BLD-Final | 12/10/2008 | 12/10/2008 | 12/10/2008 | P | PASS |
Dave Hannah
|
|
|
Harry Phone #: ###-####
|
DOC - Permit Finaled | 12/10/2008 | 12/10/2008 | 12/10/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 12/10/2008 | 12/10/2008 | 12/10/2008 | P | CANC |
Tom Arcoraci
|
|
|
###-####
|
BLD-Final | 12/9/2008 | 12/10/2008 | 12/10/2008 | A | NR |
Tom Arcoraci
|
|
|
harry Phone #: ###-####
|
Zoning Approval | 12/9/2008 | 12/9/2008 | 12/9/2008 | | PASS |
Sarah Schafer
|
|
|
Applicant has provided the City with a check for $1197 for the curb and gutter for the Trust per the substandard lot ordinance. ACHD has approved the alley and the concrete leading from Breneman to the grasscrete has been removed. The site is per the requirements of DRH08-00188.
|
Telephone call | | | 12/9/2008 | | DONE |
Sarah Schafer
|
|
|
Mindy Wallace from ACHD sent me an e-mail stating they are currently charging $20.50 per lineal foot for curb and gutter installation and materials. With 58.41 lineal feet of frontage, this applicant will be required to submit $1197.40 to the trust. An e-mail was sent to Mr. Blackshaw with this information. Both e-mails have been printed and are in file DRH08-00188.
|
Zoning Approval | 12/8/2008 | 12/8/2008 | 12/8/2008 | | FAIL |
Sarah Schafer
|
|
|
Meet Harry Haun (contractor) on site. Explained there needed to be a bond for the curb and gutter along Breneman, the alley needed to be paved and there was concrete that needed to be removed which created a drive way off of Breneman. (Alley access only was the agreement.) Mr. Haun was going to contact Mr. Blackshaw to let him know of the requirements.
|
Telephone call | | | 12/8/2008 | | DONE |
Sarah Schafer
|
|
|
I spoke with Mr. Blackshaw regarding the need to remove concrete at the drive way off of Breneman. At the same time he also asked for the cost of curb and gutter installation (I have contacted ACHD to receive this number) and stated that he had installed the alley paving. I asked that ACHD inspect and approve prior to me signing off on the occupancy requirements. Once I receive the information from them, I will e-mail the information to him.
|
BLD-Final | 12/5/2008 | 12/5/2008 | 12/5/2008 | P | NR |
Dave Hannah
|
|
|
HARRY Phone #: ###-#### needs a zoning final
|
BLD-Framing/Rough-in | 9/9/2008 | 9/9/2008 | 9/10/2008 | P | PART |
Dave Hannah
|
|
|
Harry Phone #: ###-#### it looks like c/n items are finished but still need to finish insulation on second level
|
BLD-Framing/Rough-in | 9/2/2008 | 9/3/2008 | 9/3/2008 | P | FAIL |
Tony Young
|
|
|
harry Phone #: ###-#### c/n posted,, ok to insulate
|
BLD-Other | 8/5/2008 | 8/6/2008 | 8/6/2008 | P | PART |
Tony Young
|
|
|
perry Note: shear Phone #: ###-#### not needed,, called Harry to let him know
|
BLD-Foundation | 7/8/2008 | 7/9/2008 | 7/9/2008 | A | PASS |
Jim Storey
|
|
|
lito - wall Phone #: ###-####
|
BLD-Footing | 7/8/2008 | 7/8/2008 | 7/8/2008 | P | PASS |
Jim Storey
|
|
|
Lito Phone #: ###-####
|
Inspection Record Card- Bld | | | 6/24/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/24/2008 | | DONE |
|
|
|
t/c w harry at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/24/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/24/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 6/24/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/24/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/23/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2008 | | DONE |
|
|
|
|
Routing - PLANNING | 6/20/2008 | | 6/20/2008 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH08-00188
|
Pending Assignment by SRZ | 3/4/2008 | | 6/20/2008 | | DONE |
Ben S. Pavelka
|
|
|
|
Routing - PUBLIC WORKS | 3/4/2008 | | 3/4/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - Addressing | 3/4/2008 | | 3/4/2008 | | PASS |
Chris Pichardo
|
|
|
|
Routing - PLANNING | 3/4/2008 | | 3/4/2008 | | PASS |
Andrea Tuning
|
|
|
Approved per DRH07-00598.
Staff redlined the requirement for curb, gutter and sidewalk on Breneman Street and added the approved landscape plan to the building set.
|
Application received | | | 3/4/2008 | | |
|
|
|
|
Routing - PLAN CHECK | 3/4/2008 | | | | FAIL |
|
|
|
Evan White called and said to put a hold on the plan review and indicated that his client may want to change the plans and that the changes may be significant enough to require a new Design review. 3-12-08 CDM.
I called Evan White to se if the plans were still on hold he said they were 3-26-08 CDM.
|
Routing - PLAN CHECK | 6/20/2008 | | | | PASS |
Ben S. Pavelka
|
|
|
|