Permit Information
Permit NumberBLD08-00379
StatusFinaled
Name GUHO CORP
Site Address 405 S 8TH ST
Project Name8TH STREET MARKETPLACE
Customer Number 
ePlanReviewNo
Description
(8TH STREET MARKETPLACE - 405 SOUTH 8TH STREET - THE NORTHRUP BUILDING) (10-28-08 PLAN MODIFICATION TO REDUCE THE NUMBER OF TOILET FIXTURES WITHIN THE MEN'S RESTROOM LOCATED ON THE 3RD STORY TO ONE.) This building is fire sprinklered to substitute for 1-hr fire-resistance-rated construction of the building. To remodel the building core area in the basement, on the 1st story, on the 2nd story, and on the 3rd story of the 8th Street Marketplace building located at 405 S. 8th Street. Work is to include a 156 square foot floor infill within the existing atrium, new guards, new handrails, upgraded restrooms on the 3rd story, new doors at stairway intermediate landings in the atrium at the basement and 1st story, two new exterior double doors at grade, and interior finishes. The existing 1st story wheelchair lift will be maintained. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice5/22/20145/22/20146/5/2014 DONE
DetailsDave Hannah
BLD-Aging Inspection5/20/20145/20/20145/22/2014 PASS
DetailsDave Hannah
DOC - Permit Finaled5/22/20145/22/20145/22/2014APASS
DetailsDave Hannah
BLD-Final2/18/20142/19/20142/19/2014APASS
DetailsDave Hannah
Boyd Phone #: ###-####
FIRE-Final Inspection2/14/20142/18/20142/18/2014PPASS
DetailsForrest France
C/N items verified for completion. Scope of work finished. Fire life safety finaled.
FIRE-Final Inspection2/13/20142/18/20142/14/2014APART
DetailsForrest France
C/N items completed per contractor. Final walkthrough scheduled 2/18
BLD-Aging Inspection2/10/20142/10/20142/14/2014 PEND
DetailsDave Hannah
BLD-Final2/11/20142/12/20142/12/2014ANR
DetailsDave Hannah
Boyd Phone #: ###-#### needs fire life saftey final first
BLD-Aging Inspection10/22/201310/22/201310/23/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection7/23/20137/23/20137/24/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection3/11/20133/11/20133/13/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection11/29/201211/29/201212/7/2012 PEND
DetailsDave Hannah
BLD-Final8/21/20128/22/20128/22/2012PCANC
DetailsDave Hannah
DAVID Phone #: ###-####
FIRE-Final Inspection8/21/20128/22/20128/22/2012AFAIL
DetailsTroy Cobbley
Provide exit signs and emergency lighting on all floors as redlined by myself and Carl Westfall on the city approved plans. Also resubmit plans showing the new door at the basement intermediate level stairs being deleted. The "nuclear" exit signs are good until 2017.
BLD-Final8/20/20128/21/20128/22/2012PPART
DetailsDave Hannah
david Phone #: ###-#### project ok but needs fire final
BLD-Final8/17/20128/20/20128/20/2012PCANC
DetailsDave Hannah
David Phone #: ###-####/////Cancelled by David 8/20 11AM
BLD-Framing/Rough-in7/17/20127/19/20127/20/2012PPASS
DetailsDave Hannah
David Phone #: ###-####
Reopen Permit (ISS)  6/21/2012 DONE
DetailsBarbara Stitt
Re-open permit per Bob Archibald--6-21-12
First Notice9/1/20109/1/20109/9/2010 DONE
DetailsDave Hannah
DOC - Permit Expired9/1/20109/1/20109/1/2010PPASS
DetailsDave Hannah
DOC - Permit Finaled9/1/20109/1/20109/1/2010PPASS
DetailsDave Hannah
BLD-Aging Inspection8/25/20108/25/20109/1/2010 PASS
DetailsDave Hannah
Case Summary (BLD)  12/22/2008  
CHANGE STATUS TO (ISS)  10/31/2008 DONE
DetailsAlexandra L. DeYoung
(F) Reprint permit  10/31/2008 DONE
DetailsAlexandra L. DeYoung
Telephone call  10/29/2008 DONE
Details
left vm for tegan at ###-#### - permit ready and fees given
Permit Ready to Issue  10/29/2008 DONE
Details
Routing - PLAN CHECK10/24/2008 10/28/2008 PASS
DetailsCarl Westfall
Plan modification approved.
PLANS/APPL TAKEN TO FRONT DESK  10/28/2008 DONE
Plan assigned to (CJW)10/27/2008 10/28/2008 PASS
DetailsCarl Westfall
10/28/2008 15:13:09 CJW - activity updated through activity BLDA022 from case BLD08-00379.
Plan Modification Accepted  10/24/2008  
plan mod. excepted for bld08-00379 for the redesign of the third floor toilet room is reconfigured. one less fixture than was previoulsy provided to the mens room will currently be provided. if needed in the future an accessible additional restroom could be located where the current suite is. on sheets A2.o3 third floor demolition plan, A2.13 third floor plan & enlardged toilet room, A4.41 interior elevations. Routed to Carl Westfall
BLD-Framing/Rough-in9/11/20089/11/20089/12/2008PPART
DetailsDave Hannah
rick Phone #: ###-#### ok to cover shaftin basement
FIRE-Final Inspection9/11/20089/11/20089/11/2008PCANC
DetailsForrest France
Incorrect permit number request.
BLD-Aging Inspection8/11/20088/11/20088/11/2008 PASS
DetailsDave Hannah
wip
Issue PAID IN FULL permit  5/2/2008 DONE
Print Occupancy Form  4/28/2008 DONE
Telephone call  4/28/2008 DONE
Keegan ###-####
Routing - PLANNING4/26/2008 4/26/2008 PASS
DetailsCarl Westfall
The proposed exterior changes were deleted from the drawings. There will be no exterior changes under this permit. Approval from Planning not required.
Routing - PLAN CHECK4/24/2008 4/26/2008 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  4/26/2008 DONE
Plan assigned to (CJW)3/12/2008 4/26/2008 PASS
DetailsCarl Westfall
4/26/2008 10:06:21 CJW - activity updated through activity BLDA022 from case BLD08-00379.
Plan resubmittals received  4/25/2008  
DetailsCarl Westfall
Received 1 cover transmittal, 2 copies of sheets A2.01, A2.11, A6.11 and taken to Carl Westfall's desk///4-25-08 @ 9:00am BAS
Routing - PLANNING4/23/2008 4/24/2008 FAIL
DetailsJulie Archambeault
Replacement of exterior doors as shown on plans must first recieve a Certificate of Appropriateness prior to obtaining a building permit.
Routing - PLAN CHECK4/15/2008 4/23/2008 PASS
DetailsCarl Westfall
Approved after resubmittal review.
Plan resubmittals received  4/16/2008  
received 1 transmittal, 2 structural calcs,and 2 copies of sheets S1.0,A2.10,A2.11,A2.12,A2.13,A4.41,A5.11 taken to Carl W.
1st review completed  4/15/2008 FAIL
Failed plan check
Routing - FIRE4/11/2008 4/15/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK3/12/2008 4/11/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on April 7, 2008 and was finished on April 11, 2008. Revised drawings were required. See the plan review report.
Pending Assignment by MYS2/29/2008 3/12/2008 DONE
DetailsMarlene Southard
3/12/2008 08:01:33 MYS - activity updated through activity BLDA172 from case BLD08-00379.
Plans ACCEPTED BY PLAN TECH  3/3/2008  
Recd Pcfee & Taken To Pln CK  2/29/2008  
Application received  2/29/2008