DOC-Permit Expired | 5/21/2010 | 5/21/2010 | 5/21/2010 | | DONE |
Mike Jordan
|
|
|
Permit expired by limitations.
|
PubWorks Occupancy Approval | 12/10/2008 | 12/10/2008 | 12/8/2008 | | |
|
|
|
|
BLD-Conference | 8/4/2008 | 8/4/2008 | 8/4/2008 | P | DONE |
Mike Jordan
|
|
|
|
Issue PAID IN FULL permit | | | 5/7/2008 | | DONE |
|
|
|
|
Plan assigned to (DLD) Darla | 3/7/2008 | 3/7/2008 | 5/6/2008 | | PASS |
Darla L Downs
|
|
|
5/6/2008 09:57:56 DLD - activity updated through activity BLDA022 from case BLD08-00398.
|
Routing - Erosion and Sediment | 5/5/2008 | | 5/6/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditons. ESC08-00140
|
Routing - PLAN CHECK | 5/6/2008 | | 5/6/2008 | | PASS |
Darla L Downs
|
|
|
Darla
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/6/2008 | | DONE |
|
|
|
|
Telephone call | | | 5/6/2008 | | DONE |
|
|
|
t/c w randy haverfield at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 5/6/2008 | | DONE |
|
|
|
|
Routing - PLUMBING | 5/2/2008 | | 5/5/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 4/30/2008 | | 5/2/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Design | 5/1/2008 | | 5/1/2008 | | PASS |
Jon R. Gunnerson
|
|
|
Sewer Tap Permit Required, Approximate location of existing sewer service depicted onto plans.
|
Plan resubmittals received | | | 5/1/2008 | | DONE |
|
|
|
5-1-08 received designation of contractors storm water professional ///dld
|
Plan resubmittals received | | | 4/30/2008 | | |
John Menard
|
|
|
Received 1 cover transmittal, 4 copies of sheet C4.01 and inserted into plans Advanced Engineering 4-30-08 @ 4:30pm BAS
|
Routing - PUBLIC WORKS | 4/18/2008 | | 4/21/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing PW Sewer Design | 4/18/2008 | | 4/21/2008 | | FAIL |
Jon R. Gunnerson
|
|
|
Engineer needs to submit revised set of utility sheet (C4.01).
|
Routing - PLAN CHECK | 4/21/2008 | | 4/21/2008 | | PEND |
Darla L Downs
|
|
|
Plans failed in PW , They are in the hold box- waiting for re-subs.
|
1st review completed | | | 4/9/2008 | | FAIL |
|
|
|
Failed PW, ESC, Plumbing, Planning
|
Routing - FIRE | 4/7/2008 | | 4/9/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 4/9/2008 | | 4/9/2008 | | FAIL |
Darla L Downs
|
|
|
Plans failed in Public Works, ESC, Plumbing plans in hold box waiting resubmittals ///dld
|
Routing - PLANNING | 4/3/2008 | | 4/7/2008 | | PASS |
Susan Riggs
|
|
|
Susan R. CUP07-00124
|
Routing - PLUMBING | 3/25/2008 | | 4/3/2008 | | FAIL |
Bill VanDegrift
|
|
|
show new water service location. public works must pass review prior to plumbing review acceptance.
|
Routing - Erosion and Sediment | 3/21/2008 | | 3/25/2008 | | FAIL |
James Rogers
|
|
|
Contractor listed but no RP listed
|
Routing - PUBLIC WORKS | 3/21/2008 | | 3/21/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing PW Sewer Design | | | 3/21/2008 | | FAIL |
Jon R. Gunnerson
|
|
|
|
Routing PW Sewer Rating | 3/19/2008 | | 3/21/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Street Lights | | | 3/13/2008 | | PASS |
Bill Colson
|
|
|
|
Routing PW Drainage | 3/7/2008 | | 3/12/2008 | | PASS |
Brian Murphy
|
|
|
|
1st review completed | | | 3/7/2008 | | |
Darla L Downs
|
|
|
Plans stamped and routed to next step
|
Routing - PLANNING Land Div | 3/7/2008 | | 3/7/2008 | | PASS |
Joan Johnson
|
|
|
grading and drainage
|
Plan routing begun/NEW & ADDTN | | | 3/7/2008 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/7/2008 | | |
|
|
|
|
Application received | | | 3/5/2008 | | |
|
|
|
|