Third Notice BLD | 12/22/2008 | 12/22/2008 | 3/9/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 11/7/2008 | 11/7/2008 | 12/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 10/9/2008 | 10/9/2008 | 11/7/2008 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 10/8/2008 | 10/8/2008 | 10/9/2008 | P | PASS |
Jim Storey
|
|
|
ron Phone #: ###-####
|
DOC - Permit Finaled | 10/9/2008 | 10/9/2008 | 10/9/2008 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 7/21/2008 | 7/22/2008 | 7/22/2008 | A | PART |
Jim Storey
|
|
|
ron Phone #: ###-#### screw sch and lap of gyp aplacation ok need to do top fo wall detail per plan.
|
Override - Parcel Holds | 7/21/2008 | 1/1/1900 | 7/21/2008 | | |
|
|
|
framing
|
BLD-Foundation | 7/8/2008 | 7/8/2008 | 7/8/2008 | P | PASS |
Jim Storey
|
|
|
Ian Phone #: ###-####
|
Override - Parcel Holds | 7/8/2008 | 1/1/1900 | 7/8/2008 | | |
|
|
|
insp only
|
BLD-Footing | 7/7/2008 | 7/7/2008 | 7/7/2008 | P | PASS |
Jim Storey
|
|
|
een Phone #: ###-####
|
Override - Parcel Holds | 7/7/2008 | 1/1/1900 | 7/7/2008 | | |
|
|
|
this not a final yet
|
BLD-Framing/Rough-in | 7/2/2008 | 7/2/2008 | 7/2/2008 | P | PART |
Mike Jordan
|
|
|
Ron Phone #: ###-####. 2nd layer 5/8 type X exterior rock on exterior side of 2hr. wall on gridline F. Noted architects to resubmit new details for column wrap and top of wall attachment on interior side.
|
Override - Parcel Holds | 7/2/2008 | 1/1/1900 | 7/2/2008 | | |
|
|
|
framing only
|
BLD-Wall cover | 6/30/2008 | 7/1/2008 | 7/1/2008 | P | PART |
Mike Jordan
|
|
|
Ron, early afternoon if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. 1st layer of 5/8 type X, exterior side, for 2hr. wall on gridline F.
|
BLD-Wall cover | 6/11/2008 | 6/12/2008 | 6/12/2008 | A | DONE |
Jim Storey
|
|
|
Ian Phone #: ###-#### cloned foudation wall insp.
|
BLD-Foundation | 6/12/2008 | 6/12/2008 | 6/12/2008 | P | PASS |
Jim Storey
|
|
|
Ian Phone #: ###-####
|
BLD-Foundation | 6/6/2008 | 6/6/2008 | 6/10/2008 | P | CANC |
Jim Storey
|
|
|
ian Phone #: ###-####
|
BLD-Footing | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | PART |
Jim Storey
|
|
|
ian Phone #: ###-#### pads ok verts in progress south wall ok si to be on site monday for the rest of the ft assembly.
|
(F) Reprint permit | | | 5/7/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/6/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/16/2008 | | 4/21/2008 | | PASS |
John Menard
|
|
|
|
Plan assigned to (JCM) | 3/5/2008 | | 4/21/2008 | | PASS |
John Menard
|
|
|
4/21/2008 08:19:47 JCM - activity updated through activity BLDA022 from case BLD08-00395.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2008 | | DONE |
John Menard
|
|
|
|
Inspection Record Card- Bld | | | 4/21/2008 | | DONE |
|
|
|
|
Telephone call | | | 4/21/2008 | | DONE |
|
|
|
t/c w tom williams at ###-#### - permit ready and fees given - also need ACHD receipt
|
Permit Ready to Issue | | | 4/21/2008 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 4/18/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved structural revisions. JCM
|
Routing - PUBLIC WORKS | 4/15/2008 | | 4/16/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Solid Waste | 4/15/2008 | | 4/15/2008 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 4/15/2008 | | 4/15/2008 | | PASS |
Walt Baumgartner
|
|
|
resubmittal of plans sheets for shell. Floor drain added thru oil/sed vault. Noted on plans that City approved design flamm inctp must be used. template drawing attached to both sets.
|
Routing - PLAN CHECK | 4/7/2008 | | 4/15/2008 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 4/14/2008 | | |
|
|
|
Received five copies of sheet C2, and two copies of sheets A1.2, A2.1, A4.2, S2.0, S3.0, P1.0, P1.1; inserted by arch. rep. and taken back to John Menard
|
Routing - FIRE | 4/2/2008 | | 4/7/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 4/7/2008 | | FAIL |
|
|
|
Failed PW, Structural
|
Routing - PLAN CHECK | 3/24/2008 | | 4/2/2008 | | PASS |
John Menard
|
|
|
John Menard
|
Routing Off Site - STRUCTURAL | 3/10/2008 | | 4/2/2008 | | FAIL |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 4/2/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved as submitted with attached comments. JCM
|
Plan resubmittals requested | | | 4/2/2008 | | DONE |
|
|
|
Faxed the architect a copy of the structural review requesting revisions. JCM
|
Plan resubmittals received | | | 3/31/2008 | | |
|
|
|
Received two copies of pages ESC1; inserted by owner and taken back to John Menard
|
Routing - PLANNING | 3/21/2008 | | 3/24/2008 | | PASS |
Andrea Tuning
|
|
|
Approved per DRH08-00022 and DRH08-00049. Note: The applicant is required to construct a five foot concrete sidewalk on Amity Street. Plans have been redlined. Andrea Tuning ###-####
|
Routing - PLUMBING | 3/14/2008 | | 3/21/2008 | | PASS |
Bill VanDegrift
|
|
|
groung work and site utilities only. per plans and 2003 upc
|
Received Certificate of Value | | | 3/17/2008 | | DONE |
Tisha Gallop
|
|
|
Received revised cert of value to split out grading/drainage into seperate permit (Bld08-00470); new project value for this permit is $198,259; ele n/a; plm $8,000; mech n/a; fire sprinkler $21,000; fire alarm $2,500//3/17/08 LEG
|
Routing PW Sewer Rating | 3/13/2008 | | 3/14/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Solid Waste | | | 3/14/2008 | | FAIL |
Peter J. McCullough
|
|
|
The trash enclosure is shown in two different locations on the site plans. One location is accessible, while the other is not. Plans need to show only one location; the location in the northeast corner of the building site is the only accessible location.
|
Routing - Erosion and Sediment | 3/14/2008 | | 3/14/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions, ESC08-00139.
|
Routing - PUBLIC WORKS | 3/6/2008 | | 3/14/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing PW Sewer Design | 3/10/2008 | | 3/13/2008 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Street Lights | 3/13/2008 | | 3/13/2008 | | PASS |
Bill Colson
|
|
|
|
Routing PW Drainage | 3/6/2008 | | 3/10/2008 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 3/10/2008 | | |
|
|
|
received "5" sheets of C3-- plans taken to Brian Murphy
|
Telephone call | | | 3/10/2008 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Plan routing begun/NEW & ADDTN | | | 3/6/2008 | | |
Tisha Gallop
|
|
|
|
Routing - PLANNING Land Div | 3/6/2008 | | 3/6/2008 | | PASS |
Dave Abo
|
|
|
Parcel is over 5 acres in size (7.876 acres).
|
Plans ACCEPTED BY PLAN TECH | | | 3/6/2008 | | |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/6/2008 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 3/5/2008 | | |
Tisha Gallop
|
|
|
|
Pending Assignment by MYS | 3/5/2008 | | 3/5/2008 | | DONE |
John Menard
|
|
|
3/5/2008 16:29:37 JCM - activity updated through activity BLDA166 from case BLD08-00395.
|
PubWorks Occupancy Approval | 10/15/2008 | 10/15/2008 | | | |
|
|
|
|