD08-01293.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2013 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/8/2013 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for Bld08-01293 & Bld08-00378 (8th Street Marketplace) to organize the previously approved phased work in (2) phases, clearly identifying remaing work to be completed to install an updated Smoke Evacuation System in the Mercantile Bldg. Originally the (3) phased project was under two different permit numbers. The majority of work under Bld08-00378 has been completed, with the exception of the construction of the smoke exhaust plenum - sheet a5.12 from Bld08-00378 is now included in the Phase 2 (Bld08-01293) work and part of our Plan Modification request is for Bld08-01293. Per sheet a5.12 - there is NO change in the structura design, only including scope in the new Phase 2; submitted on plan sheets a0.01, a0.02, a3.12, a3.13, a5.12, and structural calcs; routed to Carl Westfall.
|
BLD-Aging Inspection | 3/13/2013 | 3/13/2013 | 3/13/2013 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 12/3/2012 | 12/3/2012 | 12/11/2012 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/9/2012 | 1/9/2012 | 1/10/2012 | | PEND |
Dave Hannah
|
|
|
|
BLD-Conference | 8/30/2011 | 8/30/2011 | 8/30/2011 | P | DEFR |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/10/2011 | 8/10/2011 | 8/12/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/14/2011 | 4/14/2011 | 4/14/2011 | | DEFR |
Dave Hannah
|
|
|
|
BLD-Conference | 1/13/2011 | 1/13/2011 | 1/19/2011 | P | DEFR |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/1/2010 | 11/1/2010 | 11/9/2010 | | FAIL |
Dave Hannah
|
|
|
no final scheduled
|
BLD-Aging Inspection | 9/1/2010 | 9/1/2010 | 9/1/2010 | | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 6/1/2010 | 6/1/2010 | 6/1/2010 | P | PASS |
Forrest France
|
|
|
Items on previous correction notice field verified for completion, fire life safety passed.
|
FIRE-Conference | 5/4/2010 | 5/4/2010 | 5/4/2010 | P | DONE |
Forrest France
|
|
|
|
FIRE-Final Inspection | 4/27/2010 | 4/29/2010 | 5/3/2010 | A | PART |
Forrest France
|
|
|
Final pending exit sign placement/ door hardware issues at a third floor corridor and atrium bridgeway.
|
Plan Reviewer's activity | | | 4/29/2010 | | DONE |
Jason Blais
|
|
|
New updated Upgrade Agreement attached to case. The Upgrade Agreement is being tracked under building permit BLD08-01293. The Agreement is attached to that case as well. New date to complete the work is June 30, 2013.
|
FIRE-Conference | 5/4/2009 | 5/4/2009 | 5/4/2009 | A | DONE |
Forrest France
|
|
|
In progress
|
BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/20/2009 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### ok to cover door framing at top of stairs second floor
|
FIRE-Final Inspection | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | CANC |
Forrest France
|
|
|
Rick- life safety Phone #: ###-####
|
BLD-Framing/Rough-in | 2/18/2009 | 2/18/2009 | 2/19/2009 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-####
|
(F) Reprint permit | | | 2/13/2009 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/13/2009 | | DONE |
Tisha Gallop
|
|
|
plan mod picked up and paid for
|
Plan assigned to (CJW) | 1/26/2009 | 1/26/2009 | 2/12/2009 | | PASS |
Carl Westfall
|
|
|
2/12/2009 09:01:18 CJW - activity updated through activity BLDA022 from case BLD08-00378.
|
Routing - PLAN CHECK | 1/26/2009 | | 2/12/2009 | | PASS |
Carl Westfall
|
|
|
(1-29-09) Looked at the plan modification. The design is not compatible with the future smoke control system. Sent E-mail to the Architect's rep. asking that the smoke control engineer be involved in the design and that revised drawings be submitted. (2-12-09) Reviewed revised / resubmitted / modified drawings. Approved Plan Modification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2009 | | DONE |
|
|
|
|
Telephone call | | | 2/12/2009 | | DONE |
|
|
|
t/c w tegan at ###-#### - permit ready and fees given (plan mod)
|
Permit Ready to Issue | | | 2/12/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/6/2009 | | |
Carl Westfall
|
|
|
Rec'd one copy of response letter and two copies of sheet a4.40- taken to Carl W
|
Plan Modification Accepted | | | 1/26/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Rec'd plan mod for: addition of non-rated store front glazing at public area within existing atrium to provide security after business hours. Doors will not be connected to the fire alarm system,doors will have panic hardware and allow access for egress after business hours- two copies of sheets a2.12, a4.40, and a6.11
|
Plan assigned to (CJW) | 12/29/2008 | 12/29/2008 | 12/29/2008 | | PASS |
Carl Westfall
|
|
|
12/29/2008 10:25:46 CJW - activity updated through activity BLDA022 from case BLD08-00378.
|
Routing - PLAN CHECK | 12/29/2008 | | 12/29/2008 | | PASS |
Carl Westfall
|
|
|
Plan modification approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/29/2008 | | DONE |
|
|
|
t/c w tegan at ###-#### - permit ready and fees given (plan mod)
|
Permit Ready to Issue | | | 12/29/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/29/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/29/2008 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 12/29/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
Rec'd plan mod for the existing door and adjacent windown at the west side of "bridge305" will be replaced with a new 1 hour fire wall and fire door to swing in the opposite direction- sheets a2.03 & a2.13
|
Case Summary (BLD) | | | 12/22/2008 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/12/2008 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 10/10/2008 | 10/10/2008 | 11/10/2008 | | PASS |
Carl Westfall
|
|
|
11/10/2008 13:29:52 CJW - activity updated through activity BLDA022 from case BLD08-00378.
|
Routing - PLAN CHECK | 10/10/2008 | | 11/10/2008 | | PASS |
Carl Westfall
|
|
|
(10-15-08) Started the plan modification review. Problems with structural design, etc. E-mailed Tegan and Andy. (11-10-08) Completed the plan modification review. Drawings approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/10/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/10/2008 | | DONE |
|
|
|
|
Telephone call | | | 11/10/2008 | | DONE |
|
|
|
t/c w tegan at ###-#### - permit ready and fees given (plan mod)
|
Permit Ready to Issue | | | 11/10/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/10/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/4/2008 | | |
|
|
|
received transmittal from erstad arch, (2) pages, "2" sets of structural calcs (8) pages each---"2" sheets each of a5.11, & a5.12-- plans taken to Carl Westfall
|
Plan Modification Accepted | | | 10/10/2008 | | |
|
|
|
Plan Modification excepted for BLD08-00378 for the need to install the mechanical plenum at this time in lieu of the temporary roof at the specified skylight opening. The additionaldemolition of a second skylight to accommodate the mechanical plenum. The existing structure that the new curb must sit on is very close to the next northern skylignt.To alleviate any future maintenance problems and ensure the plenum sits squarely on the existing structure we are proposing the removal of the adjacent skylight as noted on the submitted drawings. Note: In case there are problems with the fabrication of the plenum I decided to leave detail 19/a5.11 as it was approved by Keith Jones. Therefore if there are anyissues we have the nessary information already approved and specified. This detail already called out the location for the future plenum. For the plenum I have provided a new detail that is accompained by the calculations 20/a5.11. Unless instructed otherwise, after your approval I will issue this sheet as ASI # 15 to the contractor, witch is noted in the revisions aection of the title block. Plans routed to Carl W.
|
CHANGE STATUS TO (ISS) | | | 10/3/2008 | | |
Tisha Gallop
|
|
|
picked up and paid for plan mod
|
Plan assigned to (CJW) | 9/16/2008 | 9/16/2008 | 10/1/2008 | | PASS |
Carl Westfall
|
|
|
10/1/2008 13:21:30 CJW - activity updated through activity BLDA022 from case BLD08-00378.
|
Routing - PLAN CHECK | 9/16/2008 | | 10/1/2008 | | PASS |
Carl Westfall
|
|
|
Plan modifications submitted on Sept 16 and on Sept 23 approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/1/2008 | | DONE |
|
|
|
|
Telephone call | | | 10/1/2008 | | DONE |
|
|
|
t/c w teagan at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/1/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/30/2008 | | |
Carl Westfall
|
|
|
Received resubmittal for plan mod; transmittal, three copies of structural calcs and three copies of page A5.11; taken to Carl Westfall
|
Plan Modification Accepted | | | 9/23/2008 | | |
Tisha Gallop
|
|
|
Plan modification accepted for Bld08-00378 (The Mecantile Bldg - 8th St. Marketplace - 404) to extend suite 162; removal of existing storefront and non-rated swinging door at adjacent corridor. Demolition of existing wall to provide new cased opening at adjacent corridor. New storefront to match building standard will be installed at suite 162. New finishes will be provided in adjacent corridor. Existing fire door at end of corridor will not change; submitted on sheets a2.01, a2.11, and revised cert of value which adds $7,000 to project value; routed to Carl Westfall
|
Plan Modification Accepted | | | 9/16/2008 | | |
Tisha Gallop
|
|
|
Plan modification accepted for Bld08-00378 (The Mercentile Building (shell)- 8th Street Marketplace - 404) for in preparation for an additional building permit timing is requiring that a portion of that work be done under the existing building permit. Scaffolding will be in place for a limited amount of time and for cost issues we should move forward with the interior scope of the future atrium smoke modification. This plan modification only includes the removal, rather than repair of one skylight and the installation of the decorative grille at the interior. This will require a temporary cover and barrier at the future placement of a new plenum; submitted on pages a2.04, a2.14, a5.11 and revised cert of value; routed to Carl Westfall
|
Received Certificate of Value | | | 9/16/2008 | | DONE |
Tisha Gallop
|
|
|
submitted with Plan Modification; New project value is $529,317, all other values remain the same
|
Additional plans submitted | | | 9/9/2008 | | DONE |
Barbara Stitt
|
|
|
Received 4 copies of a letter to Dave Hanneman & George Slane dated 9-8-08 (2 pgs) from Andy Erstad, 1 to Jenifer Gilliland, 1 george Slane, 1 to Sam Rogers, 1 to Carl Westfall///9-9-08 BAS
|
BLD-Framing/Rough-in | 9/2/2008 | 9/3/2008 | 9/3/2008 | A | PART |
Dave Hannah
|
|
|
early as possible//Rick ###-#### -- suites 250, 246, 216 r/i for storefront framing///men's restrooms suites 312, 313 grid inspection for drywall ok to cover
|
BLD-Concrete | 8/18/2008 | 8/19/2008 | 8/19/2008 | P | PASS |
Dave Hannah
|
|
|
rick Phone #: ###-####
|
BLD-Framing/Rough-in | 8/14/2008 | 8/15/2008 | 8/15/2008 | P | PART |
Dave Hannah
|
|
|
Rick Phone #: ###-#### 3rd floor restrooms ok to cover walls
|
Plan assigned to (CJW) | 8/6/2008 | 8/6/2008 | 8/13/2008 | | PASS |
Carl Westfall
|
|
|
8/13/2008 10:48:13 CJW - activity updated through activity BLDA022 from case BLD08-00378.
|
Routing - PLAN CHECK | 8/6/2008 | | 8/13/2008 | | PASS |
Carl Westfall
|
|
|
Plan modification approved.
|
Routing - PLANNING | 8/13/2008 | | 8/13/2008 | | PASS |
Matthew A Halitsky
|
|
|
Review proposed exterior ramp.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2008 | | DONE |
|
|
|
|
Telephone call | | | 8/13/2008 | | DONE |
Tisha Gallop
|
|
|
called and left message for Tegan (Erstad Arch.) that plan mod is ready and fee
|
Permit Ready to Issue | | | 8/13/2008 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/13/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/13/2008 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/6/2008 | | |
Tisha Gallop
|
|
|
Accepted plan modification for Bld08-00378 (The Mercantile Bldg - 8th Street Marketplace - 404) due to the existing slope where the new accessible ramp was to be installed the required slope of the ramp could not be achived within the existing space. Therefore, we mush provide a switch back ramp the depth/width of the ramp changed from 5' to the minimum allowed. The length will not exceed 30' without a landing. The length will run the original length, provide a landing, and then switch back until the appropriate slope is achieved. A 5' clear area will be provided at the end of the ramp. This section will not exceed 15', it must be field verified. Materials and construction have not changed from original submitted drawings; submitted on sheet a1.11; routed to Carl Westfall
|
BLD-Framing/Rough-in | 6/10/2008 | 6/11/2008 | 6/11/2008 | A | PART |
Dave Hannah
|
|
|
Rick- ste- 204 206 214 Phone #: ###-#### store front window framing ok to cover
|
BLD-Framing/Rough-in | 6/4/2008 | 6/5/2008 | 6/5/2008 | A | PART |
Dave Hannah
|
|
|
rick Phone #: ###-#### ok to cover store front on 1st floor nw space
|
Issue PAID IN FULL permit | | | 5/20/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/16/2008 | | 5/19/2008 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions. ESC08-00436.
|
Routing - PLAN CHECK | 5/19/2008 | | 5/19/2008 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/19/2008 | | DONE |
|
|
|
|
Telephone call | | | 5/19/2008 | | DONE |
|
|
|
left message w tegan for andy erstad at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 5/19/2008 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 3/12/2008 | | 5/19/2008 | | PASS |
Carl Westfall
|
|
|
5/19/2008 08:32:18 CJW - activity updated through activity BLDA022 from case BLD08-00378.
|
Routing - PLAN CHECK | 5/15/2008 | | 5/16/2008 | | DONE |
Carl Westfall
|
|
|
Sent back to ESC.
|
Plan resubmittals received | | | 5/16/2008 | | |
Carl Westfall
|
|
|
Received 1 copy of ESC application and a waiver request letter dated 5-15-08 from Andy Erstad and taken to Carl Westfall's desk to insert with plans///5-16-08 @ 10:00am BAS
|
Routing - PUBLIC WORKS | 5/15/2008 | | 5/15/2008 | | DONE |
|
|
|
Another drinking fountain added.
|
Routing - PLAN CHECK | 5/12/2008 | | 5/15/2008 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmittal review.
|
Route to Impact Fee Review | 5/13/2008 | 5/16/2008 | 5/14/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 5/8/2008 | 5/8/2008 | 5/12/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 5/12/2008 | | FAIL |
|
|
|
Failed Plan Check, ESC & Planning.
|
Plan resubmittals received | | | 5/9/2008 | | |
|
|
|
Received transmittal and two copies of sheets a1.11, a2.01, a2.03, a2.10, a2.11, a2.13, a4.40, a6.11; taken to Carl Westfall
|
Routing - Erosion and Sediment | 5/7/2008 | | 5/8/2008 | | FAIL |
Steven Webb
|
|
|
Routing plans did not include an ESC permit application nor plan narrative as required by BMC 8-17. ESC permit is required due to exterior component of the project.
|
Routing - PLANNING | 5/6/2008 | | 5/7/2008 | | PASS |
Sarah Schafer
|
|
|
|
Routing PW Sewer Rating | 5/6/2008 | | 5/6/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PUBLIC WORKS | 5/5/2008 | | 5/6/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing - PLAN CHECK | 4/7/2008 | | 5/5/2008 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on May 1, 2008 and was finished on May 5, 2008. Revised drawings and additional information were required. See the plan review report.
|
Plan resubmittals received | | | 4/30/2008 | | |
|
|
|
Received transmittal and two copies of sheets a0.01, a2.00, a2.01, a2.10, a2.11, a6.11; taken to Carl Westfall
|
Plan resubmittals received | | | 4/22/2008 | | |
|
|
|
received transmittal from erstad arch, "2" sets of structural calcs. (10) pages each, & "2" more sets of structural calcs. (26) pages each. & "2" sets of plans with each sheet of aO.O1, a1.11, a1.12, a2.OO, a2.O1, a2.O2, a2.O3, a2.O4, a2.1O, a2.11, a2.12, a2.13, a2.14, a3.10, a3.11, a4.OO, a4.O1, a4.O2, a4.O3, a4.4O, a4.41, a4.42, a4.43, a5.11, a6.11, & s1.O--plans taken to Carl Westfall
|
Routing - PLANNING | 4/4/2008 | | 4/7/2008 | | FAIL |
|
|
|
To Julie A. to look at exterior changes.
|
Routing - PLAN CHECK | 3/12/2008 | | 4/4/2008 | | FAIL |
Carl Westfall
|
|
|
Unable to do a plan review because of insufficient information. E-mailed a request to the Archtect for more information.
|
Pending Assignment by MYS | 2/29/2008 | | 3/12/2008 | | DONE |
Marlene Southard
|
|
|
3/12/2008 09:21:15 MYS - activity updated through activity BLDA172 from case BLD08-00378.
|
Plans ACCEPTED BY PLAN TECH | | | 3/3/2008 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/29/2008 | | |
|
|
|
|
Application received | | | 2/29/2008 | | |
|
|
|
|